NATIONAL RENTAL AFFORDABILITY SCHEME (NRAS) UNIVERSITY OF TASMANIA
(INVERESK CAMPUS ) STUDENT APARTMENTS
19 SEPTEMBER 2015
![Page 2: NATIONAL’RENTAL’AFFORDABILITY’SCHEME’(NRAS)’’ …...national’rental’affordability’scheme’(nras)’’ university’of’tasmania’ (inveresk’campus’)’ student’apartments’](https://reader034.fdocuments.us/reader034/viewer/2022042922/5f6efdac0fd8cd61a512d085/html5/thumbnails/2.jpg)
OFF-‐SITE CONSTRUCTION SEQUENCE NOTES
GENERALREFER TO ENGINEERS DRAWING FOR ALL MEMBER SIZES, LININGS, ANDDETAILS
FILE: teamwork://server.local/1204 131203 MASTER FILE
1404 A90082 Warwick Street Hobart | GPO Box 725 Hobart 7001 AustraliaT 03 6231 9093 | F 03 62319094 | E [email protected]
morrison & breytenbach architects
UTAS INVERESK RESIDENCES CONCEPT DESIGN26|06|14
Construction SequencePAGE SCALE 50mm @ FULL SIZE
100 50#Site Address1#Site Address2
PRELIMINARY
DATE 26/06/14 ISSUE PRELIMINARY ISSUE FOR CONCEPT DESIGN REV -
Ceiling Framing1:505Wall Bracing
1:504
Wall Framing1:503Floor Lining
1:502Floor Framing1:501
Framing Only1:506
![Page 3: NATIONAL’RENTAL’AFFORDABILITY’SCHEME’(NRAS)’’ …...national’rental’affordability’scheme’(nras)’’ university’of’tasmania’ (inveresk’campus’)’ student’apartments’](https://reader034.fdocuments.us/reader034/viewer/2022042922/5f6efdac0fd8cd61a512d085/html5/thumbnails/3.jpg)
FACTORY
![Page 4: NATIONAL’RENTAL’AFFORDABILITY’SCHEME’(NRAS)’’ …...national’rental’affordability’scheme’(nras)’’ university’of’tasmania’ (inveresk’campus’)’ student’apartments’](https://reader034.fdocuments.us/reader034/viewer/2022042922/5f6efdac0fd8cd61a512d085/html5/thumbnails/4.jpg)
FACTORY
![Page 5: NATIONAL’RENTAL’AFFORDABILITY’SCHEME’(NRAS)’’ …...national’rental’affordability’scheme’(nras)’’ university’of’tasmania’ (inveresk’campus’)’ student’apartments’](https://reader034.fdocuments.us/reader034/viewer/2022042922/5f6efdac0fd8cd61a512d085/html5/thumbnails/5.jpg)
FACTORY
![Page 6: NATIONAL’RENTAL’AFFORDABILITY’SCHEME’(NRAS)’’ …...national’rental’affordability’scheme’(nras)’’ university’of’tasmania’ (inveresk’campus’)’ student’apartments’](https://reader034.fdocuments.us/reader034/viewer/2022042922/5f6efdac0fd8cd61a512d085/html5/thumbnails/6.jpg)
ON-‐SITE CONSTRUCTION
![Page 7: NATIONAL’RENTAL’AFFORDABILITY’SCHEME’(NRAS)’’ …...national’rental’affordability’scheme’(nras)’’ university’of’tasmania’ (inveresk’campus’)’ student’apartments’](https://reader034.fdocuments.us/reader034/viewer/2022042922/5f6efdac0fd8cd61a512d085/html5/thumbnails/7.jpg)
ROOF ASSEMBLY & INSTALLATION
![Page 8: NATIONAL’RENTAL’AFFORDABILITY’SCHEME’(NRAS)’’ …...national’rental’affordability’scheme’(nras)’’ university’of’tasmania’ (inveresk’campus’)’ student’apartments’](https://reader034.fdocuments.us/reader034/viewer/2022042922/5f6efdac0fd8cd61a512d085/html5/thumbnails/8.jpg)
MODULE INSTALLATION
![Page 9: NATIONAL’RENTAL’AFFORDABILITY’SCHEME’(NRAS)’’ …...national’rental’affordability’scheme’(nras)’’ university’of’tasmania’ (inveresk’campus’)’ student’apartments’](https://reader034.fdocuments.us/reader034/viewer/2022042922/5f6efdac0fd8cd61a512d085/html5/thumbnails/9.jpg)
CLT INSTALLATION
![Page 10: NATIONAL’RENTAL’AFFORDABILITY’SCHEME’(NRAS)’’ …...national’rental’affordability’scheme’(nras)’’ university’of’tasmania’ (inveresk’campus’)’ student’apartments’](https://reader034.fdocuments.us/reader034/viewer/2022042922/5f6efdac0fd8cd61a512d085/html5/thumbnails/10.jpg)
NEARING COMPLETION