MSU Design Day Presentation
-
Upload
michael-jones -
Category
Documents
-
view
115 -
download
0
Transcript of MSU Design Day Presentation
Global Supply ManagementGlobal Supply Management
Members: Samantha Caves, Nicole Clark, Michael Jones, Michael Keller, Hali MacMillan, Nicholas Schulte
Alternative Supply Line Design for Intel’s Assembly Test Factory Network
Global Supply Management
Intel’s Vision
“If it is smart and connected, it is best with Intel.”
Global Supply Management
Intel’s Mission
“Utilize the power of Moore’s Law to bring smart, connected devices to every person on Earth.”
Global Supply Management
Executing Moore’s Law
“Enabling new devices with higher functionality and complexity while controlling power, cost,
and size”
Global Supply Management
Introduction● Computers and processors are vital to Intel and nearly
all of our daily liveso Keeping these in proper working order is critical
● What are heat spreaders?● Sustainable options
Global Supply Management
Problem Details● Heat spreaders manufactured from C101 Copper Alloy● Goal:
o Determine alternative material Meets mechanical properties and cost effective
o Determine supplier selection and sourcing● Necessary to understand the specs and manufacturing
process
Global Supply Management
C101 Copper● Electrically refined copper alloy
o Contains less than .001 % oxygen● High thermal conductivity and coefficient of thermal
expansion (CTE)o 390 - 400 W/mK and 16 - 17 ppm/C
● Worldwide availability ● Stamping makes it cost effective to manufacture● Commonly used in electronics
Global Supply Management
Project Scope● Separated the project into two parts:
o Material research and selectiono Material sourcing, supplier selection, manufacturing process
● Focus on increasing heat efficiency of Integrated Heat Spreader (IHS) and lowering cost
Global Supply Management
Material Specific Criteria● Thermal conductivity (W/mK)● Coefficient of thermal expansion, CTE (ppm/C)● Dimensions (32mm x 34mm)● Surface finish (nickel plating/alternative technique)● Material manufacturing (conflict free)
o Conflict Minerals- Minerals that come from the Democratic Republic of Congo (DRC), where the profits of these minerals fund violence committed by the rebel groups
● Cost● Availability of material
Global Supply Management
Initial Material Research● CuB-42MBD4(120/140)(70/80)● CuMo● Aluminum Nitride ● Copper-Tungsten Alloy● Tungsten Carbide● Al-Diamond ● CarbAl ● Cubic Boron Arsenide
● Silicon Carbide● Dymalloy● Silver Diamond● Cubic Boron Arsenide
● Copper Graphite● Natural Graphite● Aluminum Graphite● Aluminum Silicon Carbide
Thermal conductivity
and dimensions
Research Criteria:
Global Supply Management
Short List● CarbAl● Copper Graphite● Aluminum Graphite● CuB - 42MBD4 (120/140)
(70/80)● Silicon Carbide (C6H)● Aluminum Diamond
Research Criteria:
Minimum dimensions,
surface finish, location and availability of material, cost
Global Supply Management
Copper Graphite
Material Name
Thermal Conductivity
(W/mK)
CTE (ppm/C) Minimum Material
Dimensions (32 mm by 34
mm)
Surface Plating
Material Production(location)
Cost/Yield Notes:
C101 Copper 390-400 16-17 Yes Nickel Plated South East Asia Cheap/High Yield
Current material for heat
spreader
Copper Graphite(GR-CU)
265-300 4-7 No Nickel Plated North America Expensive/Low Yield
Adding graphite makes the
manufacturing process more
intense
Global Supply Management
CuB-42MBD4(120/140)(70/80)Material Name
Thermal Conductivity
(W/mK)
CTE (ppm/C) Minimum Material
Dimensions (32 mm by 34
mm)
Surface Plating
Material Production(location)
Cost/Yield Notes:
C101 Copper 390-400 16-17 Yes Nickel Plated South East Asia Cheap/High Yield
Current material for heat
spreader
CuB- 42MBD4 (120/140)(70/80)
520-598 10.1/12.4 N/A N/A Dresden, Germany
Expensive/ Low Yield
Due to this material
containing synthetic
diamonds it is very expensive
Global Supply Management
Aluminum Diamond
Material Name Thermal Conductivity
(W/mK)
CTE (ppm/C)
Minimum Material
Dimensions (32 mm by
34 mm)
Surface Plating
Material Production(location)
Cost/Yield Notes:
C101 Copper 390-400 16-17 Yes Nickel Plated
South East Asia
Cheap/High Yield
Current material for heat spreader
Aluminum Diamond 500 6.1-7.9 Yes Nickel Plated
EuropeNorth
America
Expensive/ Low Yield
Diamond is very expensive and hard to
work with
Global Supply Management
Top Three Materials● CarbAl
o Applied Nanotech, Inc.● Aluminum Graphite
o Mersen
o Schunk Hoffman
o MMCC
o Bracalente
● Silicon Carbide (C6H)o Genesico BayCarbono Stanford Advanced Materialso II-VI Incorporatedo Dow Corningo Nitride Crystals Groupo SiCrystal AGo TanKeBlue Ltd.
Global Supply Management
CarbAl
Material Name
Thermal Conductivity
(W/mK)
CTE (ppm/C) Minimum Material
Dimensions
Surface Plating
Material Production(location)
Cost/Yield Notes:
C101 Copper 390-400 16-17 Yes Nickel Plated South East Asia Cheap/High Yield
Current material for heat
spreader
CarbAl 350 2 No Nickel Plated Austin, Texas
Applied Nanotech
Cheap/Low Yield Can be inlayed and plated in copper and is
currently being looked at by
NASA for heat sink applications
Global Supply Management
Aluminum Graphite
Material Name
Thermal Conductivity
(W/mK)
CTE (ppm/C) Minimum Material
Dimensions
Surface Plating
Material Production(location)
Cost/Yield Notes:
C101 Copper 390-400 16-17 Yes Nickel Plated South East Asia
Cheap/High Yield
Current material for heat spreader
AlGrp(Range is 10-90% graphite)
324-783 Matched: Parallel (16.9-
2.5)Perpendicular
(15.2-10.1)
No Nickel Plated Worldwide
MMCC
Mersen
Expensive/Low Yield
Further research suggests that the manufacturing process is not
readily available
Global Supply Management
Final Material - Silicon Carbide
Material Name
Thermal Conductivity
(W/mK)
CTE (ppm/C) Minimum Material
Dimensions
Surface Plating
Material Production(location)
Cost/Yield Notes:
C101 Copper 390-400 16-17 Yes Nickel Plated South East Asia
Cheap/High Yield
Current material for heat spreader
Silicon Carbide
360-490 1.2-7.9 Yes Nickel Plated Worldwide
Dow Corning
Stanford Advanced Materials
Cheap/High Yield
Available worldwide and
meets all requirements for
alternative material
Silicon Carbide Process Flow - Dow CorningCrystal Growth
Epi Polish
Stock Polish
Wafer Shaping
Wafer Slicing
Ingot Shaping Epi Growth
Clean/Package
Final Polish
Clean/Package
M
CMetrology Steps
Cleaning Steps
M
M
M
M
M
M
M
M
C
C
C
C
C
C
Seed Surface Prep
Seed Slicing
Seed Ingot Shaping
M
M
M
M C
C
Global Supply Management
Stanford Advanced Materials-SiC Process Flow-
Global Supply Management
Cost
● Stanford quoted $11 per unito Quantity of 50,000 pieces
● Dow Corning has no bido Would need a secondary company
to diamond machine● Alternate materials meeting
performance requirements are higher cost than stamped copper
Global Supply Management
Major Challenges● Finding suppliers of high grade SiC● Working with manufacturers● Complex manufacturing/machining process
o Competitive cost● Issues with procuring a sample● Integrated package performance due to CTE of IHS● Meeting strict design criteria
Global Supply Management
Conclusion● Many materials with novel properties meeting requirement
o Continue monitoring CarbAl and AlGrp ● Silicon Carbide
o Viable option for large complex operationso More sustainable than Copper and Goldo Very strong, low density materialo Uniform structure, most reliable in long runo High thermal conductivity capabilitieso Can be Nickel plated
Same laser etching process
Global Supply Management
A special thanks to our Intel sponsors, Sabina Houle and Mark Norwil!
Thank you Intel!
Global Supply Management