National Performance Measures:

Initial target-setting

Performance Management

Connecticut Department of Transportation

Page 2: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Timeline to May 20, 2018DATE MILESTONE

April 16 Executive reviews recommended state performance targets

April 30 Initial TAMP (Transportation Asset Management Plan) due to FHWA

May 8 Meeting with MPOs to present proposed targets and coordinate to “maximum extent possible”

May 20 State DOT establishes performance targets

Oct 1 State DOT formally submits targets to FHWA

Nov 20 MPOs establish performance targets

Page 3: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Targets to be established• Pavement condition (4)

• Bridge condition (2)

• System reliability (2)

• Freight movement (1)

• Air quality (1)

Page 4: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Target-setting considerations

• Target-setting methodology (maturity)

• Top risks in adopting the target

• Confidence in achieving target

Page 5: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Target-Setting Maturity Model

Systems

Models

Extrapolation

Aspirational

EXPL

ANAT

ORY P

OWER

COMP

LEXI

TYDA

TA I

NTEN

SITY

1. Aspirational Target based on desired outcome, little data used

2. Extrapolation Use historical time series and extend into future

3. Forecasting model Include explanatory variables/covariates in a model, forecast outcome

4. Systems approach Systems techniques (simulation, system dynamics)

& cause-effect relationship

Page 6: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Risks

• Where are our headaches going to come from?• Insufficient investment declining targets

• Abstract target definitions

• Perception (headlines)

• We should have a strategy to address the risks• Develop a communications strategy (telling our story first)

Page 7: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Confidence

• Are we confident we achieve the targets?

Confidence is higher with:• More and better data

• Better understanding, more powerful models

• Control over outcomes

Page 8: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

BridgeCondition Measures

Asset (unit of measure)

Current Condition(NBI submittal 3/2017)

2-year targets (2020)

4-year targets (2022)

Good%

Poor%

Good%

Poor%

Good%

Poor%

NHS Bridge(deck area)

18.1 15.0 22.1 7.9 26.9 5.7

• % of NHS Bridges in “Good” and “Poor” condition

• Max % poor: 10 (MAP-21)

MATURITY TOP RISK(S) CONFIDENCE

Forecasting/Systems

3.51. Budgetary uncertainty2. Resource constraints3. Project delivery

High

Page 9: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Consequences of not making progress toward target: BRIDGE

• Loss of flexibility in programming funds

• Must document actions that will be taken to achieve targets in next period

Page 10: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Pavement Condition Measures

Asset (unit of measure)

CurrentCondition(HPMS submittal 6/2017)

2-year targets (2020)

4-year targets (2022)

Good%

Poor%

Good%

Poor%

Good%

Poor%

Interstate Pavement(lane miles)

66.2 2.2 65.5 2.0 64.4 2.6

Non-Interstate NHS Pavement(lane miles)

37.9 8.6 36.0 6.8 31.9 7.6

• % of Interstate system in “Good” and “Poor” condition

• MAX % Poor (Interstates): 5%

• % of National Highway System in “Good” and “Poor” condition

MATURITY TOP RISK(S) CONFIDENCE

Forecasting/Systems

3.51. Budgetary uncertainty2. State of Good Repair definition is not captured well3. Declining targets need to be communicated properly High

Page 11: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Consequences of not making progress toward target: PAVEMENT

• Loss of flexibility in programming funds

• Must document actions that will be taken to achieve targets in next period

Page 12: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

System Reliability:“Level of Travel Time Reliability”

• “Normal” travel time: 50th percentile

• Longest travel time: 100th percentile

• 80th percentile travel time: Worse (longer) than 80% of travelers

• LOTTR: 80th percentile / 50th percentile

• Reliable LOTTR: 80th / 50th percentile travel time < 1.5

Page 13: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

0 5 10 15 20 25 30

Travel Tim

e Pe

rcen

tile

Travel Time, minutes

Travel Time:  Percentiles

50th percentile = 16.7 minutes, “Normal”

100thpercentile = longest travel time

80th percentile = 20.2 minutes – System Reliability

95th percentile = 23.3 minutes – Freight

Page 14: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

1.18 TTI

I-95 SOUTHBOUND OLD LYME – NEW LONDONYEAR-ROUND RELIABILITY DATA

Page 15: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

1.6+ TTI

I-95 SOUTHBOUNDOLD LYME – NEW LONDONAUGUST – SUNDAY PMRELIABILITY DATA

Page 16: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

System Reliability Measures

System (unit of measure)

CurrentCondition

2-year targets (2020)

4-year targets (2022)

Reliable%

Reliable%

Reliable%

Interstate (person-miles) 78.3 75.2 72.1

Non-Interstate NHS (person-miles) 83.6 80.0 76.4

• % person-miles of Interstate that are “reliable”

• % person-miles of non-Interstate NHS that are “reliable”

MATURITY TOP RISK(S) CONFIDENCE

Aspirational/Extrapolation

1.5

1. Reliability definition new, abstract, and may not capture individual user experience

2. Outcomes subject to external factors3. Worsening reliability has to be communicated

Low

Page 17: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

2017, 78.3

60

65

70

75

80

85

90

60

65

70

75

80

85

90

2014 2015 2016 2017 2018 2019 2020 2021

Percen

t Person‐Mile

s (or V

MT) Reliable

Percen

t Person‐Mile

s (or V

MT) Reliable

YEAR MEASURED (REPORTED FOLLOWING YEAR)

INTERSTATE System Reliability(Percent person‐miles traveled that are reliable)

INRIX (NPMRDS v2)HERE (NPMRDS v1)Conservative ProjOptimistic ProjAvg Chg ProjMMUT Proj

Page 18: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

2017, 83.6

50

55

60

65

70

75

80

85

90

50

55

60

65

70

75

80

85

90

2014 2015 2016 2017 2018 2019 2020 2021

Percen

t Person‐Mile

s (or V

MT) Reliable

Percen

t Person‐Mile

s (or V

MT) Reliable

YEAR MEASURED (REPORTED FOLLOWING YEAR)

NON‐INTERSTATE NHS System Reliability(Percent person‐miles traveled that are reliable)

INRIX (NPMRDS v2)HERE (NPMRDS v1)Conservative ProjOptimistic ProjAvg Chg ProjMMUT Proj

Page 19: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Consequences of not making progress toward target: SYSTEM RELIABILITY

• “State DOTs that fail to meet or make significant progress toward targets in a biennial performance reporting period will be required to document the actions they will undertake to achieve their targets in their next biennial performance report.”

Page 20: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Freight Movement Measure System (unit of measure)

CurrentCondition

2-year targets (2020)

4-year targets (2022)

TTTR TTTR TTTR

Interstate(Truck Travel Time Reliability Index)

1.75 1.79 1.83

• Truck Travel Time Reliability (TTTR) index

MATURITY TOP RISK(S) CONFIDENCE

Aspirational/Extrapolation

1.5

1. Measure is very abstract and may not reflect individual experience

2. Outcomes subject to external factors3. Declining reliability has to be explained and communicated

Low

Page 21: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

2017, 1.75

1

1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.8

1.9

2

2.1

1

1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.8

1.9

2

2.1

2014 2015 2016 2017 2018 2019 2020 2021

TTTR

 Inde

x

TTTR

 Inde

x

YEAR MEASURED (REPORTED FOLLOWING YEAR)

Freight MovementINTERSTATE Truck Travel Time Reliability index, TTTR ‐ 95th/50th percentile, maximum over 5 time periods in a week)

INRIX (NPMRDS v2)HERE (NPMRDS v1)Conservative ProjOptimistic ProjAvg Chg ProjMMUT Proj

Page 22: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Consequences of not making progress toward target: FREIGHT

• After a 2-year period, documentation of actions to achieve targets is required (as in system reliability).

• The next freight performance report becomes more prescriptive:• (i) An identification of significant freight system trends, needs, and issues within the State.

• (ii) A description of the freight policies and strategies that will guide the freight-related transportation investments of the State.

• (iii) An inventory of truck freight bottlenecks within the State and a description of the ways in which the State DOT is allocating funding under title 23 U.S.C. to improve those bottlenecks.

• (A) The inventory of truck freight bottlenecks shall include the route and milepost location for each identified bottleneck, roadway section inventory data reported in HPMS, Average Annual Daily Traffic (AADT), Average Annual Daily Truck Traffic (AADTT), Travel-time data and measure of delay, such as travel time reliability, or Average Truck Speeds, capacity feature causing the bottleneck or any other constraints applicable to trucks, such as geometric constrains, weight limits or steep grades.

• (B) For those facilities that are State-owned or operated, the description of the ways in which the State DOT is improving those bottlenecks shall include an identification of methods to address each bottleneck and improvement efforts planned or programed through the State Freight Plan or MPO freight plans; the Statewide Transportation Improvement Program and Transportation Improvement Program; regional or corridor level efforts; other related planning efforts; and operational and capital activities.

• (iv) A description of the actions the State DOT will undertake to achieve the target established for the Freight Reliability measure in § 490.607.

• (3) The State DOT should, within 6 months of the significant progress determination, amend its Biennial Performance Report to document the information specified in this paragraph to ensure actions are being taken to achieve targets.

Page 23: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Air quality measure:State Total Emissions Reduction

• Emissions reduction is cumulative• Achieved reductions continue to impact actual emissions as long as

improvement project is in place

• MAP-21 measure captures rate of change in emissions reduction• “First derivative” more difficult to visualize

• “Slowing growth in emissions reduction” is expressed as a negative rate of change

• Benefits are counted only on the year funds are first obligated

Page 24: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Air quality measure:State Total Emissions Reduction

• Emissions (kg)• If we reduce emissions in a project, there is always a lower quantity of pollutants in the

air because the project was built

• Emissions reduction (kg/day)• Each day that the project is in place, emissions are lower by x number of kilograms of

pollutants

• Rate of change of emissions reduction (kg/day/time)• This is the CMAQ measure: A positive number means we are reducing pollutants

faster than in a previous period

Page 25: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Emissions reduction analogyEMISSIONS  A CAR STARTING FROM ZERO TO 75 MPH

EMISSIONS: When an emissions reduction project is built, emissions (kilograms) of pollutants are reduced as the project is in place.kg2 < kg1

DISTANCE:  When the car starts and moves forward, we are always ahead of where we startedx2 > x1

EMISSIONS REDUCTION:  Each day the project is in place, x kilograms / day of pollutants continue to be reducedkg/day2 < kg/day1

SPEED:  Increases from zero until car achievescruising speed of 75 MPHWe continue position gains;  speed plateaus at 75 MPH

RATE OF CHANGE IN EMISSIONS REDUCTION:  Arewe increasing the rate of reduction in emissions (kg/day) over time?  Do we continue to build projects?

RATE OF CHANGE IN SPEED:  Acceleration increases from zero and then decreases to zero when the car maintains cruising speed of 75 MPH

Page 26: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

0

100

200

300

400

500

600

700

800

900

1000

0 2 4 6 8 10

Distran

ce from

 stan

ding

 start, feet

Time t, seconds

Zero to 75 MPH in a quick car:  DISTANCE

Distance (ft)

DISTANCE:ALWAYS AHEAD OF

WHERE WE STARTED

Page 27: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

0 1 2 3 4 5 6 7 8 9 10

Spee

d, M

PH

Time t, seconds

Zero to 75 MPH in a quick car:  SPEED

Speed (mph)

SPEED: INCREASES TO 75 MPH

Page 28: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4 5 6 7 8 9 10

Acceleratio

n, ft/sec2

Time t, seconds

0 to 75 MPH: RATE OF CHANGE IN SPEED (ACCELERATION)

Acceleration (ft/sec2)

ACCELERATION = 0 AFTER 75 MPH IS

REACHED

Page 29: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

0

100

200

300

400

500

600

700

800

900

1000

0 2 4 6 8 10

Spee

d = mph

;  acceleratio

n = ft/sec2

Distran

ce from

 stan

ding

 start, feet

Time t, seconds

Zero to 75 MPH in a quick car

Position (ft) Speed (mph) Acceleration (ft/sec2)

DISTANCE:ALWAYS AHEAD OF

WHERE WE STARTED

SPEED: INCREASES TO 75 MPH

ACCELERATION = 0 AFTER 75 MPH IS

REACHED

Page 30: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

0

100

200

300

400

500

600

700

800

900

1000

0 2 4 6 8 10

Spee

d = mph

;  acceleratio

n = ft/sec2

Distran

ce from

 stan

ding

 start, feet

Time t, seconds

Zero to 75 MPH in a quick car

Position (ft) Speed (mph) Acceleration (ft/sec2)

Page 31: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

0 1 2 3 4 5 6 7 8 9 10

Spee

d:  M

PH;  acceleratio

n = ft/sec2

Time t, seconds

Zero to 75 MPH in a quick car

Speed (mph) Acceleration (ft/sec2)

CONSTANT SPEED ‐zero acceleration

CMAQ Air quality measure is like measuring acceleration (rate of change in speed)

Page 32: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Cumulative Emissions Reductions from CMAQ-funded projects

• Reductions increase

• Rate of change slows down

PM

Total

Nox

VOC

Page 33: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

VOC – Rate of Change in Emissions Reduction due to CMAQ obligations for continuing projects

0

20

40

60

80

100

120

140

160

2010

2011

2012

2013

2014

2015

2016

2017

Emission

s Red

uctio

n (kg/da

y)

Year

Additional emissions reduction not counted in the MAP‐21 rule

Annual VOC reductions due to projects obligated in given year.

Additional reductions from2nd & 3rd years of CTfastrakthat federal guidelines donot allow to be included.

CTfastrak operatingobligations (2015)

Page 34: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

NOx – Rate of Change in Emissions Reduction due to CMAQ obligations for continuing projects

0

50

100

150

200

250

300

2010

2011

2012

2013

2014

2015

2016

2017

Emission

s Red

uctio

n (kg/da

y)

Year

Additional emissions reduction not counted in the MAP‐21 rule

Annual NOx reductions due to projects obligated in given year.

CTfastrak operatingobligations (2015)

Additional reductions from2nd & 3rd years of CTfastrakthat federal guidelines donot allow to be included.

Page 35: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

PM2.5 – Neglible rate of change in emissions reductions

0

10

20

30

40

50

60

70

2010

2011

2012

2013

2014

2015

2016

2017

Emission

s Red

uctio

n (kg/da

y)

Year

Additional emissions reduction not counted in the MAP‐21 rule

CTFastrakconstruction

obligations (2011)

Annual reductions due

to projects obligated in a

given year.

Page 36: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Air quality measure challenges

• Qualitative benefits not captured in measure

• Funding (obligation) variability

• Impact of mega-projects on measure

Page 37: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Are benefits counted?

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

% O

blig

ated

Fun

ds

Year

CMAQ Program Investment

QUALITATIVE BENEFITS (NOT counted in measure)

Year 2 & 3 operating funds to new transit projects(NOT counted in measure)

QUANTITATIVE BENEFITS (countedin measure)

Page 38: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Variability in yearly obligations

$ M

$10 M

$20 M

$30 M

$40 M

$50 M

$60 M

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

CMAQ Obligations by year

Page 39: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Mega-projects

$ M

$10 M

$20 M

$30 M

$40 M

$50 M

$60 M

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

CMAQ Obligations by project type Travel Demand Management

Transit Improvements

Transit ‐ Fastrak

Ride Sharing

Public Education & Outreach Activities

Congestion Reduction and Traffic FlowImprovements

Bicycle and Pedestrian Facilities andPrograms

Alternative Fuels and Vehicles

STP/CMAQ

Transit -Fastrak

Page 40: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Megaprojects

0

10

20

30

40

50

60

70

2010 2011 2012 2013 2014 2015 2016 2017

Redu

ctio

n (k

g/da

y)

Year

PM2.5 Reduction by Project type(Impact of CT Fastrak investment)

Alternative Fuels and Vehicles

Bicycle and PedestrianFacilities and ProgramsCongestion Reduction andTraffic Flow ImprovementsPublic Education & OutreachActivitiesRide Sharing

STP/CMAQ

Transit - Fastrak

All other Transit Improvements

Travel Demand Management

Page 41: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

4‐year target, 2021, 30.140

2‐year target, 2019, 19.320

0

50

100

150

200

250

300

350

400

450

500

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

Emission

s Red

uctio

n (kg/da

y)

Year

VOC ‐ 2‐year cumulative and 4‐year cumulative targets for Total Emissions Reduction Measure

VOC 4‐year target

VOC 2‐year target

VOC Projected 1‐year

CTFastrakoperations

4-yr cumulative

1-yr actual & projected

2-yr cumulative

Page 42: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

2‐year target, 2019, 67.690

4‐year target, 2021, 102.370

0

100

200

300

400

500

600

700

800

900

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

Emission

s Red

uctio

n (kg/da

y)

Year

NOx ‐ 2‐year cumulative & 4‐year cumulative targetsfor total emissions reduction measure

NOx Projected 1‐year

NOx 2‐year target

NOx 4‐year target

4‐yr cumulative

1‐yr actual & projected

2‐yr cumulative

CTFastrakoperations

Page 43: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

4‐year target, 2021, 2.674

2‐year target, 2019, 1.632

0

10

20

30

40

50

60

70

80

90

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

Emission

s Red

uctio

n (kg/da

y)

Year

PM2.5 ‐ 2‐year cumulative & 4‐year cumulative targetsfor total emissions reduction measure

PM2.5 4‐year target

PM2.5 2‐year target

PM2.5 Projected 1‐year

4‐yr cumulative

1‐yr actual & projected

2‐yr cumulative

CTFastrakconstruction

CTFastrakoperations

Page 44: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Air Quality MeasureEmissions

Component

Current Measurements(CMAQ Public Access as of 2017)

2-year targets (2020)

4-year targets (2022)

2-yearcumulative

kg/day

4-yearcumulative

kg/day

2-year cumulative

kg/day

4-year cumulative

kg/day

VOC 10.820 263.890 19.320 30.140

NOx 34.680 462.490 67.690 102.370

PM2.5 1.040 12.950 1.632 2.674

• Total Emissions Reduction

• From projects entered into the CMAQ Public Access system in previous year

MATURITY TOP RISK(S) CONFIDENCE

Extrapolation

Level 21. Qualitative benefits are not captured in measure2. Given program priorities, quantifiable benefits may

appear low with respect to other agencies

Moderate

Page 45: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Air Quality MeasureEmissions

Component

Current Measurements(CMAQ Public Access as of 2017)

2-year targets (2020)

4-year targets (2022)

2-yearcumulative

kg/day

4-yearcumulative

kg/day

2-year cumulative

kg/day

4-year cumulative

kg/day

VOC 10.820 263.890 19.320 30.140

NOx 34.680 462.490 67.690 102.370

PM2.5 1.040 12.950 1.632 2.674

• Total Emissions Reduction

• From projects entered into the CMAQ Public Access system in previous year

MATURITY TOP RISK(S) CONFIDENCE

Extrapolation

Level 21. Qualitative benefits are not captured in measure2. Given program priorities, quantifiable benefits may

appear low with respect to other agencies

Moderate

14.360 25.180

50.160 84.840

1.111 2.153

Page 46: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

Consequences of not making progress toward target:

AIR QUALITY• Document the actions state will undertake to

achieve its targets in their next biennial performance report.

Page 47: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

System Reliability Findings

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Non‐Int. NHS

Interstate System

Axis Title

Statewide Level of Travel Time ReliabilityBased on Vehicle‐Miles Traveled

Non‐Reliable

Reliable

Page 48: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

System Reliability Findings

0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 12,000,000

Capital Region COGGreater Bridgeport / Valley MPO

Housatonic Valley MPOLower Connecticut River Valley MPO

Naugatuck Valley Council of GovernmentsSouth Central Regional COG

South Western MPOSoutheastern Connecticut COG

Not in MPO

Vehicle Miles Traveled / Day

Level of Travel Time Reliability (Interstate System)Based on Vehicle‐Miles Traveled

Interstate Non‐Reliable Interstate Reliable

Page 49: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

System Reliability Findings

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Capital Region COG

Greater Bridgeport / Valley MPO

Housatonic Valley MPO

Lower Connecticut River Valley MPO

Naugatuck Valley Council of Governments

South Central Regional COG

South Western MPO

Southeastern Connecticut COG

Not in MPO

% VMT

System Performance Measure (% Reliable), Interstate SystemBased on Vehicle‐Miles Traveled

Interstate Non‐Reliable Interstate Reliable

Likely lowest MPO Interstate reliability in US

Page 50: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

System Reliability Findings

0 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000 9,000,000 10,000,000

Capital Region COGGreater Bridgeport / Valley MPO

Housatonic Valley MPOLower Connecticut River Valley MPO

Naugatuck Valley Council of GovernmentsSouth Central Regional COG

South Western MPOSoutheastern Connecticut COG

Not in MPO

Vehicle Miles Traveled / Day

Level of Travel Time Reliability (Non‐Interstate NHS)Based on Vehicle‐Miles Traveled

Non‐Int. NHS Non‐Reliable Non‐Int. NHS Reliable

Page 51: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

System Reliability Findings

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Capital Region COGGreater Bridgeport / Valley MPO

Housatonic Valley MPOLower Connecticut River Valley MPO

Naugatuck Valley Council of GovernmentsSouth Central Regional COG

South Western MPOSoutheastern Connecticut COG

Not in MPO

% VMT

System Performance Measure (% Reliable), Non‐Int. NHSBased on Vehicle‐Miles Traveled

Non‐Int. NHS Non‐Reliable Non‐Int. NHS Reliable

Page 52: National Performance Measures: Initial target-setting€¦ · National Performance Measures: Initial target-setting Performance Management Connecticut Department of Transportation.

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

Capital Region COGGreater Bridgeport / Valley MPO

Housatonic Valley MPOLower Connecticut River Valley MPO

Naugatuck Valley Council of GovernmentsSouth Central Regional COG

South Western MPOSoutheastern Connecticut COG

Not in MPOStatewide

Highest 95/50 percentile Travel Time Ratio of 5 time periods

Truck Travel Time ReliabilityWeekday { 6‐10AM, 10AM‐4PM, 4‐8PM }

Weekend { 6AM‐8PM, 8PM‐6AM }

Freight Findings