NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski,...

45
NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.- Modjeski and Masters, Inc. Andy Nowak, Ph.D., University of Nebraska 1

Transcript of NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski,...

Page 1: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

VOBUG Nashville– 2010

NCHRP 12-78Evaluation of Load Rating by LRFR

Mark Mlynarski, P.E. – Michael Baker Jr., Inc.Wagdy Wassef, Ph.D. P.E.- Modjeski and Masters, Inc.

Andy Nowak, Ph.D., University of Nebraska

1

Page 2: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

AASHTO Bridge – T-18Update of NCHRP 12-78

Evaluation of Load Rating by LRFRPanel Members

Matt Farrar, Idaho – ChairTim Armbrecht, Illinois

George Christian, New YorkGeorge Conner, Alabama

Becky Curtis, MichiganWilliam R. Cox, ASBI

2

Artur D’Andrea, LouisiannaMurugesu Vinayagamoorthy,

CaliforniaDr. Pe-Shen Yang, ArizonaDr. Firas Ibrahim, FHWA

Waseem Dekelbab, NCHRP

Page 3: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Background

What is NCHRP 12-78?

3

Page 4: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Background

4

• NCHRP 12-46• “Guide Manual for Condition Evaluation and

LRFR of Highway Bridges, 1st Edition and 2005 Interim”

• HSCOBS wanted additional research to explain differences with LFR

• NCHRP 20-7 (Task 122) (Mertz)• Flexural ratings/ small sample

• NCHRP 12-78 -Evaluation of Load Rating by LRFR

Page 5: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

12-78 Objectives

5

• Recommend refinements to the LRFR methods in the AASHTO MBE

• Explain changes in truck weight restrictions

• Develop a comprehensive database (1500 bridges) – Virtis Database

• Develop the proposed refinements

Page 6: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Topics

•Preliminary Phase

•Vehicle/Bridge selection

•Gathering/Analyzing

Importance of Virtis

Page 7: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary Phase

• Survey• Collect Virtis Data• Review/ Analyze NBI data

7

Page 8: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseSurvey

8

• Surveys sent to all states• Questions related to load

rating procedures• Solicit vehicle information and

bridge data (Virtis)

Page 9: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseSurvey

9

• Responses to survey (33 total) Manitoba

Page 10: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseCollect Virtis Data

10

AASHTOWare Bridge Data Manitoba

State#

Bridges

Alabama 3139Illinois 3232Michigan 378Missouri 4644New York 5412Oklahoma 44S. Dakota 1135Tennessee 53

Total 18038

Page 11: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseCollect Virtis Data

11

Other sources Manitoba State Bridges

Virginia 20 LRFRIdaho 100+

Auburn 100 BridgesOregon BRASS

500 LRFRNew York AdditionalWyoming 20-7 Task 122

Bridges

Page 12: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseCollect Virtis Data

12

• 18,000 + Virtis bridges• 1500 from these

• 300 + vehicles• 8 selected

Page 13: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseAnalyze NBI Data

13

• 2008 NBI data used• Software to analyze NBI DB• Certain records ignored

Page 14: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseAnalyze NBI Data

14

NBI Records IgnoredNBI Item Restriction/Items Ignored

5a – Record Type Ignore values <> 1

31 – Design Load 7- Pedestrian, 8-Railroad

41 – Structure Open/Posted/Closed

D – Open, would be posted or closed except for temporary shoring, E – Open, temp structure, K – Closed

43A – Kind of Material and/or Design

0 – other, 8- Masonry, 9-Aluminum, Wrought Iron, Cast Iron

Page 15: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseAnalyze NBI Data

15

NBI Records IgnoredNBI Item Restriction/Items Ignored

43B – Type of Design/Construction Other, Frames, Arches, Suspension, Stayed Girder, Movables, Tunnel, Culvert, Mixed, Segmental

48 – Length of maximum span 6.1 m (20 ft) < Span Length < 150 m (492 ft)

103 – Temporary Structure Designation

Ignore values where Item 103 = T

Page 16: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseAnalyze NBI Data

16

Software to breakdown data

Page 17: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseAnalyze NBI Data

17

Software to breakdown data

Page 18: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Preliminary PhaseAnalyze NBI Data

18

400,000+ NBI

Records

Final 1500

Bridge Set

Page 19: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

• Vehicle Selection–300+ vehicles to 8

• Bridge Selection–18,000+ bridges to 1500 bridge Sample

• Bulk data change

19

Page 20: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

20

Vehicle Selection

•States - ~ 300 vehicles•Panel - divide into regions•Select vehicles from regional groupings

Page 21: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

21

Vehicle Selection

• Vehicles analyzed using a utility developed by M&M

• Computes LL moments and shears for SS beams and two spans (equal length)

• Ratio to HL-93 vehicle• Vehicles grouped by region

Page 22: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

22

Vehicle Selection

• SW region

0.00

0.50

1.00

1.50

2.00

2.50

0 50 100 150 200 250 300 350 400 450 500

Ra

tio

: T

ruc

k/H

L-9

3

Span (FT)

HI-01 HI-02 HI-03 HI-04 HI-05 HI-06 HI-07 NM-01

NM-02 NM-03 NM-04 NM-05 NM-06 NM-07 NM-08 NM-09

NM-10 TX-01 TX-02 TX-03 TX-04 TX-05

0.00

0.20

0.40

0.60

0.80

1.00

1.20

0 50 100 150 200 250 300 350 400 450 500

Ra

tio

: T

ruc

k/H

L-9

3

Span (FT)

HI-03 HI-04 HI-05 HI-06 HI-07 NM-01 NM-02

NM-03 NM-04 NM-05 NM-06 NM-07 NM-08 NM-09

TX-01 TX-02 TX-03 TX-04 TX-05

Page 23: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

23

Vehicle Selection

Vehicle GVW Length Schematic

DE-07 80 41

FL-04 80 67

NM-04 55.2 22

NC-21 61 21

TX-04 69 20

Vehicle GVW Length Schematic

DE-07 80 41

FL-04 80 67

NM-04 55.2 22

NC-21 61 21

TX-04 69 20

8k

20 k 20 k16 k 16 k

11' 4' 22' 4'

8 k

18k 18k 18k18k

27' 4' 12' 24'

11k6k

19k 19k

6k9' 4' 4' 4'

18.4k

25.3k 25.3k

16' 4'

12k

21.6k

11'

21.6k

11'

Routine Permit Vehicles

Page 24: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

24

Vehicle Selection

Special Permit Vehicles

Vehicle GVW Length Schematic

OR-06 150.5 73.5

IL-01 120 44

WA-02 207 70

13k 15k

21.5k 21.5k 21.5k

11.5' 5.5' 4.5' 30'

21.5k

5'

21.5k

5'

15k

12'

12k

21.5 21.5k 22k

10' 4' 6' 16'

21.5k 21.5k

4'

22k

6' 14'

21.5k 21.5k

4'

22k

6'

20k 20k 20k24k 24k

4' 4' 22' 4'

12k

10'

Page 25: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

• Eight (8) vehicles• HL-93 (LRFR)• HS-20 (LFR)• Type 3, 3S2, 3-3

25

Vehicle Selection

Page 26: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

26

Bridge Selection

Virtis data• Complex database• 18000+ bridges• How do we reduce to compare

with NBI?

Flatten data to compare with NBI

Page 27: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

27

Bridge Selection

Virtis Data AnalysisSame Software for

NBI analysis

Page 28: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

28

Bridge Selection

Graphic comparisons (Year built)

VirtisNBI

Page 29: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

• Virtis bridges selected by–Year–Span length–Bridge/Material Type–Bridge systems only (no line

girders)29

Bridge Selection

Page 30: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

30

Bridge Selection

Bridge Material Total # Girders

Percent %

PS Multispan 238 7.82%PS Simple Span 847 27.83%RC Multispan 105 3.45%RC Simple Span 394 12.95%Steel Multispan 418 13.74%Steel Simple Span 1,041 34.21%Total 3,043 100.00%

Page 31: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

31

Bridge Selection

Bridge Type Total # Girders

Percent %

Multi-girder built up 29 0.95%Multi-girder rolled beam

1,056 34.70%

Multi-girder steel plate

374 12.29%

PS box beam 381 12.52%PS I beam 704 23.14%Reinf Concrete slab 204 6.70%Reinf Concrete T beam

295 9.69%

Total 3,043 100.00%

Page 32: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Vehicle/Bridge Selection

• Modifying Data in Virtis–Small application modify Virtis DB–Effective Flange width–Development length (P/S)–Shear analysis flag–Discard some bridges- choose others

32

Bulk Data Change

Page 33: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

• Software used• Process 12-50• Manipulating 12-50 data

33

Page 34: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

• Virtis 6.1• BRASS LRFR and LFR• Wyoming/ BridgeTech provided

modifications for 12-50 output

34

Software used

Page 35: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

• Total number of BRASS runs• 1500 bridges (3043 girders)• 8 permit vehicles + 1 design +

3 AASHTO loads = 12 vehicles• 2 methods (LRFR – LFR)

35

Software used

Page 36: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

3043 x 12 x 2 =73,032 BRASS runs

36

Software used

Page 37: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

How do we review 73,032 BRASS runs?

Process 12-50

37

Process 12-50

Page 38: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

Process 12-50- Developed under NCHRP 12-50- See NCHRP Report 485 for

details- BRASS uses Process 12-50

38

Process 12-50

Page 39: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

Process 12-50

39

Process 12-50

Page 40: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

40

Manipulating 12-50 data

• BRASS does not produce all results needed in 12-50 format.

• Created application to read Virtis DB for user input data (e.g. span length, girder spacing, etc.)

• Combine user input/BRASS Process 12-50 results into MS Access database

• Process each girder into a single line of output using project developed software

• Output imported to spreadsheet for further calculation/ plotting.

Page 41: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

41

Manipulating 12-50 data

• Databases created for each vehicle for each set of bridges

• Results used to:– Compare dead and live loads– Compare rating factors– Calculate reliability index– Determine if trends exist in data

Page 42: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

42

Manipulating 12-50 data

• Simple Span Steel Bridges – Design Vehicle– Moment Ratings for Interior, Composite girders (432 girders)

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0.00 50.00 100.00 150.00 200.00 250.00

LFR

Rati

ng

Span Length (feet)

Built Up Shapes

Plate Girders

Rolled Shapes

LFR Inventory Rating for HS20 Loading

LRFR Inventory Rating for HL-93 Loading

Page 43: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

43

Manipulating 12-50 data

Angle of Skew

Tributary Width (Girder Spacing)

Year of Construction

Page 44: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Gathering/Analyzing

44

Manipulating 12-50 data

• New checks were noted for LRFR that have significant affect on rating– Longitudinal Steel Stress Rating near ends of

concrete superstructure elements

Without Report ID 85004 With Report ID 85004

Page 45: NCHRP 12-78 VOBUG Nashville– 2010 NCHRP 12-78 Evaluation of Load Rating by LRFR Mark Mlynarski, P.E. – Michael Baker Jr., Inc. Wagdy Wassef, Ph.D. P.E.-

NCHRP 12-78

Current Status

45

• Panel has reviewed and provided comments on our ‘Findings’ report

• We are reviewing and replying to the comments

• Scheduled finish date: November, 2010