Perspective View
Contract Details
PROPOSED INTERNAL PARTITION WORKS AT EXISTING 2ND & 3RD STOREY PRODUCTION AREA AT EXISTING 6-STOREY SINGLE USER FACTORY BUILDING ON LOT 2125W MK 19 -UPGRADE CLEANROOM TO CLASS 100 AT 1A2F & 1A3F FOR EWLB 8K FOR STATS CHIPPAC 5 YISHUN STEET 23, SINGAPORE 768442
Project Organisation Chart
Safety Committee Chart
Michael TanChairman
Faizal(Secretary)
Ken Toh(Member)
Kelvin Oon(Vice Chairman)
William Ng(Member)
Chaw Kok Wei(Member)
Lai Koy Soon(Member)
Steven Tan(Member)
Johnson Chin(Member)
Eugene Tan(Secretary)
RM/RA Organisation Chart
Signed Policy
Safety Plan
Annual Safety Plan: 2016
Project No: To Design & Build New Cleanroom of Class 10K, 1K & 100 at 1A3F for eWLB
Date Start:
S/N Month/ Week
Element Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4
1 Safety Policy (Review)
2 Safe Work Procedures (Review)
3 Safety Training
4 Safety Meeting
5 Incident Investigation Analysis
6 In-House Rules (Review)
7 Safety Promotion
8 ESC of Contractors
9 Safety Inspection
10 Maintenance Regime(LEW)
11 Risk Assessment Committee
12 Hazardous Substance (Review)
13 Occupational Health Programme
14 Emergency Prepardness
15 Audit
PreparedBy: _____________________ Approved By: ___________________
Name: __________________________ Name: _________________________
Designation:_____________________ Designation: ____________________
Month 12Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11
Statistics on Authority Visits
0
1
2
3
4
5
6
7
8
9
10
Nov-16 Dec-16 Jan-17 Feb-17
Authority Visit
HDB MOM NEA SCDF
Legal/Community Updates
Statistics on PTW on Site(JAN 17)
0 5 10 15 20 25 30 35 40
Hot Works
WAH
Lifting
General Permit
Permit to Work
Approved Rejected
Statistics on SWP onsite(JAN 17)
0 0.2 0.4 0.6 0.8 1 1.2
EST
KEESE
SYC
JOHNSON CHIN
PIPE WORLD
Safe Work Procedure
Approved Rejected
Statistics on FPP onsite(JAN 17)
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
EST
SYC
JOHNSON CHIN
Fall Protection Plan
Approved Rejected
Statistics of AFR & ASR
Total
Manpower
Total
Manhours
No. Of
Incident
No. Of
Occupationa
l Disease
AFRTotal
Mandays
Lost
ASR
Nov-16 1042 10420 0 0 0 0 0
Dec-16 1266 12660 0 0 0 0 0
Jan-17 831 8310 0 0 0 0 0
Feb-17
Statistics of Good Safety Practices
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
Housekeeping Barricade WAH Maintenance PPE noise pollution signage access Electrical hazard Trip & Fall
Good Practices
Nov-16 Dec-16 Jan-17
Schedule of Safety Campaign
There is no schedule for upcoming promotion campaign as yet
Statistics of EsC of Contractors
0
1
EST Hydal Tan & Eng KIV
EsC of Contractors
Nov-16 Dec-16
Inspections(SAFETY LAPSE)
0
1
2
3
4
5
6
7
8
9
Inspections
Nov-16 Dec-16 Jan-17
Maintenance Regime(JAN 17)S/N TYPE MODEL DATE DUE COMPANY
1 Power Drill *00131 1/2/2017 Keess2 Metal Bend Saw *084836 1/2/2017 Keess3 RCCB RCCB_01 1/2/2017 Keess4 Extension wire EW_01 1/2/2017 Keess5 Vaccum Cleaner *052600096 1/2/2017 Keess6 Battery Charger BC-1204A 1/2/2017 Keess7 Battery Charger BC-1204B 1/2/2017 Keess8 Circular Saw *013577 1/2/2017 Keess9 Repro Saw *00168082 1/2/2017 Keess
10 Jig Saw *003727 1/2/2017 Keess11 Hand Grinder HG_01 1/2/2017 Keess12 Vinyl Heating Tools WG_01 1/2/2017 Keess13 ELCB V026A 1/2/2017 Keess14 Vaccum Cleaner GM80 / 17049071 1/2/2017 Pipe World15 Vaccum Cleaner NILFISK / 1114253450 1/2/2017 SYC16 Chopsaw BOSCH / 303000087 1/2/2017 SYC17 Circular Saw MAKITA / 4131 1/2/2017 SYC18 Band Saw SYC BS-01 1/2/2017 SYC19 ELCB SCY SOA-01 1/2/2017 SYC
Risk Assessment(JAN 17)
0 1 2 3 4 5
EST
JOHNSON CHIN
PIPEWORLD
KEESS
SYC
Risk Assessment
Approved Rejected
Hazardous Substances(JAN 17)
S/N TYPE NAME CLASSIFICATION COMPANY
1 PAINT AS-299H FLAMMABLE & TOXIC SYC
2 PAINT KL - 5 WATER BASED FLAMMABLE & TOXIC KEESS
Occupational Health
No statistics and upcoming programs scheduled.
Emergency
No Emergency Drill has been scheduled to date.
Audit
The Internal audit was conducted on 9th Jan 2017.