Morgan Hill Unified School District
Facilities Master Plan
FMP Committee Meeting #2
March 29, 2017
Process Overview 5 minutes
Guiding Principles 5 minutes
Visual Listening 20 minutes
Group Activity
Specialized Support Facilities
Site Walk Findings / Principal Notes 35 minutes
Common Themes 5 minutes
K8 / MS / HS Sites Charrette 45 minutes
Next Steps 5 minutes
agenda
2
zoom out | process overview
3
proposed schedule
4
3/1/17 3/29/17 4/26/17 5/31/17
4
school site
school site visits
students (asb)
principal interviews
online teacher +
staff surveys
District F
ocu
s G
ro
up
s
parent survey
community forum
district focus
elementary programs
secondary programs
special education
maintenance &
facilities
food service
technology
preschool & childcare
career technical
education (cte)
transportation
adult education
school site input
community outreach
district focus groups
board of
education
facility
master plan
committee
executive
steering
committee
5
stakeholder outreach
5
completed
october 2016
in progress
march 20th
in progress
fmpc meeting agendas
Mtg #1 – March 1st
, 2017 (6:00 – 8:00pm) – Visual Listening
FMP Process & Schedule Overview
Program Visioning Overview of Ed Specs
Visual Listening & Defining Success Group Discussion
Mtg #2 – March 29th
, 2017 (6:00 – 8:00pm) – School Site Visioning
School Site Walks Needs Assessment Findings
Secondary School Sites Charrette
Mtg #3 – April 26th
, 2017 (6:00 – 8:00pm) – Master Plan Proposals
FMP Process & Findings Review
Demographic Projections & Capacity Analysis
Draft School Site Master Plan Diagrams
Mtg #4 – May 31st
, 2017 (6:00 – 8:00pm) – Implementation Planning
Scopes of Work Categories
Total Program Cost & Potential Funding Sources
Prioritization Activity & Next Steps
6
enrich lives | guiding principles
7
8
draft guiding principles / fmpc #1 comments
8
MHUSD – LCAP mission, vision and values
10
draft guiding principles
10
The MHUSD Facilities Master Plan will…
Focus on the Success of ALL Students
• Prioritizing parity and equity across sites and programs
Look at Campuses as a Whole
• Providing safe, secure, healthy, attractive and inclusive environments
benefiting faculty and students
Establish Long and Short Term Achievable Goals
• Showing progress by providing a clear list of implementable projects
and schedule tired to funding with follow up accountability
Facilitate Transformational Changes
• Enabling forward thinking and timeless solutions which allow for
future change and continuous improvement
11
draft guiding principles
11
The MHUSD Facilities Master Plan will…
Align Spaces with District Initiatives for Learning
• Supporting a holistic 21st
Century definition of academic
excellence with collaboration, diversity of learning experiences,
college and career preparation for ALL students
Actively Outreach and Engage Stakeholders
• Keeping information out to the public easily accessible while
publicizing opportunities for input
Develop Pride in the Schools
• As hubs of the community competitive with other districts in
Silicon Valley
inter + act | visual listening activity
12
13
specialized support facilities
13
• charter school of morgan hill
• district office
• transportation yard
• nutrition / central kitchen
o ann sobrato high school
o live oak high school
• grounds department
o britton middle school
o central high school
tonight’s focus
focus groups
central kitchen
grounds department
transportation yard
visual listening activity / charter school & d.o.
14
Place a Green Dot at the spaces / buildings
that enhance the learning environment
Place a Red Dot at the spaces / buildings that
detract from the learning environment and are
in need of improvement
Discuss comments in group review
wonder
energize
share
play
imagine
explore
dream
connect
socialize
welcome inspire
believe
gather
create
collaborate
discover
learn
practice
focus
15
group review
16
Discuss Green Dots at the spaces / buildings
that enhance the learning environment
Discuss Red Dots at the spaces / buildings
that detract from the learning environment
and are in need of improvement
Identify highest site needs
17
inter+act | site walk & student ambassador meeting findings
recent stakeholder engagement / process
18
site observations
goal: assess the current condition of facilities
• online principal questionnaire
• 30 minute interview with principal
• 60-90 minute site walk
student ambassador’s engagement
goal: view facility needs from the eye of a student
• site-specific likes / dislikes exercise
notes:
• this is not a complete list of observations
• some items listed are currently in progress
site walk findings & principal notes / barrett elementary
19
observations
• fairly new facilities (2001)
• secured campus
• upgraded technology backbone
• a community collaborative school, hosting many events
and performances
wants
• update playground structures
• update in-room technology
• audio / visual improvements at mpr
• upgrades to facilities at the mpr to accommodate
performances
• improved furniture for the library to encourage kids to stay
• small group spaces for counseling / pull-out
site walk findings & principal notes / el toro elementary
20
observations
• organizationally works well with learning quad and
playground areas
• future remodel of library area is in the works (creation
of a health lab)
• ample, underutilized administration space
wants
• new roof
• front gate security
• new coat of paint at all buildings
• kinder play equipment repair
• improvements to rear corner of playfields
• appropriate toilets for k-5 sizes
• shade structure for outdoor eating area
• natural light in classrooms
site walk findings & principal notes /
jackson academy of math & music
21
observations
• recently renovated restrooms
• recent replacement of fire alarm system
• recent replacement of roofing and mechanical systems
wants
• cafeteria / cafetorium
• gymnasium
• parking / traffic flow / fencing safety / directionality
• covered walkways and other covered areas
• organization at administration
• additional counseling / student services / pull-out rooms
• science lab
• upper-grade book room
site walk findings & principal notes / los paseos elementary
22
observations
• creative solutions on classroom paint and furniture
• new shade structure at outdoor dining area
• gymnasium
wants
• tk & kindergarten restrooms and carpet
• front parking lot pick-up and drop-off
• field improvements
• outdoor visibility from administration
• extended fencing at tk/kinder play area
• playground re-organization for better utilization
site walk findings & principal notes / nordstrom elementary
23
observations
• large, active parent volunteer community
• play structures
• new shade structure at outdoor dining area
wants
• removal of portables
• drop-off improvements
• aging campus
• whole-school assembly space
• campus organization
• security cameras
24
observations
• newly remodeled administration
• new modular classrooms
• new outdoor science lab stations
wants
• larger mpr with tables for middle school students
• repair gutters
• provide path from playground to restroom
• security cameras
• worn blacktop / playground striping
• improve restrooms on san martin side
• improve garden
site walk findings & principal notes / san martin / gwinn elementary
site walk findings & principal notes / p.a. walsh elementary
25
observations
• recently expanded parking / drop-off
• recently renovated restrooms
• recently modernized classrooms
wants
• safety items (emergency systems )
• outdoor area with tables and benches
• entry way from rear parking along peak avenue to cafeteria
with school signage
• improvements to play structures and play area
• sewer utility improvements to avoid restroom flooding
• site grading improvements
site walk findings & principal notes / charter school of mh
26
observations
• new gym
• large farm
wants
• more permanent classrooms
• replacement of portables with permanent classrooms with
ample natural lighting
• restroom updates
• additional offices with privacy
• outdoor lighting
• administration / entry organization
site walk findings & principal notes / martin murphy middle
27
observations
• classroom organization
• i-center: large flexible space for interactive learning
• recently renovated gymnasium
wants
• renovation of restrooms / efficiency update
• locker room update
• finish electrical update (increase outlets / load capacity)
• wayfinding to administration
• expand and improve music / band room
• expand gymnasium to include bleacher seating
site walk findings & principal notes / ann sobrato high
28
observations
• newly renovated lecture hall
• large farm
• student parking lot
• large performing arts center
wants
• upgrading of playfields
• dirt spaces between classroom wings
• drop-off / pick-up areas
• wayfinding
• private offices for counseling services
• science rooms are spread out; little opportunity to share
material
site walk findings & principal notes / live oak high
29
observations
• newly renovated lecture hall
• large farm
• new stadium turf and press box
wants
• camera system, including at the farm
• dirt area behind girls locker room
• stadium entrance
• wayfinding / building signage
• stadium bleachers
• expansion of weight room (possibly an outdoor room)
• acoustics in large gym
site walk findings & principal notes / central high
30
observations
• newly renovated administration
• modernized classrooms
• arts, media, and entertainment room
wants
• security cameras
• full-height fences by warehouse / security
• shade structure for outdoor dining
• facilities for pe (no lockers / changing room)
site walk findings & principal notes / community adult school
31
observations
• good in-room technology
• nice layout in classroom building (old central hs building)
wants
• child care facilities
• restrooms
• space for cte classes
• parking expansion
• external lighting
site walk findings & director notes / transportation yard
32
observations
• new flooring
• newly renovated restrooms
• site owned by city
wants
• updates to driver’s lounge wanted
• kitchen
• changing room / showers
• exercise area
• exterior site lighting for at bus yard / fueling stations wanted
• security cameras wanted
site walk findings & principal notes / common themes
33
• improved parking and drop-off areas
• wayfinding
• exterior site lighting
• security cameras
• security fencing
• modernization at aging facilities
• flexible furniture & technology
34
inter+act | secondary sites charrette
secondary sites charrette / activity materials
35
site aerial
existing buildings
educational specification cut-outs
educational specification document (for reference)
district leadership resources
• facilities: Anessa Espinosa
• construction / modernization: Casino Fajardo
• CTE: Heather Nursement
FMP Committee Meeting #3 (6:00 – 8:00pm) April 26th
, 2017
FMP Process & Findings Review
Demographic Projections & Capacity Analysis
Draft School Site Master Plan Diagrams
Town Hall (6:00 – 8:00pm @ City Chambers) May 1st, 2017
FMP Process & Findings Review
Demographic Projections & Capacity Analysis
Draft School Site Master Plan Diagrams
next steps
36
creating sustainable places and spaces that enrich the lives of those who use them