NRL Embarks into Bio-Ethanol Project from Bamboo Biomass · MMT Total availability 55 Project...
Transcript of NRL Embarks into Bio-Ethanol Project from Bamboo Biomass · MMT Total availability 55 Project...
“A Brief Presentation”
NRL Embarks into
Bio-Ethanol Project
from Bamboo Biomass
WHY BAMBOO? Annual harvestable bamboo stock (Million MT)
MMT
Total availability
55 Project Requirement
MMT 0.5
14
12 8
11
7
Sustainability of Bio mass
Technical assistance for
selection of bamboo
chipping machines and
other infrastructures.
Maintenance of the
chipping machines and
easy access to
transporters for chipped
bamboo.
Direct Bank Payment on
delivery of chipped
bamboo to bio-refinery
Local Level
Aggregators
Pool of registered
transporters with GPS
enabled vehicles.
Technology based logistics
system to minimise
transportation time and
cost .
Direct Bank Payment on
delivery
Transporters
Supply of high yield
variety saplings
Training on scientific
plantation and harvesting
techniques
Direct Bank Payment on
delivery of material to LLAs
Bamboo
Growers
Block Chain Based Software Solution for Bamboo Supply Chain
Feed Handling
• Chipper machine • Chips from outside • Belt Conveyor & Silo
Cellulose Wash • Wash drum / Presser • With Acid / water • MC pump
Cooking
• Digester (4x220m3)
• With Bio solvent
Hydrolysis
• Hydrolysis Reactor (4x2400m3)
• With Enzyme
Fermentation
• Fermenter (4x1400m3)
• With Yeast
Ethanol Separation • Distillation Column • Dehydration Absorber
Chemical Recovery • formicopure tech. • Acetic Acid/ Furfural
Evaporation
• Evaporator • Bio Solvent Recycle • Bio –Coal & Stillage
Combined Heat
Power • STG • Boiler
FEED
PROCESS
INTEGRATION WITH REFINERY
Existing Refinery
Bio Refinery
Steam
Cooling Water
DM Water
Instrument Air
Nitrogen
Effluent
Power
Products Tons/year Uses
Ethanol 49600 To be blended with motor
spirit as per govt policy
Acetic acid 9600 Uses as preservative ,
industrial solvent , medical
use
Furfural 18400 For making furfural
alcohol,furan resin etc
Bio coal 156800 As fuel for CHP
Stillage 29600 As fuel for CHP
CO2 48800 As dry ice , inertization
BIO-REFINERY PRODUCT PROFILE
Green fuel for Greener future
Project Milestones
Environmental Clearance : 06.11.2017
NITI Ayog approval for JV formation: 11.04.2018
JV agreement : 24.04.2018 (NRL:Fortum:Chempolis)
Tech. Licensing Agreement: 05.07.2018
Incorporation of JV Company: 04.06.2018
EPCM Contract Award: 24.08.2018.( M/s EIL)
Project Zero Date : 11.09.2018.
Mechanical completion Date : 10.01.2021.(28 months)
Commissioning Date : 10.04.2021 ( 03 months )
Civil job started from Dec 2018.
Products Tons/year
Dry Bamboo 300000
Formic Acid 4000
Enzyme 1600
Nutrient (East and Urea) 800
Water 5600
BIO-REFINERY INPUTS