New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg /...

17
New Priok Container Terminal One Successof Indonesian PPPPortsProject 13 June 2018 https://w ww .npct1 .co.id/ STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

Transcript of New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg /...

Page 1: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

New Priok Container Terminal One

Success of Indonesian PPP PortsProject

13 June2018https://www.npct1.co.id/

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

Page 2: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

Background

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

• Tanjung Priok Port handles more than 50% of the internationalcontainer

throughput in Indonesia (6 m++TEU/year).

• Existing terminals had been operating at over 95% of capacity overthe

past years.

• There was urgent need to buildnew and efficient container terminals to

handle more volume with largerships.

• The President of Indonesia decided to launch theNew Priok Development

Project (Presidential Decree No. 36 of 2012 dated 5 April2012).

• PT New Priok Container Terminal One (NPCT1) is the first phase of New

Priok Development Project, commenced its operation on 18 August2016.

Page 3: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

NPCT1 Location

NPCT1Tanjung Priok / Kalibaru portarea

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

Page 4: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

Southern

AccessRoad

Common

GateArea

CT2CT3

Designed Capacity 1.5Mil TEUp.a

Throughput

(estimation

)

FY17: 828k TEU

FY18: 1.0Mil TEU

Eastern

AccessRoad

NPCT1

prog

Reclamation work under

ress by IPC

New Priok Development Project Overview

Jalan Tol Cibitung –

Cilincing (JTCC)

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

Page 5: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

Project Chronicles and NPCT1 Startup Milestone

2nd TrialOps

(27th May2016)1st Trial Ops

(28th Jan 2016)

3rd Trial Ops

(2 July 2016)

Commercial Ops

(18 Aug 2016)

Pre Ops

(3 Aug 2016)

Chronicles Who When

Master Plan Indonesian and Japanese Gov 2011 ~

Feasibility Study (incl. Biz structure) Indonesia Ports Corporation (“IPC”) Mid / 2012 ~

CT1 OperatorTender IPC Beg / 2013~

Terminal Construction (infrastructure) IPC Beg / 2013 ~ End / 2015

Contract IPC and ForeignShareholders Mid / 2014

Terminal Construction (superstructure) NPCT1 Beg/ 2015 ~Mid / 2016

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

Page 6: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

Positioning of PPP

Public Works

Design & Build

Design & Build & Operate

PFI (Private FinanceInitiative)

BTO, BLO, BOO, BOT

Long Term Business Ownership

Privatization

Private Project

PPP

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

Involvement of PrivateEntity

Risk

of P

rivate

Entit

y

Page 7: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

STRICTLY CONFIDENTIAL. All righ ts reserved. No Content can be reproduced without permission

Types of PPP

Responsibility Case1 Case2 Case3 Case4 Case5

Public

Priv

ate

*1

Public

Priv

ate

*1

Public

Priv

ate

*1

Public

Priv

ate

*1

Public

Priv

ate

Master Plan / Concession ✔ ✔ ✔ ✔ ✔

Construction Infrastructure ✔ ✔ ✔ ✔ ✔

Superstructure ✔ ✔ ✔ ✔ ✔

Equipment ✔ ✔ ✔ ✔ ✔

Ownership Land ✔ ✔ ✔ ✔ ✔

Infrastructure ✔ ✔ ✔ ✔ ✔

Superstructure ✔ ✔ ✔ ✔ ✔

Equipment ✔ ✔ ✔ ✔ ✔

Operation ✔ ✔ ✔ ✔ ✔

Case1 Case2 Case3 Case4 Case5

South Africa,

Israel, smallports,

etc

Japan, etc New Priok CT1, Europe, US, Hong Kong,

Taiwan, Thailand/Laem Chabang, India,

etc

Singapore,UK,

Oceania, etc

Page 8: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

Structure of NPCT1 Project – PPP/BOT

Responsibility Public

(IPC)

Private

(NPCT1)

Master Plan / Concession ✔

Construction Terminal &

Concession Area Infrastructure

(dredging, access road, etc.)

Superstructure (office bldg.,

workshop, terminal gate,etc.)

Equipment (Quay Crane, Yard

Crane, Prime Movers, etc.)

Ownership Terminal ✔

Concession Area Infrastructure ✔

Superstructure ✔

Equipment ✔

Operation ✔

Ministry of

Transportation /

PortAuthority

IPC

Concession

NPCT1

(JV of IPC and Foreign

Shareholders)

Construction&

Operation

Agreement

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

Page 9: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

Key to Success

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

• Clear segregation of responsibility between Public andPrivate

• Risk vs Reward among Public and Private is well balanced

• Joint / close progress monitoring

Page 10: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

Successful Role Sharing

IPC Foreign Investors

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

• Operation / IT

• Commercial

• Finance

• Administration

• Local Authorities /

Regulators

• Global Marketing

Page 11: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

Shareholding Structure

Foreign Investors

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

IPC:

• 100% Indonesian Government owned enterprise.

• The largest port operator in Indonesia with 12ports

located in the fastest growing provinces, including

Tanjung Priok, the primary gateway port toJakarta

Page 12: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

STRICTLY CONFIDENTIAL.All rights reserved. No Content can be reproduced without permission

NPCT1 Overview

Commencement Date 18 Aug2016

Operation 24/7

Designed Capacity 1.5Mil TEU

Berth Length 850m

Size / Space 32Ha

Depth 16m

Maximum Vessel Size Post New Panamax(LOA: 400m, Vessel Capa:14,000TEU)

Quay Crane 8 QCs

Yard Crane 20 RTGs (4 additional RTGs will be delivered in2019)

Page 13: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

NPCT1 Location and Hinterland Access

1

2 4

8 93

6

7

5

10

12

Tanjung Priok accesshighway:

Operational Jakarta Outer Ring Road 2 (JORR2):

Construction target: 2019 - 2020

Jakarta - Cikampek Expressway & LRT:

Construction Target: 2019 – 2020

(elevated construction)

Industrial Estates 11

1. MM2100 5. Delta Silicon2-6 9. KIIC

2. EJIP 6. GIICDeltamas 10. Mitra Karawang

3. BIIE 7. Jababeka 11. Surya Cipta

4. Delta Silicon1 8. Bintan Puspita 12. Bukit Indah

Page 14: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

UKBYOK

SIN

CMT

PKG

LCH

TPP

TYO KWS SMZ

NGO YKK

HK

SHK

NPCT1

SRGSUB

BTU

Australia & NewZealandSTRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

PNJ AU NZADA BLU WLG MEL POE NPESYD TIU TRGAUK LYTBNE NSN

TAO

LYG

SHANGB

TP

E

KHH

KANPUS

YTN

PTK

VYP

DLCXGG

DVO

SFSMNL

BTG

ToEurope

Weekly Service Calling Ports

• Covering most of Asia Pacificmajor

ports that connects customers’

manufacturing sites and markets.

• Next target is to achieve LongHaul

Services.

Page 15: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

Clear Visitor Protocol for Security

Strict requirement to wear PersonalProtectiveEquipment on all mandatoryArea

Emergency Response Team (ERT) supported by own Fire Engines

Security Terminal Gate Screening (unauthorizedpersonnel, weapons, etc.)

Provide Safety Induction and Flyer/Brochure forHaulier Safety Protocol

Regular Security Patrol at Yard

We Care Safety and Security at Terminal

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

Page 16: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

We Care Safety and Security at Terminal

STRICTLYCONFIDENTIAL. All rights reserved. No Content can be reproduced without permission

Page 17: New Priok Container Terminal 1 · 6/13/2018  · Terminal Construction(infrastructure) IPC Beg / 2013 ~ End / 2015 Contract IPC and ForeignShareholders Mid / 2014 Terminal Construction(superstructure)

ThankYou!