NORTHWEST RAIL ELECTRIFIED SEGMENT - FasTracks · northwest rail electrified segment overall...
Transcript of NORTHWEST RAIL ELECTRIFIED SEGMENT - FasTracks · northwest rail electrified segment overall...
305+
00
307+
47
307+
47
307+46.9
4
PO
B
285+
00
290+
00
295+
00
300+
00
B
C
NORTHWEST RAIL ELECTRIFIED SEGMENT
OVERALL ELECTRICAL SITE PLAN ES-300
JCC
JCC
JAB
50 100 1500
SCALE IN FEET
TRAIN CONTROL HOUSE
COMM HOUSE
RTD EQUIPMENT CASE
RE: ES-330 TO ES-332
RE: ES-320 TO ES-322
STATION PLATFORM
A
KSP
JEK
WESTMINSTER STATION
LC EC NB/SB TRACK
BNSF TRACK
C RELOCATEDL
RE: ES-350 & ES-351
UNDERPASS
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
XCEL TRANSFORMER
PCC
05/29/14
08/08/14
08/08/14
RE: ES-361
FARE COLLECTION EQUIPMENT
RE: ES-360
STATION SHELTER
STATION CANOPY ABOVE
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
Pending
JAB 08/08/14ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
00.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
8 16 240
SCALE IN FEET
B
C
NORTHWEST RAIL ELECTRIFIED SEGMENT
ES-320
MA
TC
HLIN
E S
EE E
S-3
21
CONDUIT ROUTING PLAN
TRAIN CONTROL HOUSE
JCC
JCC
JABTRANSITION PLAZA/PLATFORM
CONDUIT KEY NOTES: (APPLIES TO SHEETS ES-320 TO ES-322) DRAWING NOTES: (APPLIES TO SHEETS ES-320 TO ES-322) GENERAL NOTES: (APPLIES TO SHEETS ES-320 TO ES-322)
1
2
3
4
5
6
COMM HOUSE TRANSFORMER
XCEL ENERGY CASE
RTD EQUIPMENT
A
KSP
JEK
WESTMINSTER STATION
BNSF TRACK
C RELOCATEDL
LC NWES NB/SB TRACK
PCC
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
05/29/14
STATIONS:(1)4" VMS POWER, (1)4" ETHERNET/FIBER, (1)4" PA SPEAKER, (3)4" SPARE.
SYSTEMS WIDE: FO-N02116(1-7 CELL MICRO), (1)4" RTD SCADA.
STATIONS:(1)4" VMS POWER, (1)4" ETHERNET/FIBER, (1)4" PA SPEAKER, (3)4" SPARE, (1)2" GROUND GRID.
OF 36" BELOW TOP OF TIE.
ALL CONDUITS ROUTED UNDER TRACKS TO BE IN CONCRETE ENCASED DUCT BANK, BURIED MINIMUM
REFERENCE DETAIL 3/ES-380 FOR TVM/SAV/E-TEL SCHEMATIC.
(1)1-1/4" QUAD DUCT (COMM), AND (1)2" SPARE (COMM).
(1)1-1/4" QUAD DUCT (POWER), AND (1)2" SPARE (POWER).
NOT ALL KEY SYMBOLS APPEAR ON EVERY SHEET.
GENERAL: THESE CONDUIT KEY NOTES APPLY ALL CONDUIT ROUTING PLANS ES-320 TO ES-322.
#
SECURITY SHALL BE COORDINATED WITH THE CITY'S PLANS FOR THE NORTH PLAZA.
3. ELEVATION AND LOCATION OF CONDUIT FOR COMMUNICATIONS AND LIFE SAFETY AND
LOCATIONS. REFERENCE AND COORDINATE WITH FINAL DESIGN CCTV SYSTEMS PLANS.
THESE PLANS ARE NOT MEANT TO INDICATE CAMERA TYPES, DIRECTION OR EXACT
2. CCTV CAMERAS SHOWN ARE APPROXIMATE LOCATIONS FOR CONDUIT ROUTING ONLY.
CONDUIT REQUIREMENTS.
CDRL#7B-21.12.03. REFERENCE SHEETS ES-360, 361, 370, 380, 381 FOR ADDITIONAL
FOR POWER, COMM, VMS, PA WITH XORAIL PLANS AND SYSTEMS WIDE CONDUIT PLANS,
NECESSARY FOR COMPLETE INSTALLATION. COORDINATE ALL BRANCH CONDUIT
PLATFORMS AND TRANSITION PLANS. PLANS DO NOT INDICATE ALL CONDUITS
ARRANGEMENT OF MAIN POWER/COMMUNICATIONS PULLBOXES AT STATIONS
1. CONDUIT ROUTING PLANS ARE DIAGRAMMATICAL AND INDICATE GENERAL
08/08/14
08/08/14
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
Pending
JAB 08/08/14
WALL FOOTING. COORDINATE WITH CITY OF WESTMINSTER.
11. PROVIDE (2) 6" PVC SCHEDULE 80 CONDUITS AT 0.5% SLOPE TO SOUTH. EXTEND 3'-0" BEYOND RETAINING
7B-21.12(.00,.01,.03). REFER TO WESTMINSTER STATION COMM AND TES CONDUIT ONE-LINE DIAGRAM.
HANDHOLES, PULL BOXES AND SYSTEMS CONDUIT. CDRL# 7B-21.03, 7B-21.11(.00,.01,.02,.03),
10. REFER TO TRACTION ELECTRIFICATION SYSTEM PLANS AND SYSTEMS CONDUIT ROUTING PLANS FOR ALL
9. REFERENCE SHEET ES-351 FOR J-BOX AND CONDUIT REQUIREMENTS FOR FUTURE ARCHITECTURAL LIGHTING.
CDRL# 7B-21-12.03.
SYSTEMS PLANS AND SHOP DRAWINGS PRIOR TO ROUGH-IN. REFER TO SYSTEMS WIDE CONDUIT PLANS
8. COORDINATE CONDUIT STUB UP LOCATIONS FOR ALL COMM SHELTERS AND ENCLOSURES WITH FINAL
XORAIL PASSENGER INFORMATION SYSTEM PLANS.
7. SPEAKERS: CONDUIT PER PLANS TO NEAREST COMM PULLBOX. REFER TO COMMUNICATIONS PLANS AND
REFER TO COMMUNCATIONS PLANS, AND XORAIL SYSTEMS PLANS.
6. CAMERAS: CONDUIT PER PLANS TO NEAREST COMM PULLBOX. LABEL CONDUITS "SECURITY CONDUITS".
TO PHONES.
PUBLIC PHONES & EMERGENCY PHONES, REFERENCE DETAIL 3/ES-380 FOR CONDUIT REQUIREMENTS
5. REFERENCE ARCHITECTURAL SIGNAGE AND COMMUNICATION SYSTEMS PLANS FOR LOCATIONS OF
4. FUTURE FARE COLLECTION EQUIPMENT LOCATION. REFERENCE CONDUIT REQUIREMENTS ON DETAIL 3/ES-380.
3. POWER AND COMMUNICATIONS HAND HOLE. REFERENCE DETAIL 2/ES-380.
UNDER PLATFORM WITH CONDUIT ROUTED IN CRAWLSPACE. RE:ES-340.
2. POWER AND COMMUNICATIONS PULLBOX. REFERENCE DETAIL 1/ES-381. BOX TO BE LOCATED
1. POWER AND COMMUNICATIONS PULLBOX. REFERENCE DETAIL 1/ES-380.
NOT ALL KEY SYMBOLS APPEAR ON EVERY SHEET.
GENERAL: THESE DRAWING NOTES APPLY TO ALL CONDUIT ROUTING PLANS ES-320 TO ES-322.
ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
20.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
8
8
(1)1-1/2"(POWER)
8(2)2"(POWER)
(3) 4"C (2 COMM, 1 POWER)
RTD (2) 4"C (1 COMM, 1 POWER)
10
5
10
10
6
10
10
10
1 2
7
(1)1"(POWER)
(2)1"(COMM)
1
10
MH MH
MH
MH, TYPE 2, 4X4
INTERFACE
STATION
HH
MH
MH-SC-G04263
305+00
295+008 16 240
SCALE IN FEET
B
C
NORTHWEST RAIL ELECTRIFIED SEGMENT
MA
TC
HLIN
E S
EE E
S-3
20
ES-321
# CONDUIT KEY NOTES
DRAWING NOTES:
CONDUIT ROUTING PLANS ES-320 TO ES-322.
REFERENCE SHEET ES-320 FOR ALL CONDUIT KEYNOTES. APPLIES TO
CONDUIT ROUTING PLANS ES-320 TO ES-322.
REFERENCE SHEET ES-320 FOR ALL DRAWING NOTES. APPLIES TO
MA
TC
HLIN
E S
EE E
S-3
22
CONDUIT ROUTING PLAN
JCC
JCC
JABTRANSITION PLAZA/PLATFORM
ON NORTH SIDE OF UNDERPASS IN PLAZA AREA.
BY SOUTH WESTMINSTER DEVELOPER
EXACT LOCATION TO BE DETERMINED
A
KSP
JEK
WESTMINSTER STATION
LC EC NB/SB TRACK
BNSF TRACK
C RELOCATEDL
RE: ES-350, ES-351
UNDERPASS
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
05/29/14
08/08/14
08/08/14
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
Pending
LINE OF CANOPY ABOVE
JAB 08/08/14
RE: ES-350, ES-352
ROOM UNDER STAIRS
ELEVATOR MACHINE
RE: ES-350, ES-352
UNDER STAIRS
ELECTRICAL ROOM
RE: ES-350
UNDER STAIRS
STORAGE ROOM
ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
21.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
7
JB1
JB
2
JB
2
FOR FUTURE CCTV.
(3)4"C(2 COMM, 1 POWER)
EQUIPMENT.
FOR FAIR COLLECTION
RTD (2)4"C(1 COMM, 1 POWER)
4
1
5
6
77
7 7
6
P
4
J J
9
J J
9
11
CC
COMM CASE
21 2
1 21 2
JB
2
E
4
6
6
6LOWER LEVEL. RE: ES-350
TO PULLBOX BELOW AT
5E
6
6 (1)1"(POWER)
(1)1"(COMM)
3
1 2
(1)1"(POWER)
(1)1"(COMM)
3
(1)1"(POWER)
(2)1"(COMM)(1)1"(POWER)
(2)1"(COMM) (1)1"(POWER)
(2)1"(COMM)(1)1"(POWER)
(2)1"(COMM)
(1)1"(POWER)
(2)1"(COMM)
(1)1"(POWER)
(1)1"(COMM)
(2)1"(POWER)
(1)1"(COMM)
(1)1"(POWER)
(2)2"(COMM)
7
(1)1"(POWER)
(2)1"(COMM)
6ABOVE.
MOUNTED TO CANOPY
ABOVE.
MOUNTED TO CANOPY
6
(1)1"(POWER)
(2)1"(COMM)
(1)1"(POWER)
(1)1"(COMM)
(1)1"(POWER)
(2)1"(COMM)
(1)1"(DMX CONTROL)
(1)1"(POWER)
(2)1"(COMM)
(1)1"(POWER)
(1)1"(COMM)
RE:ES-352
BELOW STAIRS.
TO ELECTRICAL ROOM
(1)1"(DMX CONTROL)
RE:ES-352
BELOW STAIRS.
TO ELECTRICAL ROOM
(1)1"(DMX CONTROL)
7
WALL MOUNTED WALL MOUNTED
11
8 16 240
SCALE IN FEET
B
C
NORTHWEST RAIL ELECTRIFIED SEGMENT
MA
TC
HLIN
E S
EE E
S-3
21
ES-322
# CONDUIT KEY NOTES
DRAWING NOTES:
CONDUIT ROUTING PLANS ES-320 TO ES-322.
REFERENCE SHEET ES-320 FOR ALL CONDUIT KEYNOTES. APPLIES TO
CONDUIT ROUTING PLANS ES-320 TO ES-322.
REFERENCE SHEET ES-320 FOR ALL DRAWING NOTES. APPLIES TO
CONDUIT ROUTING PLAN
JCC
JCC
JABTRANSITION PLAZA/PLATFORM
A
KSP
JEK
WESTMINSTER STATION
BNSF TRACK
C RELOCATEDL
LC EC NB/SB TRACK
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A 05/29/14
08/08/14
08/08/14
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
Pending
JAB 08/08/14ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
22.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
JB
2
6
7
7
(1)1"(POWER)
(2)1"(COMM)
(1)1"(POWER)
(2)1"(COMM)
7
(1)1"(POWER)
(2)1"(COMM)
(1)1"(POWER)
(2)1"(COMM)
(2)1"(POWER)
(1)1"(COMM)
(1)1"(POWER)
(1)1"(COMM)
8 16 240
SCALE IN FEET
B
C
NORTHWEST RAIL ELECTRIFIED SEGMENT
ES-330
MA
TC
HLIN
E S
EE E
S-3
21
JCC
JCC
JAB
ELECTRICAL PLAN
TRANSITION PLAZA/PLATFORM
TRAIN CONTROL HOUSE
COMM HOUSE
PCC
TRANSFORMER
XCEL ENERGY
DRAWING NOTES: (APPLIES TO SHEETS ES-ES-330 TO ES-332)
CASE
RTD EQUIPMENT
A
KSP
JEK
WESTMINSTER STATION
BNSF TRACK
C RELOCATEDL
LC NWES NB/SB TRACK
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
05/29/14
08/08/14
08/08/14
Pending
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
JAB 08/08/14
BASE IS LEVEL WITH TOP OF RAMP AT EACH LOCATION. REFERENCE POLE DETAILS SHEET ES-383.
8. CONCRETE BASES FOR POLES ALONG RAMP TO EXTEND TALLER THAN STANDARD BASES SO THAT TOP OF
RE: ES-340.
#CKMDV SERIES OR EQUAL). SURFACE MOUNT RECEPTACLE IN CRAWLSPACE NEAR ACCESS DOOR LOCATIONS.
7. PROVIDE WEATHER PROOF GFI RECEPTACLE WITH ALUMINUM "IN-USE" COVER (THOMAS & BETTS, "REDDOT",
REFERENCE ES-390 FOR LIGHT FIXTURE SCHEDULE.
6. FOR PLATFORM LIGHT POLES REFERENCE STRUCTURAL DRAWINGS FOR CONCRETE BASE FOUNDATIONS.
FOR LOCATIONS PRIOR TO ROUGH-IN.
5. PROVIDE 277V CONNECTION TO PLATFORM SIGNAGE CABINET. REFERENCE FINAL SIGNAGE PACKAGE
REFERENCE ARCHITECTURAL PLANS, CCTV SYSTEM PLANS & PASSENGER INFORMATION PLANS.
PLANS. LABEL THESE CONDUITS "SECURITY CONDUITS". FOR CAMERA & SPEAKER LOCATIONS
4. PLATFORM LIGHT POLES WITH CAMERAS OR SPEAKERS. PROVIDE CONDUIT PER THE CONDUIT ROUTING
CABINET. USE (2-#8, 1-#8 GND) 3/4"C.
#CKMSV SERIES OR EQUAL). RECEPTACLE MOUNTED INTEGRAL TO THE PLATFORM SIGNAGE
3. PROVIDE 30A, 208V RECEPTACLE WITH ALUMINUM "IN-USE" COVER (THOMAS & BETTS, "REDDOT",
OR EQUAL).
USE (2-#8, 1-#8 GND) 3/4"C. PROVIDE "IN-USE" COVER (THOMAS & BETTS, "REDDOT", #CKMDV SERIES
2. PROVIDE DUPLEX GFI RECEPTACLE MOUNTED INTEGRAL TO THE PLATFORM SIGNAGE CABINET.
COORDINATE FINAL LOCATIONS OF ALL FARE COLLECTION EQUIPMENT PRIOR TO ROUGH-IN.
1. TVM/SAV EQUIPMENT LOCATED AT TICKET KIOSK. RE: SHEET ES-361 AND DETAIL 3/ES-380. FIELD
NOT ALL KEY SYMBOLS APPEAR ON EVERY SHEET.
GENERAL: THESE DRAWING NOTES APPLY TO ALL PLANS ES-330 TO ES-332.
ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
30.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
307+47 307+47
307+46.9
4P
OB
8
PER NOTE 4.
(2-#10, 1-#10 GND) 1" C AND SPARE CONDUITS
TYPICAL TO ALL LIGHT POLES THIS CIRCUIT
(2-#10, 1-#10 GND)1"C.
HL-5
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL PL
PL
PL
(2-#10, 1-#10 GND)1"C.
HL-21
PL
PL
PLPER NOTE 4.
(2-#10, 1-#10 GND) 1" C AND SPARE CONDUITS
TYPICAL TO ALL LIGHT POLES THIS CIRCUIT
4
8
8
8
4
305+00
295+00
8 16 240
SCALE IN FEET
B
C
NORTHWEST RAIL ELECTRIFIED SEGMENT
MA
TC
HLIN
E S
EE E
S-3
30
ES-331
DRAWING NOTES:
MA
TC
HLIN
E S
EE E
S-3
32
JCC
JCC
JAB
PLATFORM & TRANSITION PLAZA ELECTRICAL PLANS ES-330 TO ES-332.
REFERENCE SHEET ES-330 FOR ALL DRAWING NOTES. APPLIES TO
ELECTRICAL PLAN
TRANSITION PLAZA/PLATFORM
RE: ES-350
UNDERPASS
A
KSP
JEK
WESTMINSTER STATION
BNSF TRACK
C RELOCATEDL
LC EC NB/SB TRACK
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
05/29/14
08/08/14
08/08/14
STAIRS RE: ES-350
STORAGE ROOM UNDER
ABOVE
CANOPY STRUCTURE
Pending
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
JAB 08/08/14
UNDER STAIRS RE: ES-350, ES-352
ELEVATOR MACHINE ROOM
STAIRS RE: ES-350, ES-352
ELECTRICAL ROOM UNDER
ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
31.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
2
30A,208V
WP, GFI3
1
LA-1,3
LA-7(PART)
6 (TYP.)
2
WP, GFIHL-2(PART) J
5
7
WP, GFI
LA-2(PART)
IN CRAWLSPACE
RECEPTACLE LOCATED
6
(TYP.)
1
PL
PL
PL
PL
PL
PLPL
PL4 PL4 PL4 PL4
PL PL
EW
EWSEWSEWS
6
(TYP.)
(2-#10, 1-#10 GND)1"C.
HL-7
(2-#10, 1-#10 GND)1"C.
HL-23
STRUCTURE ABOVE.
MOUNTED TO CANOPY
ES-333 FOR FIXTURES
REFERENCE SHEET
PL4
EWS
EW EWS EWS
PL4
PL
JB
ADDITIONAL INFORMATION.
CONDUIT ROUTING PLANS FOR
TYPICAL, PULL BOX, REFERENCE
JB JB
SPARE CONDUITS PER NOTE 4.
CIRCUIT (2-#10, 1-#10 GND) 1" C AND
TYPICAL TO ALL LIGHT POLES THIS
SPARE CONDUITS PER NOTE 7.
CIRCUIT (2-#10, 1-#10 GND) 1" C AND
TYPICAL TO ALL LIGHT POLES THIS
ELA-14(PART)
8
4
4
EWS EWS
LA-7(PART)
8 16 240
SCALE IN FEET
B
C
NORTHWEST RAIL ELECTRIFIED SEGMENT
MA
TC
HLIN
E S
EE E
S-3
31
ES-332
JCC
JCC
JAB
ELECTRICAL PLAN
DRAWING NOTES:
PLATFORM & TRANSITION PLAZA ELECTRICAL PLANS ES-330 TO ES-332.
REFERENCE SHEET ES-330 FOR ALL DRAWING NOTES. APPLIES TO
TRANSITION PLAZA/PLATFORMA
KSP
JEK
WESTMINSTER STATION
BNSF TRACK
C RELOCATEDL
LC NWES NB/SB TRACK
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
05/29/14
08/08/14
08/08/14
RE: ES-360
TYPICAL SHELTER
Pending
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
JAB 08/08/14ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
32.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
2
LA-7(PART)
LA-11
WP, GFI
HB-1
WP, GFI
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL PL PL
PL
PL
PL
JB
PL
ADDITIONAL INFORMATION.
CONDUIT ROUTING PLANS FOR
TYPICAL, PULL BOX, REFERENCE
8 8 8 8
B
C
NORTHWEST RAIL ELECTRIFIED SEGMENT
ES-333
JCC
JCC
JABA
KSP
JEK
WESTMINSTER STATION
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
05/29/14
08/08/14
08/08/14
CANOPY ELECTRICAL PLAN
4 8 120
SCALE IN FEET
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
Pending
JAB 08/08/14ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
GENERAL NOTES:
BID ALTERNATE NOTES:
ONLY THE "EFW, EFW2, EFWN" WHITE LED FIXTURES ON THE CANOPY.
ASSOCIATED CONTROLLERS, CONDUIT AND WIRE FROM THE SCOPE. LEAVING
1. PROVIDE ALTERNATE PRICE TO REMOVE THE TYPE "EFC" FIXTURES AND
INFORMATION.
11. REFERENCE FIXTURE SCHEDULE SHEET ES-390 FOR ADDITIONAL
INCLUDE WIRING DIAGRAMS SPECIFIC TO THIS DESIGN.
10. PROVIDE MANUFACTURER SHOP DRAWINGS FOR ENTIRE LED LIGHTING SYSTEM.
LOWER LEVEL ENLARGED MACHINE ROOM PLAN ES-352 FOR LOCATION.
OTHER COMPONENTS. LOCATE IN ELECTRICAL ROOM BELOW STAIRS. REFERENCE
9. PROVIDE ENCLOSURE TO HOUSE DMX CONTROLLER AND SPLITTERS AND ANY
INTEGRAL CLOCK, INFRA-RED RECEIVER FOR REMOTE CONTROL.
DISPLAY SCREEN, SD CARD FOR MEMORY, RS232 SERIAL PORT, OUTPUT RELAY,
ETHERNET PORT, (8) CONTACT CLOSURE INPUTS, USER INTERFACE KEYPAD AND
BUT NOT LIMITED TO POWER SUPPLIES, SOFTWARE, (2)DMX OUTPUTS, USB PORT,
8. LED CONTROLLER SYSTEM TO INCLUDE ALL NECESSARY COMPONENTS, INCLUDING
SOFTWARE, AND TRAINING FOR FACILITY PERSONNEL TO OPERATE SYSTEM.
PROGRAMMING KIT, ADDITIONAL DMX SPLITTERS AS REQUIRED, MANUFACTURER
BUT NOT LIMITED TO POWER/DATA JUMPER CABLES, DMX SPLITTER/LED
BELOW STAIRS, RE:ES-352. PROVIDE COMPLETE OPERATING SYSTEM INCLUDING
CONTROLLED TOGETHER. DMX CONTROLLER LOCATED IN ELECTRICAL ROOM
7. ALL "EFC" RGB COLOR LED FIXTURES TO BE CONNECTED TO SAME CIRCUIT AND
AND CONTROLLED TOGETHER.
6. ALL "EFW, EFW2, EFWN" WHITE LED FIXTURES CONNECTED TO SAME CIRCUIT
5. ALL EXPOSED CONDUIT AND J-BOXES TO BE PAINTED TO MATCH CANOPY.
TO REDUCE J-BOX AND CONDUIT QUANTITIES.
LIGHTING MANUFACTURER'S POWER/DATA JUMPER CABLES FROM FIXTURE TO
4. J-BOXES SURFACE MOUNTED AT PURLINS, NOT ALL SHOWN FOR CLARITY. USE
NEXT PURLIN. REFERENCE CANOPY ARCHTECTURAL AND STRUCTURAL PLANS.
OPENINGS IN PURLINS WILL BE PROVIDED FOR CONDUIT PASS THROUGH TO
TO PURLINS. PROVIDE CONDUIT FROM J-BOX TO J-BOX AT PURLIN TO PURLIN.
FIRST PURLIN. CONDUIT AND J-BOXES TO BE SURFACE MOUNTED ON EXTERIOR
GIRDER BASE ROUTED INSIDE GIRDER TO J-BOX AT EXTERIOR OF CANOPY AT
3. USE MC CABLE FOR POWER FEED AND DMX CABLE FOR CONTROL FEED FROM
REFERENCE CONDUIT ROUTING PLANS FOR ADDITIONAL INFORMATION.
2. POWER AND DMX CONTROL FEED TO ROUTE IN CONDUIT TO MAIN GIRDER BASE.
ARE TO BE AIMED DOWNWARD AT PLATFORM.
WITH MARLA STAUTH AT FRANKLY LIGHTING. ALL OTHER WHITE LED FIXTURE
1. TYPE "EFC" FIXTURES ARE TO BE AIMED UPWARD AT CANOPY, COORDINATE AIMING
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
33.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/8/2
014
COORDINATE AIMING WITH FRANKLY LIGHTING.
ARE TO BE MOUNTED AIMING DOWNWARD.
AIMED UPWARD AT GLASS PANELS. ALL OTHERS
MOUNTING DETAILS. EFC FIXTURES ARE TO BE
REFERENCE ARCHITECTURAL PLANS FOR
FIXTURE MOUNTED TO SIDE OF OUTRIGGER.
EFW, EFWN, EFW2 & EFC (TYP.)
USE (2-#10, 1-#10GND).
ALL "EFW , EFW2, EFWN" FIXTURES CONNECTED TO HL-19.
ALL "EFC" FIXTURES CONNECTED TO HL-17.
CANOPY LIGHTING HOME RUNS:
J J J J J J J
RE: CONDUIT ROUTING PLANS.
GIRDER FROM J-BOX AT CANOPY.
POWER/DATA TO BE ROUTE INSIDE
LIGHTS, DMX CONTROL AND CAMERA
TYPICAL, HOMERUN FOR POWER TO
(1)1" (COMM) FOR CAMERAS.
(1)1" (DATA) FOR DMX CONTROL,
(1)1" (POWER) FOR LIGHTING.
TYPICAL
CLARITY. REFER TO GENERAL NOTES
TO PURLIN. NOT ALL SHOWN FOR
TYPICAL, SURFACE MOUNT J-BOXES
FIRST PURLIN.
(1)1" (COMM) TO J-BOX AT
CAMERA TYPICAL,
J JJJJJJJ J
CLARITY.
TO FIXTURE. NOT ALL SHOWN FOR
CABLE CONNECTION FROM FIXTURE
TYPICAL, POWER /DATA JUMPER
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFWN
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC EFC EFC EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFCEFCEFCEFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFC
EFWN
EFW2
EFWN
EFW2
EFWNEFW2 EFW2
EFW2
EFW2
EFW2
EFW2
EFW
EFW
EFW
EFW2
EFW2
EFW2
EFW2
EFW
EFW
EFW
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
40.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
1 2
3
4
1
NORTHWEST RAIL ELECTRIFIED SEGMENT
ES-340PLATFORM CROSS SECTIONJAB
4 8 120
SCALE IN FEET
JCC
JCC KSP
JEK
C
DRAWING NOTES:
A
B
WESTMINSTER STATION
PER PLANS.
4. WEATHER PROOF GFI RECEPTACLE WITH ALUMINUM "IN-USE" COVER AT +18" A.F.G. LOCATIONS
STRUCTURAL PLANS.
3. ACCESS COVERS IN PLATFORM SLAB. RE: DETAIL 1/ES-181. REFERENCE ARCHITECTURAL AND
SLAB TENDONS.
PANELS WITHOUT COORDINATION AND APPROVAL WITH STRUCTURAL ENGINEER, SO NOT TO HIT
FASTENERS ARE NOT TO PROJECT MORE THAN 1" INTO PRECAST PANEL. NO DRILLING OF PRECAST
2. COORDINATE ALL MOUNTING OF CONDUITS, DEVICES, J-BOXES, LIGHTS UNDER STATION PLATFORM.
1. POWER AND COMMUNICATIONS PULLBOX. REFERENCE DETAIL 1/ES-181.
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
05/29/14
08/08/14
08/08/14
Pending
JAB 07/10/14ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B
JAB 08/08/14ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
B
C
1
NORTHWEST RAIL ELECTRIFIED SEGMENT
ES-350
8 16 240
SCALE IN FEET
STORAGE ROOM
JCC
JCC
DRAWING NOTES:
JABA
NTS
KSP
JEK
WESTMINSTER STATION
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
05/29/14
LOWER LEVEL AND UNDERPASS ELECTRICAL PLAN
LOWER LEVEL AND UNDERPASS ELECTRICAL PLAN
08/08/14
08/08/14
MACHINE ROOM.
ELEVATOR
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
Pending
1/ES-380.
4. POWER AND COMMUNICATIONS PULLBOX. REFERENCE DETAIL
AND CCTV SYSTEM PLANS FOR EXACT QUANTITIES & LOCATIONS.
NEAREST COMM PULLBOX. REFERENCE ARCHITECTURAL PLANS
3. CAMERAS: PROVIDE J-BOX AND CONDUIT FROM CAMERA TO
SYSTEMS PLANS FOR SYSTEMS DESIGN.
CONTROL, AND INTRUSION DETECTORS. REFERENCE COMM
SYSTEM INTERFACE WITH FIRE AND SMOKE DETECTION, ACCESS
2. PROVIDE 2" CONDUIT TO NEAREST COMM PULLBOX FOR SCADA
FOR CONDUIT REQUIREMENTS TO PHONES.
PHONES & EMERGENCY PHONES, REFERENCE DETAIL 3/ES-380
COMMUNICATIONS SYSTEMS PLANS FOR LOCATIONS OF PUBLIC
1. REFERENCE ARCHITECTURAL SIGNAGE PLANS AND
ROOM
ELECTRICAL
JAB 08/08/14ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
50.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
305+00
LA-39,41J
E
EUH-2
2
3
3
3
1
3
E 1
3
3
JB4
ES-321.
PLATFORM LEVEL. RE:
TO PULLBOX ABOVE AT
(1)1"(COMM)
(1)1"(POWER)
E
1
4 (1)1"(COMM)
(1)1"(POWER)
(1)1"(COMM)
(1)1"(POWER)
(1)1"(COMM)
(1)1"(POWER)
(1)1"(COMM)
(1)1"(POWER)
(1)1"(COMM)
(1)1"(POWER)J
SP-1
LA-10,12
SUMP PIT
LA-14(PART)
(1)1"(COMM)
(1)1"(POWER)
ROOM EQUIPMENT.
AND ELEVATOR MACHINE
RE: ES-352 FOR ELECTRICAL
B
C
1
NORTHWEST RAIL ELECTRIFIED SEGMENT
ES-351
8 16 240
SCALE IN FEET
JCC
JCC
DRAWING NOTES:
JABA
NTS
KSP
JEK
WESTMINSTER STATION
ISSUED FOR OSR #1, CDRL #7B-09.06B, REV A
05/29/14
LOWER LEVEL AND UNDERPASS LIGHTING PLAN
LOWER LEVEL AND UNDERPASS LIGHTING PLAN
08/08/14
08/08/14
ISSUED FOR OSR #2, CDRL #7B-09.06B, REV B JAB 07/10/14
Pending
JAB 08/08/14
6. CONNECT 90 MINUTE BATTERY AHEAD OF LOCAL SWITCHLEG.
IN UNDERPASS. TYPICAL 4 CORNERS OF UNDERPASS.
UP TO GRADE LEVEL. CAP CONDUIT FOR FUTURE USE. NO EXPOSED CONDUIT
1-1/2" RIGID CONDUIT STUBBED TO 1'-0" OUTSIDE UNDERPASS WALL AND
AT 6'-8" A.F.F. FOR FUTURE UNDERPASS ARTWORK LIGHTING. PROVIDE
5. PROVIDE 6"X6" J-BOX RECESSED FLUSH IN CONCRETE UNDERPASS WALL
FIXTURES.
FROM INVERTER TO UL 924 RELAY. OUTPUT OF UL 924 RELAY TO LIGHT
FROM BREAKER TO PRIMARY INPUT OF INVERTER. CONNECT OUTPUT
CONTROL PANEL TO UL 924 RELAY. CONNECT UNSWITCHED HOT LEG
CONNECT SWITCHED HOT LEG FROM MOTORIZED BREAKER IN LIGHTING
ROOM. PROVIDE UL 924 RELAY ON SECONDARY SIDE OF LIGHTING INVERTER.
EMERGENCY LIGHTING INVERTER AND UL 924 RELAY LOCATED IN ELECTRICAL
4. CIRCUIT FOR FIXTURES IN UNDERPASS TO BE CONNECTED VIA
WITH ARCHITECTURAL, STRUCTURAL AND CONSPAN BRIDGE SYSTEMS.
CONDUIT IN UNDERPASS. COORDINATE EXACT PLACEMENT OF J-BOXES
OUTSIDE THE UNDERPASS STRUCTURE FOR HOMERUN. NO EXPOSED
UNDERPASS. PROVIDE 1" CONDUIT FROM LIGHT TO LIGHT ROUTED
PROVIDE DOUBLE GANG 4"X4" J-BOX RECESSED FLUSH IN CONCRETE
3. FIXTURE SURFACE MOUNTED TO UNDERSIDE OF UNDERPASS CEILING.
2. HANG FIXTURE AT 10'-0" A.F.F.
WATT STOPPER PW-100 OR EQUAL.
1. PROVIDE PASSIVE INFRARED OCCUPANCY SENSOR, WALL BOX STYLE,
ISSUED FOR CONST REVIEW, CDRL #7B-09.06B , REV C
NUMBER:
REFERENCE
SHEET
REVISIONS
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DESIGNED BY:
DRAWN BY:
US
ER:
JCarn
ey
c:\p
ww
orkin
g\rtd
_eagle
_p3\jcarn
ey\d
ms51302\7
B-0
9.0
6B_
NW
ES-E-E
S-3
51.d
gn
PARTNERS
TRANSIT
DENVER
eagle P3
DATE:
DATE:
NO. BY DATE
GLOBAL DESIGN CONSULTANTS
8/7/2
014
5
ETRETR
ETR ETR
ETR
ETR
ED ED ED ED
(2-#12, 1-#12GND) 1"C.
HL-13
4
(2-#10, 1-#10GND) 1"C.
HL-9,11
CIRCUIT. (2-#10, 1-#10GND)
TYPICAL ALL LIGHTS THIS
OS
A1E
A1 A1 A1E
(TYP) 21
(TYP) 3
J J
5 5
J J
OS
A1
A1A1A1
(TYP)2
1
ED
OF PLATFORM
MOUNTED TO UNDERSIDE
TYPICAL ALL "ED" FIXTURES
ED ED ED
6
6
(2-#12, 1-#12 GND)1"C.
HL-15
5