Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a...

23
Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th October 2006 UN Complex, Nairobi By Iole Issaias UN-HABITAT [email protected]
  • date post

    15-Jan-2016
  • Category

    Documents

  • view

    213
  • download

    1

Transcript of Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a...

Page 1: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Monitoring MDGs in the small urban centres of Lake Victoria

Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN

16th-18th October 2006UN Complex, Nairobi

By Iole IssaiasUN-HABITAT

[email protected]

Page 2: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Overview

1. Monitoring framework for LVWATSAN

2. Methodology for monitoring MDGs– Remote sensing and and Geographic Information System

(GIS)– Urban Inequities Survey: Community profiling and Household

Survey

3. Next steps

4. Capacity building needs for national and local monitoring?

Page 3: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

1. Monitoring framework

Objective: to monitor coverage and quality of service provision for MDG target group

“Target 10: To halve the number of people without access to safe drinking water and basic sanitation by 2015…

…Target 11: Achieve significant improvement in the lives of at least 100 million slum dwellers by 2020.

• Global monitoring of target 10 undertaken by the JMP (a joint collaboration between WHO/UNICEF).

• Global Monitoring of target 11 undertaken by UN-HABITAT.

Page 4: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

1. Establish a baseline; 2. Mapping the poor;3. Assist stakeholders in identifying needs in terms of water,

sanitation, solid waste management and drainage; 4. Ensuring investments reach the poor;5. Monitor and assess sustainability of investments; 6. Monitor and track coverage of service provision;and7. Advocacy and long term strategic planning tool for policy

makers;► Specifically, highlighting issues related to service provision in URBAN

areas.

The value of a monitoring framework?

Page 5: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

2. Methodology

UIS

Monitoring Protocol

GIS

National – Statistic offices

Local – Utility & local authority

Global – Inform JMP

& Monitoring MDGs

- Remote sensing- Urban Planning

- Water Utility Management- UrbanInfo

Page 6: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Remote sensing and GISDevelopment of Geographic information system (GIS) was

contracted awarded to the Regional Centre for Mapping Resources for Development (RCMRD) in March 2006 to develop GIS databases for all LVWATSAN towns.

GIS development strategy:- – Step one: procurement of satellite images (Quickbird 0.60m

accuracy). – Step two: digitization of images and development of GIS databases

through field verification and additional maps (cadastral, town planning, utility plans/networks etc..)

– Step three: demarcation of enumeration areas– Step four: digitize community profile results– Step five: Carry out capacity needs assessment for O&M of GIS

database and develop strategy for CB.

Page 7: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Step one: satellite images

Page 8: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Converting images to EA system

COMMON REGIONAL GRIDS – Scale 1:50,000 & 100,000 (EA Series)

TANZANIA

UGANDA

KENYA

(EA Series base map)

Page 9: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Step two: Sources of data

Processed QB-IMAGES

TOPO MAPS

CADASTRAL Plans and

Admin BND maps

EAs maps

CADASTRAL Plans and

Admin BND maps

Page 10: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Sample GIS map - Migori

Page 11: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Sample of a GIS map layout

Homa Bay

Page 12: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

DEVELOPMENT OF THE GIS DATABASE AT MCKnumber one first priority

THEME DATE COMPLETED

ITEM NUMBER

Basic geographic data:1. Define and name the boundaries (district, municipality, city, wards, sub locations, informal settlements)2. Define the existing cadastre (including index numbers, plot numbers, name of owner postal address and with linkage to the map (centric))3. Define the existing housing stock (including name of owner, postal address and with linkage to the map)

Education:4. Define and name all Schools, Non Formal Schools and Universities (including their capacity and approximate area coverage)

Engineering and planning:5. Define, classify and name all roads, existing and planned6. Define and name/index all bicycle paths and boda boda infrastructure, existing and planned7. Define and name/index all traffic light controlled crossings, existing and planned8. Define and name/index all zebra crossings, existing and planned (indicate if traffic signs are available)9. Define and name/index street crossings designed for disabled groups, existing and planned (indicate if traffic signs are available)10. Define and name/index pavements designed for disabled groups, existing and planned (indicate if traffic signs are available)11. Define and name/index street crossings patrolled by traffic police, existing and planned12. Define and name/index all speed reducing traffic bumps, existing and planned (indicate if traffic signs are available)13. Define and name all side walks and walking paths, existing and planned14. Define and name all roads, bicycle paths, walk paths15. Define all road reserves and other planned reserves16. Define and name all bus stops and routes, local and regional busses, preferably with timetable17. Define and name all major matatu stops and routes 18. Define and name all major boda boda collection points/stops 19. Define and name all major taxi collection points 20. Define and name passenger transport facilities in the harbour, preferably with timetable21. Define and name train facilities/stops, preferably with timetable 22. Define and classify all high voltage power cables, existing and planned23. Define and classify all telephone cables, existing and planned24. Define and classify all fibre optic cables, existing and planned25. Define and classify all fresh water pipes, existing and planned26. Define and classify all sewage water pipes, existing and planned27. Define and classify all drainage facilities, existing and planned28. Define and classify all pump stations for water and sewage, existing and planned29. Define and name all cemeteries, including their capacity 30. Define and name/index all fly-overs, both for motorised and non motorised transport, existing and planned

Development of

GIS database –

MDG checklist

Page 13: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Step three: demarcation of EA

Page 14: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Community profile

Page 15: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Urban Inequities Survey

Consists of 5 questionnaires:-Consists of 5 questionnaires:-1.1. Community/Cluster Profile – Community/Cluster Profile –

Enumeration AreaEnumeration Area level level 2.2. Household questionnaire – Household questionnaire – Household Household

level level 3.3. Women’s questionnaire – administered Women’s questionnaire – administered

to every women in hhto every women in hh4.4. Childs questionnaire - administered to Childs questionnaire - administered to

every child in hhevery child in hh5.5. Homeless questionnaire (NEW) Homeless questionnaire (NEW)

KENYA TANZANIA UGANDAKisii Bukoba MukonoHoma Bay Muleba BugembeMigori Geita GgabaSiaya Sengerema KyoteraBondo Tarime Masaka

Musoma Mutukua

Main partners are the three National Statistics Offices in Kenya, Uganda and Tanzania.

Towns to be surveyed:-

Tool developed by UN-HABITAT to monitor slums in human Tool developed by UN-HABITAT to monitor slums in human settlements.settlements.

Page 16: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Implementation Schedule for UIS

Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4ActivityTraining for ListingCommunity Profile and GIS KY MUT NY Gab BUG MASDev. Of Frame (listing)Sample DesignTraining and PretestFinalisation of HH questionnaireTraining of Field PersonnelFieldworkDesign of Data Entry and CSPRO TrainingData Editing and EntryData File PreparationPreparation of IndicatorsData AnalysisReport Writing

Kyotera/Mutukula Nyendo Gaba/Masaka

Month 7 Month 8 Month 9

Bugembe

Urban Inequities Survey Work Program for Kenya

Month 1 Month 2 Month 3 Month 4 Month 5 Month 6

Time frame 9 months– Training 2 weeks (translation TZ)– Community profile and listing, 5 days per town (one month including

travel) – Pre-testing of household questionnaire– Household survey, 25 days per town (5 months including travel) – Data entry and analysis, one month, running parallel to household survey – Report writing 2 weeks

Page 17: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Community Profile - Enumeration Areas

Page 18: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Cntd …

SF1

SCh

WPSW

Page 19: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Main household Survey

Water Module

• Source of drinking water

• Distance to water source

• Time to water source

• Quantity of water – at least 20 litres pppd

• Treatment of water

Sanitation module• Type of sanitation facility• Number of household sharing

facility• Location of facility from dwelling• Hand washing facility• Disposal of children’s faeces

•Sample size 1,500 households •Uses the same questions posed by MICS, DHS and WHS •Modules on:-

Household listingEducationInternal MigrationEconomic Activity (employment formal & informal) Water SanitationSolid Waste ManagementSocial capital (groups, trust, collective action, communication, crime etc…) Household Economy (income and expenditure)

Page 20: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Additional questions on:-

Water• Volume and payment of water (piped and non-piped),• Separation of vendors (tank, cart, bicycle), • Separation of time (time taken to collect water and time taken in queue),• Questions on water for drinking, bathing, cooking washing seperated• Reliability of water, perception of water quality,• Treatment of water.

Sanitation• Cost• Sanitation Technology separated between on-site and off-site• Emptying of latrines• Safety of sanitation system

= Disaggregated data for children and women

Solid Waste module

► Aim to measure USAGE i.e. affordability, convenience, safety, perceptions etc ….

Page 21: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

3. Next steps1. Digitization of household data. National Statistics offices or RCMRD?

2. Periodic monitoring of water and sanitation coverage (MDG target 10 an 11).

3. Disseminate information at Global, National and Local Level = communication strategy.

4. Transfer information and GIS to local authorities. Taylor make systems for urban planning, solid waste O&M and revenue collection.

5. Transfer GIS to water utilities and regulators. Requires build-up the GIS database to map water utility networks, use in WDM etc…

6. Creating a “mother” GIS database for each country.

Page 22: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

4. Capacity buildings needs?

• Training and creating capacity within water utilities to carry out utility mapping, operate GIS system for O&M (WDM, leakage and planning);

• Convert GIS into a simple, easy to use and affordable system for billing and revenue in water utilities and local authorities;

• Developing a methodology and capacity within a national institution to maintain “mother system”; and

• Assisting institutions to use the information. Advocacy and awareness raising.

Page 23: Monitoring MDGs in the small urban centres of Lake Victoria Presented at the Workshop to Develop a Capacity Building Framework for LVWATSAN 16 th -18 th.

Thank you for your attention!