MOM Mission
-
Upload
sharmaprateek553 -
Category
Education
-
view
123 -
download
0
Transcript of MOM Mission
Established in 1969, ISRO superseded the erstwhile Indian National Committee for Space Research (INCOSPAR). Headquartered in Bangalore, ISRO is under the administrative control of the Department of Space, Government of India.Since its establishment, ISRO has achieved numerous milestones. It built India's first satellite, Aryabhata, which was launched by the Soviet Union on 19 April in 1975. In 1980, Rohini became the first satellite to be placed in orbit by an Indian-made launch vehicle, SLV-3. ISRO subsequently developed two other rockets: the Polar Satellite Launch Vehicle (PSLV) for launching satellites into polar orbits and the Geosynchronous Satellite Launch Vehicle (GSLV) for placing satellites into geostationary orbits.
These rockets have launched numerous
communications satellites and earth
observation satellite. On 22 October in 2008,
Chandrayaan-1, India sent its first mission to
the Moon. Over the years, ISRO has
conducted a variety of operations for both
Indian and foreign clients. ISRO's satellite
launch capability is mostly provided by
indigenous launch vehicles and launch sites.
In 2008, ISRO successfully launched its first
lunar probe, Chandrayaan-1, while future
plans include indigenous development of
GSLV, manned space missions, further lunar
exploration, mars exploration and
interplanetary probes. ISRO has several field
installations as assets, and cooperates with
the international community as a part of
several bilateral and multilateral agreements.
5 November 2013, ISRO launched its Mars
Orbiter Mission, which is currently en route to
Mars.
The Mars Orbiter Mission (MOM), informally called Mangalyaan (Sanskrit: मङ्गलयान, "Mars-Craft"), is a Mars orbiter launched into Earth
orbit on 5 November 2013 by the Indian Space Research Organisation
(ISRO). It is expected to enter orbit around Mars on 24 September 2014.
The mission is a
"technology
demonstrator" project
aiming to develop the
technologies required
for design, planning,
management, and
operations of an
interplanetary
mission.
Mars Orbiter Mission is India's first interplanetary mission to planet Mars with an orbiter craft designed to orbit Mars in an elliptical orbit.The Mission is primarily technological mission considering the critical mission operations and stringent requirements on propulsion and other bus systems of spacecraft.
The Mars Orbiter Mission probe
lifted-off from the First Launch
Pad at Satish Dhawan Space
Centre SHAR, Sriharikota,
Andhra Pradesh, using a Polar
Satellite Launch Vehicle (PSLV)
rocket C25 at 09:08 UTC (2:38
PM IST) on 5 November 2013.
The launch window was
approximately 20 days long and
started on 28 October 2013. The
MOM probe spent about a
month in Earth orbit, where it
made a series of seven altitude-
raising orbital manoeuvres
before trans-Mars injection on
30 November 2013 (UTC).
Travelling at a speed of 1.55 km per second, Mangalyan crossed half way
to Mars on 9 April 2014.
It is India's first interplanetary mission and, if successful, ISRO would
become the fourth space agency to reach Mars, after the Soviet space
program, NASA, and European Space Agency.
The spacecraft is being currently monitored from the Spacecraft Control
Centre at ISRO Telemetry, Tracking and Command Network (ISTRAC) in
Bangalore with support from Indian Deep Space Network (IDSN) antennae
at Byalalu.
One of the main objectives of the first Indian mission to Mars is to develop the
technologies required for design, planning, management and operations of an
interplanetary mission.
Following are the major objectives of the mission:
A. Technological Objectives:
1. Design and realisation of a Mars orbiter with a capability to survive and perform
Earth bound manoeuvres, cruise phase of 300 days, Mars orbit insertion / capture,
and on-orbit phase around Mars.
2. Deep space communication, navigation, mission planning and management.
3. Incorporate autonomous features to handle contingency situations.
B. Scientific Objectives:
1. Exploration of Mars surface features, morphology, mineralogy and Martian
atmosphere by indigenous scientific instruments.
The MOM mission concept began with a feasibility study in 2010,
after the launch of lunar satellite Chandrayaan-1 in 2008. The
government of India approved the project on 3 August 2012, after
the Indian Space Research Organisation completed ₹1.25 billion
(US $21 million) of required studies for the orbiter. The total
project cost may be up to ₹4.54 billion (US $77 million). The
satellite costs ₹1.53 billion (US$26 million) and the rest of the
budget has been attributed to ground stations and relay upgrades
that will be used for other ISRO projects.
The space agency had initially planned the launch on 28 October
2013 but was postponed to 5 November 2013 following the
inability of ISRO's spacecraft tracking ships to take up pre-
determined positions due to poor weather in the Pacific Ocean.
Launch opportunities for a fuel-saving Hohmann transfer orbit
occur about every 26 months, in this case, 2016 and 2018. The
Mars Orbiter's on-orbit mission life will be between six and ten
Assembly of the PSLV-XL launch vehicle, designated C25,
started on 5 August 2013. The mounting of the five scientific
instruments was completed at ISRO Satellite Centre, Bangalore,
and the finished spacecraft was shipped to Sriharikota on 2
October 2013 for integration to the PSLV-XL launch vehicle.
The satellite's development was fast-tracked and completed in a
record 15 months. Despite the US federal government
shutdown, NASA reaffirmed on 5 October 2013 it would provide
communications and navigation support to the mission. ISRO
chairman stated in November 2013 that if the MOM and NASA's
orbiter MAVEN were successful, they would complement each
other in findings and help understand Mars better.
Some of the scientists working on the Mars Orbiter
Mission project are:
1. K. Radhakrishan – Chairman, ISRO
2. A. S. Kiran Kumar – Director, SAC
3. Mylswamy Annadurai – Programme Director, MOM
4. B. S. Chandrashekar – Director, ISTRAC
5. P. Robert – Operations Director, MOM
6. Subbiah Arunan – Project Director, MOM
7. V. Kesavaraju – Post-Launch Mission Director, MOM
8. P. Ekambaram – Operations Director, MOM
9. P. Kunhikrishnan – Launch Mission Director, PSLV-XL
10. S. K. Shivkumar – Orbiting payload Director, ISAC
11. B. Jayakumar – Launch Vehicle Director, PSLV
The lift-off mass was 1,350 kg (2,980 lb), including 852 kg
(1,878 lb) of propellant mass.
Cuboid in shape of approximately 1.5 m (4 feet 11 inches).
The spacecraft's bus is a modified I-1 K structure and propulsion
hardware configurations similar to Chandrayaan 1, India's lunar orbiter
that operated from 2008 to 2009, with specific improvements and
upgrades needed for a Mars mission.[31] The satellite structure is of
aluminium and composite fibre reinforced plastic (CFRP) sandwich
construction.
Electric power is generated by three solar array panels of 1.8 m × 1.4 m (5
ft. 11 in × 4 ft. 7 in) each (7.56 m2 (81.4 sq. ft.) total), for a maximum of 840
W generation in Martian orbit. Electricity is stored in a 36 Ah Li-ion battery.
Liquid fuel engine of 440 N thrust is used for orbit raising and insertion in
Martian orbit. The orbiter also has eight 22 N thrusters for attitude control or
orientation.
Two 230 W TWTAs and two coherent transponders. The antenna array
consists of a low-gain antenna, a medium-gain antenna and a high-gain
antenna. The High-gain antenna system is based on a single 2.2-metre
reflector illuminated by a feed at S-band. It is used to transmit and receive
the telemetry, tracking, commanding and data to and from the Indian Deep
Space Network.
LAP Lyman-Alpha Photometer 1.97 kg
MSM Methane Sensor For Mars 2.94 kg
MENCA Mars Exospheric Neutral Composition Analyser 3.56 kg
TIS Thermal Infrared Imaging Spectrometer 3.20 kg
MCC Mars Colour Camera 1.27 kg
The 15 kg (33 lb) scientific payload consists of five
instruments:
Lyman-Alpha Photometer (LAP) – a photometer that measures the relative
abundance of deuterium and hydrogen from Lyman-alpha emissions in the
upper atmosphere. Measuring the deuterium/hydrogen ratio will allow an
estimation of the amount of water loss to outer space.
Methane Sensor For Mars (MSM) – will measure methane in the atmosphere
of Mars, if any, and map its sources. Particle environment studies.
Mars Exospheric Neutral Composition Analyser (MENCA) – is a quadruple
mass analyser capable of analysing the neutral composition of particles in the
exosphere.
Surface imaging studies
Thermal Infrared Imaging Spectrometer (TIS) – will measure the temperature
and emissivity of the Martian surface, allowing for the mapping of surface
composition and mineralogy of Mars.
Mars Colour Camera (MCC) – will provide images in the visual spectrum,
providing context for the other instruments.
Nov 05, 2013
o PSLV-C25, in its twenty fifth flight successfully launches Mars Orbiter
Mission Spacecraft from SDSC SHAR.
o PSLV-C25 lifted off at 14:38 hrs.
o Automatic sequencing of launch initiated.
o Launch authorised by Mission Director for GO at 14:24 hrs.
o Mobile Service Tower (MST) withdrawal to final parking (150m)
completed. Countdown is normal.
o All vehicle systems are switched ON for the final eight and half hour
countdown starting at 6:08 hrs (IST).
o Second Stage (PS2) Propellant filling operations completed.
Nov 04, 2013
• Second Stage (PS2) Propellant filling commenced.
• Mobile Service Tower (MST) withdrawal up to 50m is completed.
• Mandatory Checks and Preparations for Propellant filling operations of
Second Stage (PS2) are in progress.
Nov 03, 2013
Propellant filling of PS4 stage and RCT completed.
Mixed Oxides of Nitrogen (MON) filling of PS4 completed at 17:00 hrs.
(IST).
Mixed Oxides of Nitrogen (MON) filling of PS4 under progress.
Mono Methyl Hydrazine (MMH) filling of Reaction Control Thrusters (RCT)
completed.
Mono Methyl Hydrazine (MMH) filling completed.
Propellant filling operations of Fourth Stage (PS4) are in progress.
The 56 hr. 30 min countdown of Mission commenced at 06:08 hrs. (IST).
Nov 02, 2013
All the pre-countdown activities have been completed
satisfactorily and the 56 and half hr. countdown of Mission will
commence tomorrow at 06:08 hrs. (IST).
Pre-count down activities of Mission commenced at 08:45 hrs.
Nov 01, 2013
Launch Authorisation Board has approved & cleared the PSLV-
C25/Mars Orbiter Mission launch on Nov 05, 2013 at 14:38
hrs. (IST)
56 and half hr. countdown for launch will begin on Nov 03,
2013 at 06:08 hrs. (IST)
Oct 31, 2013
Launch Rehearsal of PSLV-C25/Mars Orbiter Mission has
been completed successfully in the afternoon on Oct 31,
2013.
Launch Rehearsal of PSLV-C25/Mars Orbiter Mission
commenced at 06:08 hrs. (IST) on Oct 31, 2013 at First
Launch Pad, SDSC SHAR.
Vehicle systems powered and health is normal.
Oct 30, 2013
• Spacecraft & Launch Vehicle integrated level checks
completed.
• Preparations for Launch Rehearsal are under progress.
Oct 22, 2013
• Spacecraft Integration with the Launcher PSLV-C25
Completed.
The 18-metre diameter dish-antenna will be used for communication with craft till April 2014, after which the larger 32-metre antenna will be used.
NASA's Deep Space Network is providing position data through its three stations located in Canberra, Madrid and Goldstone on the US West Coast during the non-visible period of ISRO's network. The South African National Space Agency's (SANSA) Hartebeesthoek (HBK) ground station is also providing satellite tracking, telemetry and command services. Additional monitoring is provided by technicians on board two leased ships from the Shipping Corporation of India, SCI Nalanda and SCI Yamuna which are currently in position in the South Pacific near Fiji.
PSLV-C25 carrying the Mars Orbiter Mission spacecraft was launched
from Sriharikota on 5 November 2013.
As originally conceived, ISRO would have launched MOM on its new
Geosynchronous Satellite Launch Vehicle (GSLV), but the GSLV has
failed twice in two space missions in 2010, ISRO is still sorting out
issues with its cryogenic engine, and it was not advisable to wait for
the new batch of rockets since that would have delayed the MOM
project for at least three years. ISRO had to make a choice between
delaying the Mars Orbiter Mission and switching to the less-powerful
PSLV.
They opted for the latter. There is no way
to launch on a direct-to-Mars trajectory
with the PSLV as it does not have the
power. Instead, ISRO launched it into
Earth orbit first and slowly boosted it
into an interplanetary trajectory with
the help of gravity assist manoeuvres.
The Launch Vehicle - PSLV-C25 will inject the Spacecraft into an Elliptical Parking Orbit with a perigee of 250 km and an apogee of 23,500 km. With six Liquid Engine firing, the spacecraft is gradually maneuvered into a hyperbolic trajectory with which it escapes from the Earth’s Sphere of Influence (SOI) and arrives at the Mars Sphere of Influence.When spacecraft reaches nearest pointof Mars (Peri-apsis), it is maneuvered in to an elliptical orbit around Mars by firing the Liquid Engine. The spacecraft then moves around the Mars in an orbitwith Peri-apsis of 366 km and Apo-apsisof about 80000 km.
1. Geo Centric Phase
The spacecraft is injected into an Elliptic Parking Orbit by the launcher. With
six main engine burns, the spacecraft is gradually maneuvered into a
departure hyperbolic trajectory with which it escapes from the Earth’s
Sphere of Influence (SOI) with Earth’s orbital velocity + V boost. The SOI of
earth ends at 918347 km from the surface of the earth beyond which the
perturbing force on the orbiter is mainly due to the Sun. One primary
concern is how to get the spacecraft to Mars, on the least amount of fuel.
ISRO uses a method of travel called a Hohmann Transfer Orbit – or a
Minimum Energy Transfer Orbit – to send a spacecraft from Earth to Mars
with the least amount of fuel possible.
2. Helio Centric Phase
The spacecraft leaves Earth in a direction tangential to Earth’s orbit and
encounters Mars tangentially to its orbit. The flight path is roughly one half
of an ellipse around sun. Eventually it will intersect the orbit of Mars at the
exact moment when Mars is there too. This trajectory becomes possible
with certain allowances when the relative position of Earth, Mars and Sun
form an angle of approximately 44o. Such an arrangement recur
periodically at intervals of about 780 days. Minimum energy opportunities
for Earth-Mars occur in November 2013, January 2016, May2018 etc.
3. Martian Phase
The spacecraft arrives at the Mars Sphere of Influence (around
573473 km from the surface of Mars) in a hyperbolic trajectory. At the
time the spacecraft reaches the closest approach to Mars (Periapsis),
it is captured into planned orbit around mars by imparting ∆V retro
which is called the Mars Orbit Insertion (MOI) manoeuvre. The Earth-
Mars trajectory is shown in the above figure. ISRO plans to launch the
Mars Orbiter Mission during the November 2013 window utilizing
minimum energy transfer opportunity.
Mars Orbiter Mission spacecraft being prepared for a
prelaunch test at Satish Dhawan Space Centre SHAR,
Srihairkota.
First image of the Earth by Mars Color Camera (MCC) of Mars Orbiter Spacecraft taken on
Nov 19, 2013 at 13:50 hrs. (IST) from 67975 km altitude with a resolution of 3.53 km.
The Polar Satellite Launch Vehicle, usually
known by its abbreviation PSLV is the first
operational launch vehicle of ISRO. PSLV is
capable of launching 1600 kg satellites in 620
km sun-synchronous polar orbit and 1050 kg
satellite in geo-synchronous transfer orbit. In
the standard configuration, it measures 44.4
m tall, with a lift off weight of 295 tonnes.
PSLV has four stages using solid and liquid
propulsion systems alternately. The first stage
is one of the largest solid propellant boosters
in the world and carries 139 tonnes of
propellant. A cluster of six strap-ones attached
to the first stage motor, four of which are
ignited on the ground and two are air-lit.
The reliability rate of PSLV has been superb. There had been
25 continuously successful flights of PSLV, till April 2014 .
With its variant configurations, PSLV has proved its multi-
payload, multi-mission capability in a single launch and its
geosynchronous launch capability. In the Chandrayaan-
mission, another variant of PSLV with an extended version of
strap-on motors, PSOM-XL, the payload haul was enhanced
to 1750 kg in 620 km SSPO. PSLV has rightfully earned the
status of workhorse launch vehicle of ISRO.
1. Lift-off weight 295 tonne
2. Pay Load 1600 kg in to 620 km Polar Orbit,
1060 kg in to Geosynchronous Transfer
Orbit (GTO)
3. Height 44 metre
Typical Parameters of PSLV