Transcript of MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden...
![Page 1: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/1.jpg)
MPSR ESA- 1 UCB, Oct 26, 2006
THEMIS MISSION
PRE-SHIP REVIEW
ESAC. Carlson, M. Ludlam, J. McFadden
University of California - Berkeley
![Page 2: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/2.jpg)
MPSR ESA- 2 UCB, Oct 26, 2006
Overview
• Instrument Status
• Problem Failure Reports
• Calibration Data
Overview
![Page 3: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/3.jpg)
MPSR ESA- 3 UCB, Oct 26, 2006
Instrument Status
• All ESA instruments are fully functional
• There are no outstanding issues or problems for the ESA.
• ESA survived the environmental tests and is ready for launch.
![Page 4: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/4.jpg)
MPSR ESA- 4 UCB, Oct 26, 2006
Problem Failure Reports
4 PFR’s raised since last review – all are GSE/script/commanding related – i.e. not instrument related.
PFR 212 – Radiation source not correctly installed during F3/F4 Probe Thermal Vacuum.
Source was installed the wrong way round. ESA HV check out was still possible without the source. Problem was corrected for the F5/F1 Thermal Vacuum test. CLOSED.
PFR 213 – No 459 (Electron Burst Rate) Data being received during functional test whilst in Thermal Vacuum.
Tracked down to a script error. Script corrected and re-run and verified that 459 was received. CLOSED.
PFR 214 – Readback problem with MCP Housekeeping. At nominal setting the MCP HV supply incorrectly read full scale.
Traced to a problem in the ITOS database calibration for this value. CLOSED.
PFR 220 – Energy tables not written correctly.
During the uploading of the tables there were some commanding issues with the probe. The script was re-run from the beginning and problem was corrected. Tables were not reloaded for a full thermal vacuum cycle and no data corruption was seen. CLOSED.
All previous ESA PFRs closed.
![Page 5: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/5.jpg)
MPSR ESA- 5 UCB, Oct 26, 2006
ESA Energy-Angle Calibration
![Page 6: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/6.jpg)
MPSR ESA- 6 UCB, Oct 26, 2006
ESA Energy-Angle Calibration
![Page 7: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/7.jpg)
MPSR ESA- 7 UCB, Oct 26, 2006
ESA Concentricity Test
![Page 8: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/8.jpg)
MPSR ESA- 8 UCB, Oct 26, 2006
ESA Geometric Factor test
![Page 9: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/9.jpg)
MPSR ESA- 9 UCB, Oct 26, 2006
ESA MCP test
![Page 10: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/10.jpg)
MPSR ESA- 10 UCB, Oct 26, 2006
ESA Sweep Calibration
![Page 11: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/11.jpg)
MPSR ESA- 11 UCB, Oct 26, 2006
eESA LPT at JPL
![Page 12: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/12.jpg)
MPSR ESA- 12 UCB, Oct 26, 2006
iESA LPT at JPL
![Page 13: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/13.jpg)
MPSR ESA- 13 UCB, Oct 26, 2006
PFR 220 Data
![Page 14: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/14.jpg)
MPSR ESA- 14 UCB, Oct 26, 2006
PFR 220 Data
![Page 15: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/15.jpg)
MPSR ESA- 15 UCB, Oct 26, 2006
iESA HV at JPL
![Page 16: MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.](https://reader033.fdocuments.us/reader033/viewer/2022052701/56649cc45503460f9498d13f/html5/thumbnails/16.jpg)
MPSR ESA- 16 UCB, Oct 26, 2006
eESA HV Ni63 at JPL