FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 1116 April 2010 1 Dr Gethin Wyn Roberts, Chris Brown, Dr Oluropo Ogundipe Monitoring Bridges by GNSS 7 Bridges, case studies Large and small suspension bridges, one viaduct, one cable stayed bridge New tests on the Severn Suspension Bridge, antennas on cables and towers

Transcript of Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies •...

Page 1: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  1

Dr Gethin Wyn Roberts, Chris Brown, Dr Oluropo Ogundipe

Monitoring Bridges by GNSS

• 7 Bridges, case studies

• Large and small suspension bridges, one viaduct, one cable stayed bridge

• New tests on the Severn Suspension Bridge, antennas on cables and towers

Page 2: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  2

Nottingham Wilford Suspension Bridge

London Millennium Suspension Bridge

Page 3: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  3

Humber Bridge

Page 4: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  4

Forth Road Bridge

Avonmouth Viaduct

Page 5: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  5

Height Results

Seohae Grand Bridge, Korea Location: From Kyeonggi-do Pyeongtaek-si Poseoung-myun Naegi-ri To Choongcheongnam-do Dangjin-gun Songak-myun Bokwoo

Page 6: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  6

Severn Suspension Bridge

9 GNSS receivers

2 reference stations

Reference station and backup

Post Processed OTF

Page 7: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  7

Antenna locations, tower and cable

Movements location A, 40 min period

Page 8: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  8

Location B 10 mins

Location B 1 min

Page 9: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  9

Tower Longitudinal movements, 10 mins

Location A spectral analysis

Page 10: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  10

Location B spectral analysis

Tower T1 spectral analysis

Page 11: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  11

Height 4 locations 10 mins

Conclusions

• Valuable monitoring tool and technique

• Forth and Severn suffer wire breaks

• Long term monitoring?

Page 12: Monitoring Bridges by GNSS - FIG · Monitoring Bridges by GNSS • 7 Bridges, case studies • Large and small suspension bridges, one viaduct, one cable stayed bridge • New tests

FIG Congress 2010 Facing the Challenges – Building the Capacity Sydney, Australia, 11‐16 April 2010  12