Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

37
Gas Separation system Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014

Transcript of Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Page 1: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Gas Separation system Name: Hussain Abbas Qassim Ashoor

ID: 20090222Supervisor: David Krause

Senior Project 2014

Page 2: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Index

• Project objectives

• Introduction

• Tasks reviews

• Gantt Chart

• Difficulties and recommendations

Page 3: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Project objectives

Making a prototype to demonstrate a separation

system plant.

Implementing what was learned

Designing a PCB circuit

Write a PLC code program and Mbed

Page 4: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Introduction

• The project idea

• Company conflicts

• Improving the project idea

Page 5: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

The project idea

Page 6: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

PFD (Process Flow Diagram)

Page 7: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Oil Well Pump

Oil Well Pump is a part of the gas separation system and operated by Tatweer Petroleum.

Page 8: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Separation system plant

Where the gas separates from oil and sent to stores.

Page 9: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Stores Here were stores the oil and gas to be deliver to the Companies

Banagas StoreBapco

Store

Page 10: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Boiler

Boiling the un wanted water

Page 11: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Company conflicts

PLC used in the Company is Rslogix 500

There are no budget

Limited equipment

No workshop in the Company for students

Page 12: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Improving the project idea

• Simulation

• Mbed program

• Ultrasonic sensor, Temperature sensor, Level sensors and

Gas sensor

• Control panel and SCADA program.

Page 13: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Tasks Reviews

Page 14: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Planning• Solid worksDesigning any mechanical part

•Ms VisioDesigning the PFD process flow diagram

• MS projectDoing the Gantt chart (what to do)

•Ms Power PointDesigning the Control Panel

Page 15: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Boiler TankDesigned at Solid Works

Built in Building 34

Page 16: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Ventilation 3D Concept

Page 17: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Control Panel

25 %

Page 18: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Building (Fabrication)

Page 19: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Building (Fabrication)

Page 20: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Building (Fabrication)

Page 21: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

7-segment circuit

Page 22: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Mbed, Comparator and switch regulator Circuit

Page 23: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

PCB

Page 24: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Relay Circuit and PCB

Page 25: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

PCB before soldering

Page 26: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

PCB soldered

Page 27: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Relay PCB in the project

Page 28: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Ultrasonic SensorConnection and teaching mode

Page 29: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

ProgrammingPLC Program (RSlogix5000)

Mbed Program (Micro Controller)

Factory Talk View (SCADA)

Page 30: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Separation System Block Diagram

Control Panel

SCADA

Fans

Pumps

LCD

Level Sensor

Ultrasonic Sensor

Temperature Sensor

7-segment

Buzzer

PLC

Mbed

Page 31: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Mbed

Page 32: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

SCADA   Stands for (Supervisory Control and Data Acquisition) 

Page 33: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Gantt Chart MS Project

Page 34: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Old Gantt Chart

Page 35: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

New Gantt Chart

Page 36: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Difficulties

Recommendation

•The company conflicts

•Building the project on my own budget

•Ultrasonic sensor

•Using better PLC module which could produce more than 205mA

•Adding various sensors such as (pressure sensor and flow meter),

also use better equipment to make the project with high quality

Page 37: Name: Hussain Abbas Qassim Ashoor ID: 20090222 Supervisor: David Krause Senior Project 2014.

Demonstration