Marc Laroche Manager, Product Evaluation marc.laroche@entrust (613) 247-3446
Non-point Source Update Marc T. Aveni Regional Manager.
-
Upload
jennifer-brown -
Category
Documents
-
view
213 -
download
1
Transcript of Non-point Source Update Marc T. Aveni Regional Manager.
![Page 1: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/1.jpg)
Non-point Source UpdateNon-point Source Update
Marc T. AveniMarc T. Aveni
Regional ManagerRegional Manager
![Page 2: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/2.jpg)
OverviewOverview
• Provide update on Non-point Source Pollution issues
• Allow time for questions
![Page 3: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/3.jpg)
Non Point Source IssuesNon Point Source Issues
• Tributary Strategies• Agricultural Cost-Share• Urban Issues/Implementation• WQIA Funding• TMDLs• Bay Model Phase V• Potomac Roundtable• Watershed Management Planning
![Page 4: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/4.jpg)
Tributary StrategiesTributary Strategies
• Potomac Basin Strategy complete• Locality/SWCD specific “input decks” being
shared • “Short term implementation targets”• Use existing framework• What is priority for your locality?• Where does this match with state effort?• Begin to show progress/implementation
![Page 5: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/5.jpg)
Agricultural Cost ShareAgricultural Cost Share• $10 M each for FY06/07• Managed by SWCDs• Change from the past• 3 “high priority BMPs”
– cover crops– continuous no-till– nutrient management planning/
implementation
![Page 6: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/6.jpg)
Cooperative NPS ApproachCooperative NPS Approach
• ~ 3 M statewide• Non-agricultural local government
projects part of “input deck”• Competitive/matching funds• Mandated & voluntary activities OK• Pre-proposal process to limit time• Multiple year projects through 2010
![Page 7: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/7.jpg)
Other Water Quality Other Water Quality Improvement Act FundingImprovement Act Funding
• $750,000 – agricultural water quality initiatives (animal diet&feed/manure transport)
• $750,000 – non agricultural water quality initiatives (education and outreach/horse?)
![Page 8: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/8.jpg)
Urban Issues/ImplementationUrban Issues/Implementation
• BMP Tracking• Stormwater Program• MS4• General Construction Permit• E and S Program
![Page 9: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/9.jpg)
BMP TrackingBMP Tracking
• Committee formed• Memo to MS4 Permit Holders• Historical data• Electronic database for future
submissions in consistent manner statewide
![Page 10: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/10.jpg)
Stormwater ProgramStormwater Program• January 2005 – legislation effective• July 2006 Bay Preservation Act
localities and MS4 I/II shall adopt• Other localities opt in or DCR
administers• Must define acceptable program/fees –
part of APA process – takes time
![Page 11: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/11.jpg)
![Page 12: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/12.jpg)
![Page 13: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/13.jpg)
Municipal Separate Storm Municipal Separate Storm Sewer SystemSewer System
• Conveyance for stormwater– streets, curbs, gutters, ditches,
channels, stormdrains . . .• Goal – reduce pollution entering
“waters” maximum extent possible• Regulations vague on purpose
![Page 14: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/14.jpg)
Municipal Separate Storm Municipal Separate Storm Sewer SystemSewer System
• Medium (100,000 >) and large (250,000 >)• Regulated Small (urbanized area defined by
census)• Phase I - 11 large localities - 5 year permit• Phase II - 99 to date localities and others• DCR reviewing reports submitted against
original application - standardize reporting statewide
![Page 15: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/15.jpg)
General Construction PermitGeneral Construction Permit• Part of VA Stormwater Management
Program (VSMP)• Covers construction activity stormwater
discharges• Fee based on size of land clearing > 5 acres,
between 1-5 acres• Must include SWPPP• DCR meeting with localities
![Page 16: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/16.jpg)
Erosion and Sediment Control Erosion and Sediment Control
• VA Soil and Water Board establishes minimum standards of program effectiveness
• Trains/certifies/provides oversight to local programs
• Goal to review all local programs every 5 years
• Complaints handled locally first
![Page 17: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/17.jpg)
TMDLsTMDLs• DEQ lead for TMDL development/public
participation• DCR/DEQ develop implementation plan• Implementation lags behind development• DCR will focus on “implementing” select
implementation plans using USEPA 319 funds
![Page 18: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/18.jpg)
Phase 5 Watershed ModelPhase 5 Watershed Model
• Expand to all of VA - currently VA Bay only
• Better predict effects of BMPs on receiving waters
• Assumptions changing• Greater ability to get locality specific
and accurate information
![Page 19: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/19.jpg)
Potomac Watershed Potomac Watershed RoundtableRoundtable
• Fall 2000 initiative by SWCD/DCR
• Quarterly meetings
• Shares and collaborates on water quality responses and solutions
• Website, 4 Forums
![Page 20: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/20.jpg)
Watershed Management Watershed Management PlanningPlanning
• 2002 – VA established 8 plan components
• Tools developed – (guide/video/training sessions)
• Many NOVA localities have done• C2K commitment• Often serves as umbrella
![Page 21: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/21.jpg)
TMDLs Tributary Strategies
Bay Preservation Act
Phase I/II StormwaterErosion and Sediment
General Permit
![Page 22: Non-point Source Update Marc T. Aveni Regional Manager.](https://reader035.fdocuments.us/reader035/viewer/2022070410/56649f0e5503460f94c2331c/html5/thumbnails/22.jpg)
Questions and Reactions?Questions and Reactions?