Moladi Construction Technology

61
The moladi Approach to Affordable Housing Delivery

description

ThemoladiApproach to Affordable Housing DeliveryThemoladiApproach to Affordable Housing DeliveryCurrent Global Status• • • • • • • Slums Massive Backlog Poor Quality Small Units Un-Affordable Skill Shortage UnemploymentThe DilemmaThe building industry’s emphasis has traditionally been on commercially viable projects sidelining low-cost housing and the implicated low profit margins. As a rule, small contractors build lowcost affordable houses in traditional ineffective ways, wi

Transcript of Moladi Construction Technology

Page 1: Moladi Construction Technology

The moladi Approach to Affordable Housing Delivery

Page 2: Moladi Construction Technology

The moladi Approach to Affordable Housing Delivery

Page 3: Moladi Construction Technology

Current Global Status

• Slums• Massive Backlog• Poor Quality• Small Units• Un-Affordable• Skill Shortage• Unemployment

Page 4: Moladi Construction Technology

The Dilemma

The building industry’s emphasis has traditionally been on commercially viable projects sidelining low-cost housing and the implicated low profit margins. As a rule, small contractors build low-cost affordable houses in traditional ineffective

ways, with low quality materials, inferior workmanship, resulting in waste and rework,

little or no professional support, and most importantly, no benefit of economy of scale.

Page 5: Moladi Construction Technology

Due to the neglect of the poor and very poor over many decades, the real source of market promise is not the wealthy few in the developing world, or even the emerging middle-income consumers: It is the billions of aspiring poor who are joining the

market economy for the first time.

AffordableHigh

Low

The Opportunity

Page 6: Moladi Construction Technology

Problem Areas

SKILLED LABOUR

LOGISTICS

SUB STANDARD MATERIAL

CONTRACTOR SKILL

WASTE

INEFFICIENCY

CASH FLOW

MANAGEMENT

PROCUREMENT

SUPPLY CHAINTRANSPORT

QUALITY CONTROL

Page 7: Moladi Construction Technology

“Our age of anxiety is, in great part, the result of trying to do today’s jobs with

yesterday’s tools”.

Page 8: Moladi Construction Technology

Logistics – Supply Chain

Page 9: Moladi Construction Technology

Automotive Assembly Line

Time? Cost? Quality?

Retail Supply Chain vs Production Line-OEM

Page 10: Moladi Construction Technology

Logistics – Supply Chain

Page 11: Moladi Construction Technology

Result:

Time? Cost? Quality?

Retail supply chain vs Production Line-OEM

Page 12: Moladi Construction Technology

Conventional Construction Cycle

– Erratic supplies = erratic delivery– Dependant on skilled labour– Waste– Rework– Slow delivery– Inconsistent quality– Unpredictable cash flow– Increased cost

Page 13: Moladi Construction Technology

Henry Ford

Don't find a fault, find a remedy.

Page 14: Moladi Construction Technology

moladi Technology

A MECHANISM for the RAPID delivery of QUALITY housing

EMPOWERING local communities

…a contemporary company that

harnessesand implements

contemporary solutions

Page 15: Moladi Construction Technology

Lean ProductionOne of the important principles under a lean production

paradigm is termed ‘lean assembly’.

This refers to simplifying the process of assembly through industrialisation, modularisations, standardisation, and continuous flow processes.

The reduction of operations required for a production process means less chance of the occurrence of errors, waste and rework.

This follows from the same logic that the fewer the number of operations, the higher the quality of the product and a predictive timeline, resulting in cost savings.

Page 16: Moladi Construction Technology
Page 17: Moladi Construction Technology
Page 18: Moladi Construction Technology
Page 19: Moladi Construction Technology
Page 20: Moladi Construction Technology
Page 21: Moladi Construction Technology
Page 22: Moladi Construction Technology
Page 23: Moladi Construction Technology
Page 24: Moladi Construction Technology
Page 25: Moladi Construction Technology
Page 26: Moladi Construction Technology
Page 27: Moladi Construction Technology
Page 28: Moladi Construction Technology
Page 29: Moladi Construction Technology
Page 30: Moladi Construction Technology

Erect moladi formwork in 4 hours

Page 31: Moladi Construction Technology

Fill moladi formwork in 2 hours

Page 32: Moladi Construction Technology
Page 33: Moladi Construction Technology

Strip moladi formwork in 2 hoursNext Day -

Page 34: Moladi Construction Technology
Page 35: Moladi Construction Technology
Page 36: Moladi Construction Technology
Page 37: Moladi Construction Technology
Page 38: Moladi Construction Technology
Page 39: Moladi Construction Technology
Page 40: Moladi Construction Technology

Mortar – not concrete

Page 41: Moladi Construction Technology

moladi Construction Cycle– Constant supply = constant delivery– Known cost– Unskilled operators– Next to no waste– Increased productivity– Reduced cost– Consistent quality– Predictable cash flow

Page 42: Moladi Construction Technology

Not just for the POOR

Page 43: Moladi Construction Technology

A wall is a wall is a wall…A structure with a shower can be termed

“Low Cost”

A structure with a bath can be termed “Affordable”

A structure with a Jacuzzi can be termed “High Income”

The finishes of a structure determines the value

No structural quality disparity between“High Income” and “Low Cost” structures

Page 44: Moladi Construction Technology

Progress"He who will not apply new

remedies must expect new evils, for time is the

greatest innovator"

Page 45: Moladi Construction Technology

Double Walk-up

Page 46: Moladi Construction Technology

moladi Slab System

moladi structures are designed to withstand earthquakes

Page 47: Moladi Construction Technology
Page 48: Moladi Construction Technology

Classrooms

Page 49: Moladi Construction Technology

Clinics

Page 50: Moladi Construction Technology

Ablution Block - Mortuary

Page 51: Moladi Construction Technology

Offices

Page 52: Moladi Construction Technology

Factories – Shopping Centers

Page 53: Moladi Construction Technology

Security Walling

Page 54: Moladi Construction Technology

Housing Delivery Impact• Reduce unemployment – Job creation• Community upliftment• Education• Training• Health• Reduce crime• Social development• Carbon footprint• Environment

Page 55: Moladi Construction Technology

moladi Village

Page 56: Moladi Construction Technology

Invitation to Champions• Community development• New Towns

– GAP Housing– Subsidy units– Rental stock– Agriculture– Community amenities

• Training - www.moladiCOLLEGE.co.za• Entrepreneurs• Teamwork –National-Provincial-Municipal

• Streamline Delivery-From Land to Stand

• Housing Specialist – SPV - www.moladi.net• Architects-Town Planners• Engineers• Project Manager • Finance

– Project– End user

• NHBRC• Alternative Energy• Recycle• Greening

Page 57: Moladi Construction Technology

TEAM moladi Countries• South Africa• Botswana• Zimbabwe• Namibia• Angola• Mozambique• Democratic Republic of

Congo• Cameroon• Uganda• Kenya• Nigeria• Ghana• Tanzania• Togo

• Mexico• Brazil• Suriname• Panama• India

and growing…

Forming key partnerships with countries in emergency relief operations and creating a sustainable developmental framework since 1986

Page 58: Moladi Construction Technology

Awards

Social entrepreneurs are not content just to give a fish, or teach how to fish. They will not rest until they have revolutionized the

fishing industry.- Bill Drayton -

200619971991

Page 59: Moladi Construction Technology
Page 60: Moladi Construction Technology

Henry Ford

Whether you think you can or think you can't, you're right.

Page 61: Moladi Construction Technology