MSS Installation.pdf
Transcript of MSS Installation.pdf
-
7/29/2019 MSS Installation.pdf
1/12
MSS Hardware Installation Quick Reference Guide
MSS Hardware Installation QuickReference Guide
Release M14.0
-
7/29/2019 MSS Installation.pdf
2/12
The information in this document is subject to change without notice and describes only theproduct defined in the introduction of this documentation. This document is not an officialcustomer document and Nokia Siemens Networks does not take responsibility for any errorsor omissions in this document. This document is intended for the use of Nokia Siemens
Networks customers only for the purposes of the agreement under which the document issubmitted. No part of this documentation may be used, reproduced, modified or transmitted inany form or means without the prior written permission of Nokia Siemens Networks. Thedocumentation has been prepared to be used by professional and properly trained personnel,and the customer assumes full responsibility when using it. Nokia Siemens Networkswelcomes customer comments as part of the process of continuous development andimprovement of the documentation.
The information or statements given in this documentation concerning the suitability, capacityor performance of the mentioned hardware or software products are given as is and allliability arising in connection with such hardware or software products shall be definedconclusively and finally in a separate agreement between Nokia Siemens Networks and thecustomer.
IN NO EVENT WILL Nokia Siemens Networks BE LIABLE FOR ERRORS IN THISDOCUMENTATION OR FOR ANY DAMAGES, INCLUDING BUT NOT LIMITED TOSPECIAL, DIRECT, INDIRECT, INCIDENTAL OR CONSEQUENTIAL OR ANY LOSSESSUCH AS BUT NOT LIMITED TO LOSS OF PROFIT, REVENUE, BUSINESS
INTERRUPTION, BUSINESS OPPORTUNITY OR DATA, that might arise from the use of thisdocument or the information in it.
THE CONTENTS OF THIS DOCUMENT ARE PROVIDED "AS IS". EXCEPT AS REQUIREDBY APPLICABLE MANDATORY LAW, NO WARRANTIES OF ANY KIND, EITHEREXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIESOF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NON-INFRINGEMENT, ARE MADE IN RELATION TO THE ACCURACY, RELIABILITY ORCONTENTS OF THIS DOCUMENT. NOKIA SIEMENS NETWORKS RESERVES THE RIGHTTO REVISE THIS DOCUMENT OR WITHDRAW IT AT ANY TIME WITHOUT PRIORNOTICE.
This document and the product it describes are considered protected by copyrights and otherintellectual property rights according to the applicable laws.
The wave logo is a trademark of Nokia Siemens Networks Oy. Nokia is a registered trademarkof Nokia Corporation. Siemens is a registered trademark of Siemens AG.
Other product names mentioned in this document may be trademarks of their respective
owners, and they are mentioned for identification purposes only.
Copyright Nokia Siemens Networks 2009. All rights reserved.
-
7/29/2019 MSS Installation.pdf
3/12
MSS Hardware Installation Quick Reference Guide
MSS Hardware Installation Quick Reference Guide
This quick reference guide is an accompanying document to theinstallation manual. The instructions in the installation manual arecomplete and must be followed. Read the installation manual carefullybefore installing MSS hardware.
WARNING
For safety reasons, installation personnel must be familiar with andcompetent in the use of the installation tools.
WARNING
The cabinets are heavy. Moving, lifting, and lining a cabinet, if thecabinet is already assembled, require at least two persons.
Note
Any modifications not expressly authorised by Nokia Siemens Networkscould void the user's authority to operate this system.
Installation steps
1. Check the equipment delivery contents and condition. Note thatthe equipment packaging contains information on the parts andtheir installation positions.
2. Install the cabinets on feet or on floor rails.
3. Attach the cabinets together.
4. Connect the grounding.
5. Connect the power supply to group jumpers.
6. Install the roof panels and route the cabinet power supply cabling.
7. Install the plug-in units (if not already equipped).
8. Connect the internal and external cabling (see Intercabinet CableLists for M14.0 MSS).
9. Mount the cabinet doors.
10. Fill in the required forms and clean the site.
-
7/29/2019 MSS Installation.pdf
4/12
Tools needed for installation
Pocket tape measure 3 m
Knife
Cable stripper and coaxial cable stripper (optional)
Hexagonal ball head driver 5 mm
Allen key set, ball head 9 pcs 1.5-10 mm
Screwdriver set
Side cutters
Torx TC20 and TX25
Multimeter 23
Crimping tool Crimpex DCC 0908 (optional)
Connection tool LSA plus (optional)
Drill (optional)
Grounding wrist belt
Antistatic bed
10 mm socket wrench
Work light (optional)
In addition, 1.5 m (5 ft) high safety ladders are needed at the site.
-
7/29/2019 MSS Installation.pdf
5/12
MSS Hardware Installation Quick Reference Guide
Cabinet dimensions
600 mm
Max2000 mm
1950 mm
900 mm
Front
Back
Cabling hole, bottom view
300 mm
170 mm
260 mm
-
7/29/2019 MSS Installation.pdf
6/12
Install the cabinets on feet (A) or on floor rails (B).
CABINET
FLOOR
ca. 5 mm (0.2")RAIL
WRENCH GAP50 mm (2")
RACK FRAME
INITIALINSTALLATION
HEIGHT50 mm (2")
ADJUSTMENTRANGE
+/- 20 mm(+/- 0.8")
TURN TO ADJUST
A
B
- Hammer Drill- Vacuum Cleaner- Bolts- Wedge anchors
1
2
3
HEX BOLT -M10 x 40(4 pcs)
WASHER -10,5 mm(4 pcs)
1
2
3
CABINET
-
7/29/2019 MSS Installation.pdf
7/12
MSS Hardware Installation Quick Reference Guide
Attach the cabinets together
ADJUST T090 - DEGREE ANGLE
ADJUST T090 - DEGREE ANGLE
.
.
ALIGN LEVEL WITHPREVIOUS CABINET
M4 x 8 (14 pcs)
8 10 mmHEX BOLT(6 pcs)
REAR SIDEOF CABINET
REAR SIDEOF CABINET
M4 x 8 (14 pcs)
SideCableConduit
Support
Optional
2
1. Align the cabinets together in level.Attach the cabinets together with bolts.
2. Install the side cable conduit if used. The optionalcabling cabinet is preinstalled at the factory.
-
7/29/2019 MSS Installation.pdf
8/12
Ground the cabinet
Grounding
ALLEN KEY
TO PREVIOUS CABINET TO NEXT CABINET
TO PREVIOUS ROW
TO NEXT ROW
TO SITEGROUND (ONLYONE PERNETWORKELEMENT)
REAR SIDE OF CABINET
1
2
3
1. Connect the grounding cables to thecabinet either from top or from bottom.
2. Connect the branch grounding cables to the cabinets and the row grounding cable.
-
7/29/2019 MSS Installation.pdf
9/12
MSS Hardware Installation Quick Reference Guide
Connect the power supply to group jumpers
WARNING
Danger of hazardous voltages and electric shock! Before connecting orremoving any power supply cables to or from the power distribution unit,make sure that both site power feeds to the power distribution unit areoff, the circuit breakers on the front panel of the power distribution unitare in the OFF position, and the equipment is properly earthed(grounded).
See the installation manual for information on power supply with four power supply lines.
-
7/29/2019 MSS Installation.pdf
10/12
Install the plug-in units (optional)
WARNING
Plug-in units are very sensitive to rough treatment. Handle plug-in unitswith care during installation.
WARNING
Electrostatic discharge (ESD) may damage components in the plug-inunits or other units. Wear an ESD wrist strap or use a correspondingmethod when handling the units, and do not touch the connectorsurfaces.
1. Register the bar codes of the plug-in units.
3. Install the plug-in units. See the packing list to check the plug-in units included in the delivery.
2. Verify the jumper settings according to the jumper settings manual.
-
7/29/2019 MSS Installation.pdf
11/12
MSS Hardware Installation Quick Reference Guide
Route the internal and external cabling
REAR SIDE
5
4
3
2
1
14AC
0
PDFU-B0
PDFU-B1
AIR GUIDE
FTRB-A 1 FTRB-A 0
AIR GUIDE
LA
NU
LASWC-A
CL
SU
CLOC-B
CL
BU
CLAC-B
246LA
NU
LASWC-A
CPBP 0
CPEA 1
CPRS-A 2
CPRS-A 3
CPLAN-A 4
CPLAN-A 5
CPLAN-A 6
CPBP 7
CPBP 8
CPBP 9
CPBP 10
CCC
FTRB-A 3 FTRB-A 2
0369
CC4C-BCC4C-BDC4C-BDC4C-B
0
0
MC2C-A
6
MC2C-A
SD
CHU
SU
CHU
STU1
VLRU
SD
CHU
SD
CHU/SU
CHU
STU
0
VLRU
0
MC2C-A
6
MC2C-A
BDCU1
BDCU0
SUSUSU
OMU 1 OMU 0
SUSUSUSUSU
CMU
1
SU
CMU
1
CMU
0
SD0OMU
CM
M0
CM
M1
DC3C-B
8
14BC 0
FTRB-A 0 FTRB-A 1
FTRB-A 2 FTRB-A 3
PDFU-B0
PDFU-B1
AIR GUIDE
AIR GUIDE
BDCU
2
DC3C-B
CLBU
4,5
CLAC-B
CLBU
2,3
CLAC-B
LANU
2
LASWC-A
LANU
3
LASWC-A
VLRU
1-0
VLRU
2-0
CHU
1-0
SD
CHU/*SU
CHU
0HD
MC2C-A
VLRU
1-1
VLRU
2-1
CHU
1-1
CHU
1HD
MC2C-A
*SU
*SU
*SU
*SU
MC2C-A
*SU
*SU
*SU
MC2C-A
*SU
*SU
*SU
MC2C-A
*SU
*SU
*SU
MC2C-A
1B14AC MSC Server
PDFU-B0
PDFU-B1
FTRB-A 0 FTRB-A 1
FTRB-A 2 FTRB-A 3
AIR GUIDE
AIR GUIDE
LANU
0
LASWC-A
LANU
1
LASWC-A
CLSU
0,1
CLOC-B
CLBU
0,1
CLAC-B
OMU 0+HD
CC4C-B
OMU 1+HD
CC4C-B
*SU
*SU
*SU
*SU
*SU
MC2C-A
*SU
*SU
B
DCU
1
*SU
B
DCU
0
MC2C-A
VLRU
0-0
STU
0
CHU
0-0
SD
CHU/*SU
CHU
0HD
MC2C-A
VLRU
0-1
STU
1
CHU
0-1
CHU
1HD
MC2C-A
*SU
0
1
2
3
4
5
6
8
9
10
7
CCC
CPBP
CPEA
CPRS-A
CPRS-A
CPLAN-A
CPLAN-A
CPLAN-A
CPBP
CPBP
CPBP
CPBP
1A
CMM0
CMM1
DC3C-B
DC4C-B
CMU
1
*SU
DC4C-B
SD
OMU
CMU
0
*SU
*SU
*SU
*SU
*SU
*SU
*SU
*SU
*SU
*SU
Empty
FRONT SIDE
1. Connect the internal cables between cabinets according to the cable lists.
2. Connect the external cables leaving the network element according to thesite cabling plan.
-
7/29/2019 MSS Installation.pdf
12/12
Mount the cabinet doors.
Rear sideDoor grounding cable
A
A
B
B
Front sideDoor grounding cable
Fill in the required forms and clean the site.
1. Verify against the check list that you have completed all the
necessary steps for the installation.2. Clean the site.3. Make sure that the packing material is taken care of and recycled
according to the local regulations.4. Fill in the Installation work checklist and Certification of Completion.
Installation workchecklist
Certificate ofcompletion