Monthly Progress of FM

14
JODHPUR V Daily Pro Reporting Month:_______ Date of Visit Visited Site Purpose of Visit Problem Observed

description

send your progress in the formats

Transcript of Monthly Progress of FM

Page 1: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

Daily Progress ReportReporting Month:_____

Date of VisitVisited SitePurpose of VisitProblem Observed

Feeder Manager (M&P)

Jodhpur Discom :____________

Page 2: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

Daily Progress Report

Work carried out / Action taken at siteRemark (status of problem)

Feeder Manager (M&P)

Jodhpur Discom :____________

Page 3: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

DETAILS OF ROUTINE VISIT OF 33/11 KV SUB-STATIONProgress for the Month: Reporting Month:_____________Name of the Circle:_____

S.No.

1 2 3 4 5 6 7 8 9 10

1 0 0 0

2 0 0 0

3 0 0 0

4 0 0 0

Total 0 0 0 0 0 0 0 0

Note:-The details of new S/s added during the month and details of the same must be updated in the master database.

Feeder Manager (M&P)Jodhpur Discom :____________

Name of Sub-Division

Total Sub-

Stations as on 31.03.1

3

No. of Sub-Stations Added

Total No. of Sub-Stations

at the end of

month(3+4+5)

No. of Sub-Stations Cheched

Total checked (sum of col.7

to 8)

No. of S/s where

Log Sheet is being

maintained and

verified

Up to last Month

During the Month

Up to last

month

During the

month

Page 4: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

DETAILS OF ROUTINE TESTING / CHECKING & PREVENTIVE MAINTENANCE OF POWER TRANSFORMERS Progress for the Month:_______ Reporting Month:_____________Name of the Circle:___________

S.No.

1 2 3 4 5 6 7 8 9 10 11 12

1 0 0 0

2 0 0 0

3 0 0 0

4 0 0 0

Total 0 0 0 0 0 0 0 0 0 0

Note:-The details of new Power T/F added during the month and details of the same must be updated in the master database.

Feeder Manager (M&P)Jodhpur Discom :____________

Name of Sub-

Division

Total No. of Power

Transformers as on 31.03.13

No. of Power Transformers Added

Total No. of Power Transfoer

mers at the end of month

(3+4+5)

No. of Power Transformers

checked Total checked (sum of

col.7 & 8)

No. of Power Transformers where maintenance done

Total maintenan

ce done (sum of col.10 &

11)

Upto last Month

During the

Month

Up to last

month

During the

month

Up to last month

During the

month

Page 5: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

DETAILS OF ROUTINE TESTING / CHECKING & PREVENTIVE MAINTENANCE OF CAPACITOR BANKProgress for the Month:_____________ Reporting Month:____________Name of the Circle:__________________

S.No.Working Defective

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 0

2 0

3 0

4 0

Total 0 0 0 0 0 0 0 0 0 0

Note:-The details of new Capacitor Bank added during the month and details of the same must be updated in the master database.

Feeder Manager (M&P)Jodhpur Discom :____________

Name of Sub-Division

Total No.of

Capacitor Bank

as on 31.03.1

3

No. of Capacitor Bank Added

Total No. of

Capacitor Bank at

the end of month

(3+4+5)

No. of Capacitor

Bank checked

No. of defective Capacitor Bank put

in circuit after maintenance

Status of Capacitor Bank at the end of month

Upto last

Month

During the

Month

Up to last

month

During the

month

Up to end of

last month

During the

month2.0

MVAR1.2

MVAR2.0

MVAR1.2

MVAR

Page 6: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

DETAILS OF ROUTINE TESTING / CHECKING & PREVENTIVE MAINTENANCE OF 33 KV CIRCUIT BREAKERSProgress for the Month:_____________ Reporting Month:_____________Name of the Circle:__________________

S.No.

Working

1 2 3 4 5 6 7 8 9 10 11 12

1 0

2 0

3 0

4 0

Total 0 0 #REF! #REF! #REF! 0 #REF! 0 0 0

Note:-The details of new Circuit Breaker added during the month and details of the same must be updated in the master database.

Feeder Manager (M&P)Jodhpur Discom :____________

Name of Sub-Division

Total No. of 33 KV Circuit Breakers as on 31.03.1

3

No. of 33 KV Circuit

Breakers

Total No. of 33 KV Circuit Breakers at the end of month

(3+5+7)

No. of 33 KV Circuit Breakers

checked

No. of defective 33 KV Circuit Breakers put in circuit after

maintenance

Status of Capacitor Bank at the end of month

Added Upto last

Month

Added During

the Month

Up to last

month

During the

month

Up to end of last month

During the

month

Defective

Page 7: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

DETAILS OF ROUTINE TESTING / CHECKING & PREVENTIVE MAINTENANCE OF 11 KV CIRCUIT BREAKERSProgress for the Month:_____________ Reporting Month:_____________Name of the Circle:__________________

S.No.

Working

1 2 3 4 5 6 7 8 9 10 11 12

1 0

2 0

3 0

4 0

Total 0 0 #REF! #REF! #REF! 0 #REF! 0 0 0

Note:-The details of new Circuit Breaker added during the month and details of the same must be updated in the master database.

Feeder Manager (M&P)Jodhpur Discom :____________

Name of Sub-Division

Total No. of 11 KV Circuit Breakers as on 31.03.1

3

No. of 11 KV Circuit

Breakers

Total No. of 11 KV Circuit Breakers at the end of month

(3+5+7)

No. of 11 KV Circuit Breakers

checked

No. of defective 11 KV Circuit Breakers put in circuit after

maintenance

Status of Circuit Breakers at the end of month

Added Upto last

Month

Added During

the Month

Up to last

month

During the

month

Up to end of last month

During the

month

Defective

Page 8: Monthly Progress of FM

Jodhpur Vidyut Vitran Nigam Limited

Progress of 11kV Feeder MeteringProgress for the Month:_____________ Reporting Month:_______Name of the Circle:__________________

1 2 3 4 5 6 7 8 9 10 11

1 0 0 0

2 0 0 0

3 0 0 0

Total 0 0 0 0 0 0 0 0 0

Status of 11kV Feeder Metering

No. of Defective Feeder Metering Maintained by

CTPTs VCB

1 2 12 13 14 15 16 17 18 19 20 21 22 23 24 25

1 0 0

2 0 0

3 0 0

Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0Note:-The details of new feeders added during the month and details of metering equipments installed during the month must be updated in the master database.

Feeder Manager (M&P)Jodhpur Discom :____________

S No

Name of Sub-

Division

Total No of 11 kV Feeders as

on 31.03

.13

No of 11 kV Feeders Added

Total No.

of 11 kV

Feeders at the end of

month

(3+4+5)

Metering Equipme

nts Installed

as on 31.03.20

13

No. of New Metering

Equipments Installed

Total Metering Equipme

nts Installed

at the end of

the month

(7+8+9)

Balance for

Installation of

metering equipme

nts(6-10)

Upto last

month

During the mont

h

Upto last

month

During the mont

h

S No

Name of Sub-

Division

No. of Defective Feeder Metering

(out of col. 10) due to

No. of Healthy Feeder

Metering (out of col.10)

Replacement of CTPTs

Replacement of Meters

Repairing / Replacement of

VCB

Attending Other Problems

Upto last

month

During the mont

h

Upto last

month

During the mont

h

Upto last month

During the mont

h

Upto last

month

During the

month

Meters

Both CTPT

& Mete

r

Upto last

month

During the mont

h

Page 9: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

No. of DLMS Protocol HTTVM Installed in R-APDRP townProgress for the Month:____________ Reporting Month:_____________Name of the Circle:______________

Name of town

1 2 3 4 5 6 7 8

Feeder Manager (M&P)Jodhpur Discom :____________

Name of Circle

Total No. of Feeder

No. of Meter replaced by DLMS

Protocol Meter HTTVM pending for replacement

Reason for

pendency

No. of DLMS Meter

available at the end of

month

Up to the last

month

During the

month

Page 10: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

DETAILS OF BURNT POWER TRANSFORMERS Progress for the Month:____________ Reporting Month:_____________

Name of the Circle:______________

S.No.

1 2 3 4 5 6 12

1 0 #DIV/0!

2 0 #DIV/0!

3 0 #DIV/0!

4 0 #DIV/0!

Total 0 0 0 #DIV/0!

Feeder Manager (M&P)Jodhpur Discom :____________

Name of Sub-

Division

Total No. of Power Transfoer

mers at the end of this

month

No. of Power Transformers

Burnt Total (sum of col. 4 &

5)

Failure Rate

(6/3)*100Up to last

month

During the

month

Page 11: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

Power Control DetailsProgress for the Month:____________Name of the Circle:______________

S. No.Name of Sub-DivisName of Sub-StatName of FeedLoad Survey Per

Feeder Manager (M&P)Jodhpur Discom :____________

Page 12: Monthly Progress of FM

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

Power Control DetailsReporting Month:_____________

1-phase Supply H3-phase Supply Hrs.

Feeder Manager (M&P)Jodhpur Discom :____________