![Page 1: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/1.jpg)
New Setup
for
Dart Chamber in ArDM
30.04.2019
1
A. Gendotti, B. Radics, C. Regenfus, Y.A. Rigaut, A. Rubbia, A. Stauffer, T. Viant
![Page 2: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/2.jpg)
SUMMARY:
• Overview• Top Flange
Design (slide #3 to #10)
2
Production Status (slide #11)
Assembly Procedure (slide #13 to #20)
Time Scale (slide #12)
![Page 3: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/3.jpg)
DESIGN:
5 x Cu Pillars: 25mm Dia
~5.3Kg per pillar
5 x SS rings Vertical Reflector supports:
- SS plate 20mmx2mm
- ~0.8 Kg per Ring
Bottom PMTs Array:- 7 PMTs
4 x Pillars Flange to PMT Array:~1.7 Kg Stainless Steel per Pillar
Top and Bottom insulated with PEEK
Top PMTs Array:- 6 PMTs
- No PMT in Center
PMT Reflector: - PTFE 1.5mm thickVertical Reflector
3
Reflector Clamps
![Page 4: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/4.jpg)
ArDM LAr Level
New LAr Level
Diameter Inside the Reflector
Height between Top
and Bottom PMMA Reflector
3x1x1 Coaxial Levelmeter:
4
DESIGN:
![Page 5: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/5.jpg)
5
2D Drawings
![Page 6: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/6.jpg)
6
1
2
3
4
1) Pressure sensors + Valve Move to DArT
2) Levelmeter and coaxial Levemeter NO NEED3) PMTs High Voltage NO NEED
4) Gate Valve + Vacuum Pump Move to DArT
5) PMTs Signal Cables NO NEED6) Gas Rec Move to DArT
7) Lar Snorkel Move to DArT8) HVFT NO NEED
9) Not used
5
6
7
8
9
TOP FLANGE
![Page 7: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/7.jpg)
7
Gate Valve + Vacuum Pump
Pressure Sensors
Gas Rec. and LAr snorkel
TOP FLANGE
SCFT 1 from 3x1x1
![Page 8: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/8.jpg)
8
TOP FLANGE
![Page 9: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/9.jpg)
Y. RIGAUT, IWG Meet. “ArDM run
II: Weekly report”
9
Pressure sensor
7 PMTs
6 PMTs
Capacitive LM
(12 Temperature sensors)
PMTs SIGNAL AND HV CONNECTION
![Page 10: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/10.jpg)
PMTs SIGNAL AND HV CONNECTION
Y. RIGAUT, IWG Meet. “ArDM run
II: Weekly report”
10
DN250CF version currently in application (3m x 1m x 1m)
HV 10kV double ended not use in the
311 due to HV discharges
Here they will be
used for PMTs signal= 1 PMTs signal
12 PMTs signal
12 TTs (temperature)
13 HV connections for PMTs (directly
molded inside dedicated flange)
2 LTs signal (1 level meter)
![Page 11: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/11.jpg)
11
PRODUCTION STATUS
• All the material arrived and already in production process.
• PMT PCBs ready for Test in GAr
• PMTs and Disk Reflector need to be coated at CERN
• Vertical reflector foils are already at LSC (old ArDM single phase detector)
• Teflon Reflector
• PE1000 protection for PMTs• Ring Holder for PMTs PMTs PCB
Bottom PMT Holder
Top PMT Holder
Installation Ring
![Page 12: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/12.jpg)
12
TIME SCALE
• All parts should be ready by middle of May
• Cleaning
• Assembly of the PMTs Top and Bottom Array at ETH (Minimum 1 Week)
• Prepare for shipping
• Goal Everything ready to ship by the beginning of June 2019.
Assembly Work at LSC:
Not yet planned (estimated 2/3 Weeks of Work)
![Page 13: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/13.jpg)
ASSEMBLY PROCEDURE
13
![Page 14: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/14.jpg)
STEP 1:
• Top and Bottom PMTs array assembled in the clean room (ETH or CERN)
• Packed and Shipped ready for assembly to LSC
14
![Page 15: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/15.jpg)
STEP 1:
• Top Flange on the Support Shower
• 4x SS Pillar
15
![Page 16: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/16.jpg)
STEP 2:
• Top PMTs array
16
![Page 17: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/17.jpg)
STEP 3:
• 5 x Cu Pillars
Comment: eventually simple Bottom
SS ring can be installed in order to keep aligned the pillars
17
![Page 18: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/18.jpg)
STEP 4:
• Vertical Reflector supports rings
18
![Page 19: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/19.jpg)
STEP 5:
• Vertical Reflector installed from inside
19
![Page 20: New Setup for Dart Chamber in ArDM - agenda.infn.it fileDESIGN: 5 x Cu Pillars: 25mm Dia ~5.3Kg per pillar 5 x SS rings Vertical Reflector supports: - SS plate 20mmx2mm - ~0.8 Kg per](https://reader030.fdocuments.us/reader030/viewer/2022041208/5d66029388c993df378b7b3b/html5/thumbnails/20.jpg)
STEP 6:
• Bottom PMTs array
• Coaxial Levelmeter• Cabling • Cover Top and Bottom PMTs array with Teflon Tape
STEP 7:
• Insertion in ArDM Dewar
20