Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team...

25
Moe Jamshidi Moe Jamshidi 2011 PM conference 2011 PM conference

Transcript of Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team...

Page 1: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Moe JamshidiMoe Jamshidi2011 PM conference2011 PM conference

Page 2: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

EDC is designed to identify and deploy EDC is designed to identify and deploy innovations aimed at shortening project innovations aimed at shortening project d li h i th f t f d li h i th f t f delivery, enhancing the safety of our delivery, enhancing the safety of our roadways, and protecting the environment. roadways, and protecting the environment.

Victor Mendez, FHWA AdministratorVictor Mendez, FHWA AdministratorVictor Mendez, FHWA AdministratorVictor Mendez, FHWA Administrator

http://www.fhwa.dot.gov/everydaycounts/ http://www.fhwa.dot.gov/everydaycounts/

Page 3: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

NATIONALYNATIONALY LOCALLYLOCALLY

Page 4: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages
Page 5: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages
Page 6: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Warm Mix Warm Mix Prefabricated Prefabricated Adaptive Adaptive Safety Safety GeosyntheticGeosyntheticWa M Wa M AsphaltAsphalt

e ab cated e ab cated Bridge Bridge

Elements and Elements and

ppSignal Signal

Control Control TechnologyTechnology

Sa ety Sa ety EdgeEdge

Geosy t et cGeosy t et cReinforced Reinforced

Soils Soils SystemsSystems

gygy

Page 7: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages
Page 8: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages
Page 9: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Planning and Environmental Linkages

Legal Sufficiency Enhancements

Expanding Use of Programmatic AgreementsExpanding Use of Programmatic Agreements

Use of In-Lieu Fee and Mitigation Banking

Clarifying the Scope of Preliminary Design

Flexibilities in Right of WayFlexibilities in Right-of-Way

Flexibilities in Utility Accommodation and lRelocation

Enhanced Technical Assistance on Ongoing EISs

Page 10: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages
Page 11: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Design Build (DB)Design-Build (DB)

Construction Manager/General Construction Manager/General Contractor (CM/GC),

Page 12: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

A group of Nebraska NDOR, FHWA, A group of Nebraska NDOR, FHWA, Contractors, LPA, and Consultants attended a workshop in Minneapolis last October

After the workshop a State Implementation Team (SIT) was formed.( )

SIT is now in the process of chartering a number of teams to implement EDC number of teams to implement EDC initiatives.

Page 13: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Warm Mix AsphaltWarm Mix Asphalt

Prefabricated Bridge Elements and Prefabricated Bridge Elements and Systems

Ad ti Si l C t l T h lAdaptive Signal Control Technology

Safety EdgeSafety Edgey gy g

GeosyntheticGeosynthetic Reinforced SoilsReinforced Soils

Page 14: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages
Page 15: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Develop and implement a standard Develop and implement a standard specification allowing the use of Warm Mix Asphalt (WMA) as a contractor determined l ialternative.

Present a draft construction specification for pWMA by July 1st, 2011.

Team Champions: Team Champions: Frank Rich, FHWA and Robert Rea, NDORFrank Rich, FHWA and Robert Rea, NDOR

Page 16: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages
Page 17: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Develop standard plans and specifications for Develop standard plans and specifications for safety edge.

Preliminary report and recommendation due Preliminary report and recommendation due by June 1st, 2011

Team Champions: John Perry, FHWA and Ted Watson, NDORJohn Perry, FHWA and Ted Watson, NDOR

Page 18: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages
Page 19: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Determine applicability and feasibility in Nebraska and develop standards based on Nebraska, and develop standards based on FHWA guidance and criteria for suitable use.

Prepare draft report, and proposed implementation plan by July 1st 2011

Team Champions: David Mraz, FHWA and Mark Traynowicz NDORDavid Mraz, FHWA and Mark Traynowicz NDOR

Page 20: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Planning and Environmental Linkages

Legal Sufficiency Enhancements

Expanding Use of Programmatic AgreementsExpanding Use of Programmatic Agreements

Use of In-Lieu Fee and Mitigation Banking

Clarifying the Scope of Preliminary Design

Flexibilities in Right of WayFlexibilities in Right-of-Way

Flexibilities in Utility Accommodation and lRelocation

Enhanced Technical Assistance on Ongoing EISs

Page 21: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Currently Nebraska uses 6 programmatic agreements in the NEPA Process. The goal of thi j t i t id tif th ti this project is to identify other programmatic agreements used in other states and select and implement those that have applicability to the Federal aid Highway Program in to the Federal-aid Highway Program in Nebraska.

Individual implementation plans and Individual implementation plans and schedules are developed for each of the identified Programmatic Agreements

Team Champions: RaeganRaegan Ball, FHWA, and Ball, FHWA, and Eric Zach NDOREric Zach NDOR

Page 22: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Currently NDOR and LPAs must develop project Currently NDOR and LPAs must develop project specific mitigation plans if wetland and streams warrant mitigation. Onsite, project specific mitigation plans can be controversial and time consuming to develop. An in-lieu fee of mitigation would address these problemsof mitigation would address these problems.

Implementation plan is due at the end of September 2011

Team Champions: Melissa Melissa MaiefskiMaiefski, FHWA, and , FHWA, and Team Champions: Melissa Melissa MaiefskiMaiefski, FHWA, and , FHWA, and Jason Jason JurgansJurgans, NDOR, NDOR

Page 23: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Prepare a programmatic agreement between Prepare a programmatic agreement between the NDOR and the FHWA that defines preliminary design policies in accordance with FHWA Executive Order, FHWA Policy on Permissible Project Related Activities During the NEPA process issued on October 1 2010the NEPA process issued on October 1, 2010

Preliminary report and recommendation to the SIT by June 1st, 2011

Team Champions: Nick Finch, FHWA, and Nick Finch, FHWA, and Team Champions: Nick Finch, FHWA, and Nick Finch, FHWA, and Christian Davenport, NDORChristian Davenport, NDOR

Page 24: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages

Charter has not yet been developed

Page 25: Moe Jamshidi 2011 PM conference - dot.nebraska.gov · implementation plan by July 1st 2011 Team Champions: David Mraz, FHWA and Mark Traynowicz NDOR Planning and Environmental Linkages