Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

29
Northgate 75KWh Solar Delivery Day: 12/18/2008

Transcript of Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Page 1: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Northgate 75KWh Solar

Delivery Day: 12/18/2008

Page 2: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Boom Lift Materials to Roof

Page 3: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Material Layout

Page 4: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Roll of Solar Cell Material

Page 5: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Tools of the Trade

Page 6: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Material Layout

Page 7: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Material Layout

Page 8: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Material Adhesion

Page 9: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Solar Electric Junction Boxes

Page 10: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Northgate 75KWh Solar

December 29, 2008

Page 11: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Preparing the Inverter Foundation

Page 12: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Inverter Foundation

Page 13: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Available Hook Up

Page 14: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Junction Boxes Mounted

Page 15: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Junction Box Up Close

Page 16: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Placing the Inverter

Page 17: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Inside the Inverter

Page 18: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Inside the Inverter

Page 19: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Northgate 75KWh Solar

January 9, 2009

Page 20: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Inverter Complete

Page 21: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Northgate 75KWh Solar

January 22, 2009

Page 22: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Most of the Cells are Wired

Page 23: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

One of Several Fuse Boxes

Page 24: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Looking across the Cells

Page 25: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Northgate 75KWh Solar

February 1, 2009

Page 26: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Aerial View

Page 27: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Aerial View

Page 28: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Power Production Cycle

Solar Cells

PG&E

Inverter

Northgate

Page 29: Northgate 75KWh Solar Delivery Day: 12/18/2008. Boom Lift Materials to Roof.

Quick Defenitions

Inverter – Converts DC current into 110v AC KWh – Killowatt hour = 1000 watts for 1 hour Thin Film Solar – new flexible technology Grid – common term for the electric company Base Load – Minimum idle power (power used

when no one is home) At 11:00am on April 2, the meter was activated