NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV...

18
ASSAM POWER DISTRIBUTIOM CO. LTD PROJECT PLANNING & DESIGN NIT NO.CGM (PP&D)/ APDCL/TDF-2011-14/69/TENDER/09(A) & 09(B)(ii) dated 30.07.12 CORRIGENDUM This is for information for all the intending bidder that the following amendment has been made in connection to the bellow mentioned tenders:- 1. NIT NO.CGM (PP&D)/ APDCL/TDF-2011-14/69/TENDER/9A 2. NIT NO.CGM (PP&D)/ APDCL/TDF-2011-14/69/TENDER/9B Sl No Related to Tender No. Section No. Clause no. Original one Amended one 1 09(A) & 09(B) 1 Note No. 9 The Company reserves the right to accept or reject any tender in part or in full or spilt the work of any package without showing any reason thereof. “The company reserved the right to accept or reject any tender in part or in full or split the work or award the contract in phase manner or cancel/withdraw the Notice inviting tender of any package without assigning any reason thereof whatsoever . In such cases, no bidder shall have any claim arising out of such action” 2 09B 2 2 To be added with previous one xi.“ GIS mapping of all the line completed either new & R&M” 3 09A 2 4.A. b. The bidder must have the experience of constructing minimum of 2 (one) no of 33 /11 KV S/s during last 3(three) years as on the date of bid opening out of which one must be 2X 5 MVA S/S and must be in satisfactory operation for at least 1 (one) year. The bidder must have the experience of constructing minimum of 2 (two) no of 33 /11 KV S/s during last 3(three) years as on the date of bid opening and must be in satisfactory operation for at least 1 (one) year. In case of joint venture experience of all the partners shall be added together. 4 09(A) & 09(B) 2 4.B. a To be added with previous one (** Note:- If any bidder for certain valid reason did not undertake sufficient work in previous three years , then APDCL, if satisfied with the reasons, may take into account the financial turn over & experience of best of three years out of previous five consecutive years ) Income tax return and audited balance sheet for the financial year 2011-12 may be provisional. However, a certificate from chartered Account regarding turn over for the year 2011-12 must be submitted. 5 09(A) & 09(B) 2 14. a “An interest chargeable mobilization advance : An interest free mobilization advance”

Transcript of NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV...

Page 1: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

ASSAM POWER DISTRIBUTIOM CO. LTD PROJECT PLANNING & DESIGN

NIT NO.CGM (PP&D)/ APDCL/TDF-2011-14/69/TENDER/09(A) & 09(B)(ii) dated 30.07.12

CORRIGENDUM

This is for information for all the intending bidder that the following amendment has been made in connection to the bellow mentioned tenders:-

1. NIT NO.CGM (PP&D)/ APDCL/TDF-2011-14/69/TENDER/9A

2. NIT NO.CGM (PP&D)/ APDCL/TDF-2011-14/69/TENDER/9B

Sl

No Related to

Tender No.

Section

No.

Clause

no. Original one Amended one

1

09(A) &

09(B)

1 Note

No. 9

The Company reserves the right to accept or reject any

tender in part or in full or spilt the work of any package

without showing any reason thereof.

“The company reserved the right to accept or reject any tender

in part or in full or split the work or award the contract in phase

manner or cancel/withdraw the Notice inviting tender of any

package without assigning any reason thereof whatsoever . In

such cases, no bidder shall have any claim arising out of such

action”

2 09B 2 2 To be added with previous one xi.“ GIS mapping of all the line completed either new & R&M”

3 09A 2 4.A. b.

The bidder must have the experience of constructing

minimum of 2 (one) no of 33 /11 KV S/s during last

3(three) years as on the date of bid opening out of which

one must be 2X 5 MVA S/S and must be in satisfactory

operation for at least 1 (one) year.

The bidder must have the experience of constructing minimum

of 2 (two) no of 33 /11 KV S/s during last 3(three) years as on

the date of bid opening and must be in satisfactory operation for

at least 1 (one) year. In case of joint venture experience of all

the partners shall be added together.

4 09(A) &

09(B) 2 4.B. a To be added with previous one

(** Note:- If any bidder for certain valid reason did not

undertake sufficient work in previous three years , then APDCL,

if satisfied with the reasons, may take into account the financial

turn over & experience of best of three years out of previous

five consecutive years ) Income tax return and audited balance

sheet for the financial year 2011-12 may be provisional.

However, a certificate from chartered Account regarding turn

over for the year 2011-12 must be submitted.

5 09(A) &

09(B) 2 14. a “An interest chargeable mobilization advance : An interest free mobilization advance”

Page 2: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

6 09 (A)

&(B) 2 14. c

All payment shall be made from the office of the CGM

(PP&D), APDCL. The bills are to be routed through the

concerned CGM (D) after due verification by the concerned

SDE, passed by the concerned Asstt. General Manager and

countersigned by the concerned DGM. Progress report

against the work must be enclosed with each bill (format for

progress report to be submitted will be supplied along with

the work order).

All Bank Guarantees (BG) submitted along with the bid or

to be submitted later as per clause 2 and 3(a) of above

should be from any branch of nationalized or scheduled

Bank of RBI located in Assam.

“All payment shall be made from the office of the CGM

(PP&D), APDCL. The bills after due verification by the

concerned SDE, passed by the concerned Asstt. General

Manager and countersigned by the concerned DGM will be

placed to CGM (PP&D) for payment. Progress report against the

work must be enclosed with each bill (format for progress report

to be submitted will be supplied along with the work order). In

case of final bill GIS mapping ( in case of lines) in each case

should be submitted.

All Bank Guarantees (BG) submitted along with the bid or to be

submitted later as per clause (5) and (6) of above should be

from those branches of nationalized or scheduled Bank of RBI

having their regional offices in Assam or at least a branch office

at Guwahati ( In case of those, whose regional office is not

located in the state of Assam) with a certificate from the Bank to

the effect that the verification or any confirmation in regard to

the BG issued by the bank can be taken up with the Branch office

at Guwahati”.”

7 09(A) 2 16. b

However equipments like Circuit breaker, Control & Relay

Panel , Auto-Recloser,(both 33KV & 11 KV), 33/11KV

Power transformer &11/0.4 KV Distribution transformer

shall be guaranteed for satisfactory performance for a

period of five years ( 60 months ) from date of

commissioning .

However equipments 11/0.4 KV Distribution transformer &

energy meter shall be guaranteed for satisfactory performance

for a period of five years ( 60 months ) from date of

commissioning . For rest of the equipments period will be

18(eighteen) months.

8 09 (A)

&(B) 5 Format for Power of attorney Is in order

09 (A)

&(B) Technical papers

If a vendor offer his bid for more than one package against

specific NIT , is allowed to submit one set of techno – Com

paper . However BG and Price bid for each package should be

separately submitted in sealed envelope subscribing package No

clearly on the body of the envelop along with the bid.

09 (A)

&(B) Validity of BG in case of EMD Should be for seven month from the date of submission

9(A) Approved manufactures list The followings are to be added as approved manufacturer in

addition to the earlier one.

Page 3: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

a. For Power & control cable : i) ICC ii) RPG

b. 11 KV & 33 KV outdoor CTPT: other reputed

manufacturer having test certificates from CPRI for

each rating.

c. Isolator : Switch Gear & Structural India Pvt. Ltd.

d. Polymeric Insulator : Compaq international

06 3 BOQ Clarification & corrections for detail of BOQ in price bid For all packages separate sheets are as follows

CORRECTED BOQ FOR DIFFERENT PACKGES (shaded portions are corrected one)

NIT NO.CGM (PP&D)/ APDCL/TDF-2011-14/69/TENDER/69/09(A)Dated 21.06.12

CORRECTION FOR ANNEXURE-III

FOR PACKAGE No TDF/11-14/SS/GGMR

Sl.

No as per original BOQ Name of the Item Unit QTY

1 2 3 4

80 Supply, erection, testing and commissioning of cable 11 KV 3 core 240sqmm Mtr 500

84 Supply & Installation of shielding on S/S with 7/14 SWG GI weir kg 240

Page 4: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

CORRECTED DETAILS OF BOQ FOR PACKAGE NO TDF/11-14/SS/BK ANNEXURE-IV

Sl

N

o

Name of the Item Unit

NAME OF THE DIFFERENT SITE AND BOQ ACCORDINGLY

Total

BOQ

NEW SUB STATION R&M

Sa

nth

aib

ari

Pa

cha

lab

ari

Deo

sri

Sa

fun

gu

ri

Ch

ap

atg

ram

So

iba

ri

Bis

mu

ri

Sa

lko

cha

Ben

gta

l

Ma

nca

cha

r

Bh

alu

kd

ub

i

Ab

hy

ap

uri

Bir

jha

ra

Fa

kir

ag

ram

Ch

ap

ar

1

Construction of transformer pad for 10 Mva 33/11

KV including supply of all foundation materials &

Labour

Nos 0 0 0 0 0 0 0 0 1 1 0 1 2 1 1 4

2

Construction of transformer pad for 5 Mva 33/11

KV including supply of all foundation materials &

Labour

Nos. 2 2 2 2 2 2 2 2 2 2 0 1 0 1 1 23

3 33 LA with surge monitor & GI mounting structure

as per specification st 4 3 3 3 3 3 3 3 3 3 3 1 3 0 0 38

4

Construction of CC foundation for 33 KV LA

including supply of all foundation materials &

Labour (one set Comprise of 3 Nos. LA)

Nos. 4 3 3 3 3 3 3 3 3 3 3 1 3 0 0 38

5 33 KV 800Amp Isolator with earth Switch & GI

Structure as per specification St 2 1 1 1 1 1 1 1 1 1 1 1 1 0 14

6 33 KV 800 Amp Isolator without earth Switch &GI

Structure as per specification St 7 6 6 6 6 6 6 6 6 6 6 2 2 1 1 73

7

Construction of CC foundation for 33 KV isolator

including supply of all foundation materials &

Labour

Nos. 9 7 7 7 7 7 7 7 7 7 7 3 3 1 1 87

8

33KV Autorecloser type VCB remote operable as

well as locally operable with In-build Modem &

mounting GI Structure as per specification

Nos. 4 3 3 3 3 3 3 3 3 0 0 0 0 0 0 28

9

11KV Autorecloser type VCB remote operable as

well as locally operable with In-build Modem &

mounting GI Structure as per specification

Nos. 6 6 6 6 6 6 6 6 6 0 0 0 0 0 0 54

10

Construction of CC foundation for auto recloser

/remote type VCB ( both 33 & 11KV) including

supply of all foundation materials & Labour

Nos. 10 9 9 9 9 9 9 9 9 0 0 0 0 0 0 82

11 11 KV Isolator 800 Amp with GI Structure as per

specification St 4 4 4 4 4 4 4 4 4 4 4 0 4 0 0 48

12 11 KV Isolator 600 Amp GI Structure as per

specification St 9 9 9 9 9 9 9 9 9 9 11 0 6 0 0 107

Page 5: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

13

Construction of CC foundation for 11 KV isolator

including supply of all foundation materials &

Labour

Nos 13 13 13 13 13 13 13 13 13 13 15 0 10 0 0 155

14 Aluminium Bars for connecting the 11 KV side

50mm X 6mm thickness 3 mtrs long Psc 6 6 6 6 6 6 6 6 6 6 6 0 6 0 0 72

15 11 KV 9KA station type LA Set 3 3 3 3 3 3 3 3 3 3 2 0 2 0 0 34

16

Construction of CC foundation for 11 KV LA

including supply of all foundation materials &

Labour ( one set Comprise of 3 Nos. LA)

Nos 3 3 3 3 3 3 3 3 3 3 2 0 2 0 0 34

17 11 KV 9KA line type LA set 4 4 4 4 4 4 4 4 4 4 5 0 6 0 0 51

18 33 KV outdoor VCB with mounting structure

complete No 0 0 0 0 0 0 0 0 0 3 3 1 3 0 0 10

19 11 KV outdoor VCB conventional type with

mounting structure complete No 0 0 0 0 0 0 0 0 0 6 7 8 0 0 21

20

Construction of CC foundation for conventional

VCB ( both 33 & 11KV) including supply of all

foundation materials & Labour

Nos 0 0 0 0 0 0 0 0 0 9 10 1 11 0 0 31

21 33 KV Polymer Post insulator No 6 6 6 6 6 6 6 6 6 6 6 0 0 0 0 66

22 33 KV Polymer Pin insulator with pin No 6 6 6 6 6 6 6 6 6 6 6 0 0 0 0 66

23 UPS No 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 10

24 Desktop

No 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 10

25

Installation of earthing system with MS flats

50x10mm for mate and 25X6mm Flat for riser with

50mm GI electrodes of length 3 mtr size etc

SqM 600 600 600 600 600 600 600 600 600 600 300 0 600 0 0 6900

26 11/.4 KV 100 KVA Transformer No 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 10

27 11 KV 150 Amp D.O set St 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 10

28 11 KV 150 Amp GOAB Set 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 10

29 LT XLPE 120 Sqmm single core Cable for station

Tr. Mtr 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 2000

30 AC Distribution Board ( DTR Cubical for 100 KVA

Tr.) as per specification No 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 11

31 11 KV polymer Pin Insulator with Pin No 36 36 36 36 36 36 36 36 36 36 36 0 0 0 0 396

32 SP 60 GI tubular pole with CC foundation for 11

KV Bus extension Nos 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 12

33 GI Pole Clamp Nos 0 0 0 0 0 0 0 0 0 0 0 0 30 0 0 30

Page 6: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

34

Lattice Pole 8.5 Mtr length made of GI Channel ,

G.I Flat & G.I base plate of following size :-

a. Channel 75X75X200X8 mm 8.5 Mtr length two

nos.

b. Flat of size 40X6X225 mm to be fixed in interval

of 0.5mtr. (48nos. in one pole)

c. Base pate 400X400X8mm with four hole for

erection one no.

d. Side plate 8mm thick for supporting the poles

connecting the base plate two nos.

Nos. 16 16 16 16 16 16 16 16 16 16 14 0 0 0 0 174

35

Lattice Pole 5.5 Mtr length made of GI Channel ,

G.I Flat & G.I base plate of following size :-

a. Channel 75X75X200X8 mm 5.5 Mtr length two

nos.

b. Flat of size 40X6X225 mm to be fixed in interval

of 0.5mtr. (30nos. in one pole)

c. Base plate 400X400X10mm with four hole for

erection one no.

d. Side plate 8mm thick for supporting the poles

connecting the base plate two nos.

Nos. 6 6 6 6 6 6 6 6 6 6 0 0 0 0 0 60

36

Construction of CC foundation for lattice

structure’s pole etc (11KV & 33KV including

supply of all foundation materials & Labour

Nos. 22 22 22 22 22 22 22 22 22 22 14 0 0 0 0 234

37

Lattice Beam made of GI Channel & G.I Flat of

following size :-

a. Channel 75X75X200X8 mm 5.5 Mtr length two

nos.

b. Flat of size 40X6mm to be fixed in interval of

0.5mtr. (30nos.)

Nos. 12 11 11 11 11 11 11 11 11 11 0 0 0 0 111

38

Lattice Beam made of GI Channel & G.I Flat of

following size :-

a. Channel 75X75X200X8 mm 4 Mtr length two

nos.

b. Flat of size 40X6 mm to be fixed in interval of

0.5mtr. (22nos.)

Nos. 7 7 7 7 7 7 7 7 7 7 7 0 0 0 0 77

39

Lattice Beam made of GI Channel & G.I Flat of

following size :-

a. Channel 75X75X200X8 mm 11 Mtr length two

nos.

b. Flat of size 40X6 mm to be fixed in interval of

0.5mtr. (48nos.)

Nos. 6 6 6 6 6 6 6 6 6 6 6 0 0 0 0 66

Page 7: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

40 GI Nuts & Bolt of different size KG 100 100 100 100 100 100 100 100 100 100 50 0 0 0 0 1050

41 GI Channel 100X50X50X6mm Mtr 70 70 70 70 70 70 70 70 70 70 70 0 81 0 0 851

42 PG Clamp for wolf No 36 36 36 36 36 36 36 36 36 36 36 0 36 0 0 432

43 AAAC Wolf Conductor Mtr 150 150 150 150 150 150 150 150 150 150 150 0 150 0 0 1800

44 33 KV 70 KN Polymer Disc Insulator including

hardware No 30 30 30 30 30 30 30 30 30 30 30 0 30 0 0 360

45 AAAC Panther Conductor for 11 Kv side Mtr 300 300 300 300 300 300 300 300 300 300 300 0 300 0 0 3600

46 11 KV 45 KN Polymer Disc Insulator including

hardware No 50 50 50 50 50 50 50 50 50 50 50 0 50 0 0 600

47 T Clamp for wolf No 12 12 12 12 12 12 12 12 12 12 12 0 12 0 0 144

48 Tension Clamp for wolf No 30 30 30 30 30 30 30 30 30 30 30 0 30 0 0 360

49 T Clamp for Panther to Wolf No 36 36 36 36 36 36 36 36 36 36 36 0 36 0 0 432

50 Tension Clamp for Panther No 50 50 50 50 50 50 50 50 50 50 50 0 50 0 0 600

51

Construction of room for Operating staff Assam

type with Dyna roofing [20 sqm]including water

supply accessories & sanitary works, internal

electrification

No 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 9

52 Switchyard gravelling with broken 50 mm (HBG)

broken gravel 0.15 CM high sq.M 600 600 600 600 600 600 600 600 600 600 600 300 0 200 200 7300

53

Construction of transformer pad for 100 KVA 11/.4

KV S/S DTR including supply of all foundation

materials & Labour

Nos. 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 10

54

Construction of Control Cable Trenches including

supply of all materials and labour as per

specification and drawing

Mtr 70 70 70 70 70 70 70 70 70 70 120 0 70 0 0 890

55

Installation of deep tube well with all piping, 1 HP

submersible pump, 500 liter overhead storage tank

etc as per Specification with all materials and

labour.

No 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 11

56 33 KV C&R panel for feeder with Numerical relay

and static TVM No 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 3

57 33 KV C&R panel for Transformer with Numerical

relay and static TVM No 0 0 0 0 0 0 0 0 0 2 2 1 2 0 0 7

58 11 KV C&R panel for feeder with Numerical relay

and static TVM No 0 0 0 0 0 0 0 0 0 6 7 0 8 0 0 21

59 33 KV/110 Volt CT 200-400/5-5 Amp with GI

mounting structure St 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 3

Page 8: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

60 33 KV/110 Volt CT100-200/5-5-5 Amp with GI

mounting structure St 0 0 0 0 0 0 0 0 0 2 2 1 2 0 0 7

61 33 KV/110 volt PT St 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 3

62 11KV/110V CT 300-600/5-5-2.87 A with

marshaling Box and GI mounting structure Set 0 0 0 0 0 0 0 0 0 2 2 0 2 0 0 6

63

11 KV /110 V CT 100-200/5-5 A with marshaling

Box and GI mounting structure

Set 0 0 0 0 0 0 0 0 0 4 5 0 6 0 0 15

64 11 KV /110 V PT with marshaling Box and GI

mounting structurr Set 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 4

65

Construction of CC foundation for CT & PT etc

(11KV & 33KV including supply of all foundation

materials & Labour ( one set Comprise of 3 Nos.

PT/CT)

Nos 0 0 0 0 0 0 0 0 0 10 13 1 22 0 0 46

66 DC DB no 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 3

67 AC DB No 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 3

68 Battery Charger No 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 2

69 Maintenance free Battery bank No 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 3

70 2.5mm 2 core control cable for Cable Mtr 100 100 100 100 100 100 100 100 100 100 200 200 300 100 100 1900

71 2.5mm 4 core control cable for Cable Mtr 0 0 0 0 0 0 0 0 0 0 600 400 500 100 100 1700

72 2.5mm control cable 7 core Mtr 0 0 0 0 0 0 0 0 0 0 1200 800 1600 200 200 4000

73 XLPE 11 KV three core 300 Sq. MM cable Mtr 0 0 0 0 0 0 0 0 0 0 0 0 0 500 500 1000

74 Cable kite for 11 KV 3 core 300 Sq.mm cable

outdoor No 0 0 0 0 0 0 0 0 0 0 0 0 0 5 5 10

75 Improvement of earthing system LS 0 0 0 0 0 0 0 0 0 0 0 1 1 1 3

Page 9: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

CORRECTED PRICE BID FOR PACKAGE NO TDF/11-14/SS/BK

Tender Proforma part-II (Price Bid) ANNEXURE-V

NIT NO.CGM (PP&D)/ APDCL/TDF-2011-14/69/TENDER/69/09(A) Dated 21.06.12

Sl

No Name of the Item Unit qty

FORD cost of materials

in Rs

Cost of Erection of materials

inclusive of testing &

commissioning

in Rs

Total Price in

Rs.

WCT 5%

on

9

in Rs

Service tax

12.36%

on

8

in Rs

Total quoted

Rate

in Rs.

Unit Rate Total Unit Rate Total

1 2 3 4 5 6=4X5 7 8=4X7 9=6+8 10=9X5% 11=8X12.3

6% 12=9+10+11

1

Erection , testing and commissioning of 33/11KV,

10MVA Power transformer ( transformer will be

supplied by APDCL ) and laying & terminating all

signalling & control unites

No 4

2

Erection , testing and commissioning of 33/11KV, 5

MVA Power transformer ( transformer will be

supplied by APDCL ) and laying & terminating all

signalling & control unites

Nos. 23

3

Construction of transformer pad for 10 Mva 33/11

KV including supply of all foundation materials &

Labour

Nos 4

4

Construction of transformer pad for 5 Mva 33/11 KV

including supply of all foundation materials &

Labour

Nos. 23

5

Supply, erection, testing and commissioning of 33

LA with surge monitor with GI mounting structure

as per specification

st 38

6

Construction of CC foundation for 33 KV LA

including supply of all foundation materials &

Labour ( one set Comprise of 3 Nos. LA)

Nos. 38

7

Supply, erection, testing and commissioning of 33

kV Isolator, 800 A with earth blade with GI

mounting structure and all accessories as per TS and

approved drawing.

St 14

8

Supply, erection, testing and commissioning of 33

kV Isolator, 800 A without earth blade with GI

mounting structure and all accessories as per TS and

approved drawing.

St 73

Page 10: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

9

Construction of CC foundation for 33 KV isolator

including supply of all foundation materials &

Labour

Nos. 87

10

Supply, erection, testing and commissioning of

33KV Autorecloser type VCB remote operable as

well as locally operable with In-build Modem &

mounting GI Structure as per specification

Nos. 28

11

Supply, erection, testing and commissioning of

11KV Autorecloser type VCB remote operable as

well as locally operable with In-build Modem &

mounting GI Structure as per specification

Nos. 54

12

Construction of CC foundation for auto

recloser/remote type VCB ( both 33 & 11KV)

including supply of all foundation materials &

Labour

Nos. 82

13

Supply, erection, testing and commissioning of 11

KV Isolator 800 Amp with GI Structure as per

specification

St 48

14

Supply, erection, testing and commissioning of 11

KV Isolator 600 Amp GI Structure as per

specification

St 107

15

Construction of CC foundation for 11 KV isolator

including supply of all foundation materials &

Labour

Nos 155

16 Aluminium Bars for connecting the 11 KV side

50mm X 6mm thickness 3 mtrs long Psc 72

17 Supply, erection, testing and commissioning of 11

KV 9KA station type LA Set 34

18

Construction of CC foundation for 11 KV LA

including supply of all foundation materials &

Labour ( one set Comprise of 3 Nos. LA)

Nos 34

19 Supply, erection, testing and commissioning of 11

KV 9KA line type LA set 51

20

Supply, erection, testing and commissioning of 33

KV VCB Outdoor type(1250A, 25KA)) along with

terminal box, marshalling box, GI mounting structure

and all accessories as per TS and approved drawing.

No 10

21

Supply, erection, testing and commissioning of 11

KV outdoor VCB conventional type with mounting

structure complete

No 21

Page 11: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

22

Construction of CC foundation for conventional

outdoor VCB ( both 33 & 11KV) including supply

of all foundation materials & Labour

Nos 31

23 Supply, erection, testing and commissioning of 33

KV Polymer Post insulator No 66

24 Supply, erection, testing and commissioning of 33

KV Polymer Pin insulator with pin No 66

25 UPS No 10

26 Desktop No 10

27

Installation of earthing system with MS flats

50x10mm for mate and 25X6mm flat for riser with

50mm GI electrodes of length 3 mtr size etc

SqM 6900

28 Supply, erection, testing and commissioning of 11/.4

KV 100 KVA Transformer No 10

29 Supply, erection, testing and commissioning of 11

KV 150 Amp D.O set St 10

30 Supply, erection, testing and commissioning of 11

KV 150 Amp GOAB Set 10

31 Supply, erection, testing and commissioning of LT

XLPE 120 Sqmm single core Cable for station Tr. Mtr 2000

32

Supply, erection, testing and commissioning of AC

Distribution Board ( DTR Cubical for 100 KVA Tr.)

as per specification

No 11

33 Supply, erection, testing and commissioning of 11

KV polymer Pin Insulator with Pin No 396

34 Supply & erection of SP 60 GI tubular pole with CC

foundation for 11 KV Bus extension Nos 12

35 Supply & erection of GI Pole Clamp Nos 30

36

Supply, erection of Lattice Pole 8.5 Mtr length

made of GI Channel , G.I flat & G.I base plate of

following size :-

a. Channel 75X75X200X8 mm 8.5 Mtr length two

nos.

b. Flat of size 40X6X225 mm to be fixed in interval

of 0.5mtr. (48nos. in one pole)

c. Base pate 400X400X8mm with four hole for

Nos. 174

Page 12: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

erection one no.

d. Side plate 8mm thick for supporting the poles

connecting the base plate two nos.

37

Supply, erection of Lattice Pole 5.5 Mtr length made

of GI Channel , G.I flat & G.I base plate of

following size :-

a. Channel 75X75X200X8 mm 5.5 Mtr length two

nos.

b. Flat of size 40X6X225 mm to be fixed in interval

of 0.5mtr. (30nos. in one pole)

c. Base plate 400X400X10mm with four hole for

erection one no.

d. Side plate 8mm thick for supporting the poles

connecting the base plate two nos.

Nos. 60

38

Construction of CC foundation for lattice structure’s

pole etc (11KV & 33KV including supply of all

foundation materials & Labour

Nos. 234

39

Supply& erection of Lattice Beam made of GI

Channel & G.I flat of following size :-

a. Channel 75X75X200X8 mm 5.5 Mtr length two

nos.

b. Flat of size 40X6mm to be fixed in interval of

0.5mtr. (30nos.)

Nos. 111

40

Supply, erection of Lattice Beam made of GI

Channel & G.I flat of following size :-

a. Channel 75X75X200X8 mm 4 Mtr length two nos.

b. Flat of size 40X6 mm to be fixed in interval of

0.5mtr. (22nos.)

Nos. 77

41

Supply& erection of Lattice Beam made of GI

Channel & G.I flat of following size :-

a. Channel 75X75X200X8 mm 11 Mtr length two

nos.

b. Flat of size 40X6 mm to be fixed in interval of

0.5mtr. (48nos.)

Nos. 66

42 Supply, erection of GI Nuts & Bolt of different size KG 1050

43 GI Channel 100X50X50X6mm Mtr 851

44 Supply, erection of PG Clamp for wolf No 432

Page 13: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

45 AAAC Wolf Conductor Mtr 1800

46 33 KV 70 KN Polymer Disc Insulator including

hardware No 360

47 AAAC Panther Conductor for 11 Kv side Mtr 3600

48 11 KV 45 KN Polymer Disc Insulator including

hardware No 600

49 T Clamp for wolf No 144

50 Tension Clamp for wolf No 360

51 T Clamp for Panther to Wolf No 432

52 Tension Clamp for Panther No 600

53

Construction of room for Operating staff Assam type

with Dyna roofing [15 sqm]including water supply

accessories & sanitary works, internal electrification

No 9

54 Switchyard gravelling with broken 50 mm (HBG)

broken gravel 0.15 CM hight sq.M 7300

55

Construction of transformer pad for 100 KVA 11/.4

KV S/S DTR including supply of all foundation

materials & Labour

Nos. 10

56

Construction of Control Cable Trenches including

supply of all materials and labour as per specification

and drawing

Mtr 890

57

Installation of deep tube well with all piping, 1 HP

submersible pump, 500 litre overhead storage tank

etc as per Specification with all materials and labour.

No 11

58

Supply, erection, testing and commissioning of 33

kV C&R Panel for Feeder with numeric relay (O/C,

E/F ), Static TVM and all accessories as per TS.

No 3

59

Supply, erection, testing and commissioning of 33

kV C&R Panel for transformer with numeric relay

(O/C, E/F & differential ), Static TVM and all

accessories as per TS .

No 7

60

Supply, erection, testing and commissioning of 11

KV C&R pannel for feeder with Numerical realay

and static TVM

nos 21

Page 14: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

61

Supply, erection, testing and commissioning of 33

KV/110 Volt CT 200-400/5-5 Amp with GI

mounting structure

St 3

62

Supply, erection, testing and commissioning of 33

KV/110 Volt CT100-200/5-5-5 Amp with GI

mounting structure

St 7

63

Supply, erection, testing and commissioning of 33

KV (33/√3)/(110/√3) V Potential Transformer

Outdoor type along with terminal box, marshalling

box, GI mounting structure as per TS and approved

drawing ( one set Comprise of 3 Nos. PT)

St 2

64

Supply, erection, testing and commissioning of

11KV/110V CT 300-600/5-5-2.87 A with

marshaling Box and GI mounting structure

Set 6

65

Supply, erection, testing and commissioning of 11

KV /110 V CT 100-200/5-5 A with marshaling Box

and GI mounting structure

Set 15

66

Supply, erection, testing and commissioning of 11

KV /110 V PT with marshaling Box and GI

mounting structure

Set 4

67

Construction of CC foundation for CT & PT etc

(11KV & 33KV including supply of all foundation

materials & Labour ( one set Comprise of 3 Nos.

PT/CT)

St 46

68 Supply, erection, testing and commissioning of DC

DB No 3

69 Supply, erection, testing and commissioning of

ACDB No 3

70 Supply, erection, testing and commissioning of

Battery Charger No 2

71 Supply, erection, testing and commissioning of

Maintanance free 100 AH 110 V Battery bank Set 3

72 Supply, erection, testing and commissioning of

2.5mm control cable for Cable 2 core Mtr 1900

73 Supply, erection, testing and commissioning of

2.5mm control cable for Cable 4 core Mtr 1700

74 Supply, erection, testing and commissioning of

2.5mm control cable 7 core Mtr 4000

75 Supply, erection, testing and commissioning of

XLPE 11 KV three core 300 Sq. MM cable Mtr 1000

Page 15: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

76 Supply, erection, testing and commissioning of Cable

kite for 11 KV 3 core 300 Sq.mm cable outdoor No 10

77 Improvement of earting system LS

3

GRAND TOTAL in Rupees

Grand total is to written in words

Signature of the authorized signatory of firm/individual with seal

( Full Name of the signatory)

Note :-

** In case some uses the old BOQ, evolution will be done as per the new one.

** Others terms and condition will remain same

Page 16: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

In connection to the correction of Technical specification and some details of the items mentioned below:

Sl

No

Tender

No

Packa

ge No Written as Corrected as

1

CG

M (

PP

&D

)/ A

PD

CL

/TD

F-2

011

-14/6

9/T

EN

DE

R/6

9/0

9(A

)

Fo

r A

ll t

he

Pac

kag

es

UPS UPS 1 KVA line interactive with external battery for 1 hr. back up

2 Desktop Desk top , Intel Pentium core 2 duo I3 processor 2100 sequence, @3.4

GHz, 3 MB L3 cache HDD-1TB, RAM 3 GB with 21 inch TFT monitor.

3 Installation of earthing system with MS flats 50x10mm for mate and

25X6mm flat for riser with 50mm GI electrodes of length 3 mtr size etc

Installation of earthing system with MS flats 50x10mm for mate and

25X6mm flat for riser with 50mm GI electrodes of length 3 mtr size etc.

Quantity of electrodes is 0.06 nos /sq. M generally subjected to changed

depending upon the condition /resistance of the soil.

4 Supply, erection, testing and commissioning of 11 KV 150 Amp GOAB As per REC specification

5 Supply, erection, testing and commissioning of AC Distribution Board (

DTR Cubical for 100 KVA Tr.) as per specification

Supply, erection, testing and commissioning of AC Distribution Board

(DTR Cubical for 100 KVA Tr.) made of MS sheet , powder coated with

one MCCB 200 Amp 4 pole incoming & three 100 amp 3 phase 3 pole one

63 amp 3 phase 4 pole and one 63 amp 1phase outgoing with one TVM.

Supply, erection, testing and commissioning of 100 KVA 11/.4 KV

Transformer

Supply, erection, testing and commissioning of as per specification of 3

star category as approved by BEE

6

Supply, erection of Lattice Pole 5.5 Mtr length made of GI Channel , G.I

flat & G.I base plate of following size :-

c. Base plate 400X400X10 mm with four hole for erection one no.

Supply, erection of Lattice Pole 5.5 Mtr length made of GI Channel , G.I

flat & G.I base plate of following size :-

c. Base plate 400X400X8 mm with four hole for erection one no.

7

Supply& erection of Lattice Beam made of GI Channel & G.I flat of

following size :-

b. Flat of size 40X6 mm to be fixed in interval of 0.5mtr. (30nos.)

Supply& erection of Lattice Beam made of GI Channel & G.I flat of

following size :-

b. Flat of size 40X6X225mm to be fixed in interval of 0.5mtr. (30nos.)

8

Supply, erection of Lattice Beam made of GI Channel & G.I flat of

following size :-

b. Flat of size 40X6 mm to be fixed in interval of 0.5mtr. (22nos.)

Supply, erection of Lattice Beam made of GI Channel & G.I flat of

following size :-

b. Flat of size 40X6X225 mm to be fixed in interval of 0.5mtr. (22nos.)

9

Supply& erection of Lattice Beam made of GI Channel & G.I flat of

following size :-

b. Flat of size 40X6 mmto be fixed in interval of 0.5mtr. (48nos.)

Supply& erection of Lattice Beam made of GI Channel & G.I flat of

following size :-

b. Flat of size 40X6X225 mmto be fixed in interval of 0.5mtr. (48nos.)

Page 17: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

10

CG

M (

PP

&D

)/ A

PD

CL

/TD

F-2

011

14/6

9/T

EN

DE

R/6

9/0

9(A

)

Fo

r A

ll t

he

Pac

kag

es

Construction of room for Operating staff Assam type with Dyna roofing

[15 sqm]including water supply accessories & sanitary works, internal

electrification

Construction of room for Operating staff Assam type with Dyna roofing

[20 sqm]including water supply accessories & sanitary works, internal

electrification

11 Supply, erection, testing and commissioning of 33 KV/110V CT 200-

400/5-5 Amp with GI mounting structure

Supply, erection, testing and commissioning of 33 KV CT 200-400/5-5

Amp with GI mounting structure

12 Supply, erection, testing and commissioning of 33 KV/110V CT100-200/5-

5-5 Amp with GI mounting structure

Supply, erection, testing and commissioning of 33 KV CT100-200/5-5-5

Amp with GI mounting structure

13 11KV/110V CT 150-300/5-5-2.87 A with marshalling Box and GI

mounting structure

11KV CT 150-300/5-5-2.87 A with marshalling Box and GI mounting

structure

14 11 KV /110 V CT 100-200/5-5 A with marshalling Box and GI mounting

structure 11 KV CT 100-200/5-5 A with marshalling Box and GI mounting structure

15 Construction of Control Cable Trenches including supply of all materials

and labour as per specification and drawing Given separately below

16 Construction of CC foundation Construction of RCC foundation

17 GOAB Gang switch As per REC specification

18

CG

M (

PP

&D

)/ A

PD

CL

/

TD

F-2

01

1-

14

/69

/TE

ND

ER

/69

/09

(B)

Speciation of 33 KV Top Clip 75X40 mm MS 33 KV top Clip Made of GI and of Size 100X50X6X350mm

19 Specification of GI Pole ( to be added)

The steel tubular pole shall be properly brush to make it free from rust and

hot deep galvanized confirming to IS 2629 or equivalent international

specification. Standard applicable IS 266, IS 1852-1973 or equivalent

International specification

20 Disc Insulator 70 KN porcelain Unit in Nos.

Page 18: NIT NO.CGM (PP&D)/ APDCL/TDF-2011 · PDF file... 33/11KV Power transformer &11/0.4 KV Distribution transformer ... CORRECTED BOQ FOR DIFFERENT PACKGES ... 33KV Autorecloser type VCB

75 TH. RCC COVER SLAB

F.G.L.

230 BRICK WALL WITH 15 MM PLASTER & CEMENT TOP. TOPPING IN INSIDE & EXPLODE PORTION

100 TH. RCC SLAB-1:1.5:3

PCC - 1:3:6

F.G.L.

MA

X.

1100

MA

X.

500

230 BRICK WALL WITH 15 MM PLASTER & CEMENT TOP. TOPPING IN INSIDE & EXPLODE PORTION

100 TH. RCC SLAB-1:1.5:3

PCC - 1:3:6

75 TH. RCC COVER SLAB

SECTION OF CABLE TRENCH OF 33/11kV SUB-STATION

N.B.-ALL DIMENSIONS ARE IN MM