Scoping and Introduction to the Case Study Agenda

o Introduction to the Case Study

o Design scope – project data, schedule, specialties, budget, and key concerns

o Forms used in scoping

o Scoping meeting questions document

o SWMP Information Request Form

Scoping and Introduction to the Case Study 2

Page 3: Module 4 Introduction to the Case Study and Scoping

Case Study:Powers Blvd Extension North Site Location

Air Force Academy

North Gate Pkwy

Powers Blvd

Expansion Site

Interstate 25

Voyager Parkway

Colorado Springs

Scoping and Introduction to the Case Study 3

Powers Blvd Expansion Site

North Gate Pkwy

Voyager Pkwy

I-25

1

Air Force Academy

Page 4: Module 4 Introduction to the Case Study and Scoping

CDOT DBB Development “Process”

Environmental Evaluation/NEPA starts

ConstructionPhase

DesignPhase

Proposed Project

4

Scope

FIR

FOR

AD

Construction

SWMP Development

Process Occurs

Scoping and Introduction to the Case Study

Page 5: Module 4 Introduction to the Case Study and Scoping

Scoping Phase

1. Design scope – project data, schedule, specialties, budget, and key concerns

2. Design Scoping Review (DSR)- Early review of a project prior to preliminary design

Slide 5

Scoping involves two main steps:

Scoping and Introduction to the Case Study 5

R

CDOT Procedural Directive 512.1 and Project development manual

Page 6: Module 4 Introduction to the Case Study and Scoping

Stormwater Information

o Involves state and potentially local agencies, design-build contractors or consultant specialists, and the CDOT Project Design Team to complete

o Stormwater information must be obtained by the SWMP Administrator for Design from various sources and incorporated into the SWMP

o How is the information obtained?

Scoping and Introduction to the Case Study 6

Page 7: Module 4 Introduction to the Case Study and Scoping

Information Sources - Scoping Forms/Documents

o DSR Meeting Questions

o Form 463

o CDOT SWMP Informational Request Document

• Sent to Design Engineer (or can be used to get HQ LA involved with a project)

• Identifies Information Needs

Slide 7Scoping and Introduction to the Case Study 7

2

Page 8: Module 4 Introduction to the Case Study and Scoping

Scoping and Introduction to the Case Study 8

Powers Boulevard Extension North Scoping Meeting

Case Study: Scoping Meeting

Poll Question

Page 9: Module 4 Introduction to the Case Study and Scoping

DSR Meeting Participants

o Region Environmental Specialist (or RPEM if not delegated to RES or RWPCM)

o Project Engineer for Design (aka Design Engineer) (RE if not delegated to Design Engineer)

o Hydraulic Engineer

o SWMP Administrator for Design

o Materials Engineer

o Utility Specialists

o ROW Specialists

o Bridge Unit Specialists

o Maintenance Personnel

o Local Agency Representatives

o Landscape Architect

o Others as determined by the RE (e.g Regional Wetland Biologist, etc)

9Scoping and Introduction to the Case Study

Page 10: Module 4 Introduction to the Case Study and Scoping

Agenda

o Introductionso Project Overviewo Purpose and Needo NEPA Reporto Scheduleo Preliminary Budgeto Designo Public and Agency Inputo Comments and Input

Case Study: Scoping Meeting

Scoping and Introduction to the Case Study 10

Page 11: Module 4 Introduction to the Case Study and Scoping

Design Engineer

11Scoping and Introduction to the Case Study

• Provides SWMP Administrator for Design with access to project files

• Gives basic design and purpose of the project

• Answers project questions

• Adds SWMP quantities to overall engineering costs.

Page 12: Module 4 Introduction to the Case Study and Scoping

NEPA specialist

12Scoping and Introduction to the Case Study

• Provides SWMP Administrator for Design with NEPA report

• Gives information and restrictions about wetlands, cultural resources, and threatened and endangered species or wildlife restrictions

• Answers project NEPA questions

• Provides mapping for areas that cannot be impacted by the project

Page 13: Module 4 Introduction to the Case Study and Scoping

Local Agencies and Other Stakeholders

13Scoping and Introduction to the Case Study

Page 14: Module 4 Introduction to the Case Study and Scoping

What preliminary information is provided or discussed at the DSR?

15Slide 15

Quiz Time

1. Location of the proposed project

2. Identification of initial environmental concerns

3. Preliminary schedule and budget

4. Engagement of Stakeholders and team members

Scoping and Introduction to the Case Study

Page 15: Module 4 Introduction to the Case Study and Scoping

Importance of DSR

16

o Reduces risks by ensuring critical issues are addressed

o Scoping sets the stage for further field inventory and prep of FIR documents including the 30-40% draft of the SWMP discussed in the next few modules

Scoping and Introduction to the Case Study

Page 16: Module 4 Introduction to the Case Study and Scoping

Design Tracking Tool

17

Form 1048 is a review list (tracking tool) intended to be filled out as the project moves through design from scoping to AD.

Scoping and Introduction to the Case Study

Page 17: Module 4 Introduction to the Case Study and Scoping

Environmental Scoping Checklist

18

The Environmental Scoping Checklist has been developed by some regions

o To identify what topics:

• Have been addressed

• Are ongoing

• Are completed

Scoping and Introduction to the Case Study

Page 18: Module 4 Introduction to the Case Study and Scoping

SWMP Checklist

19

The SWMP Checklist has been developed by CDOT HQ as a guidance document.

o To provide consistency for CDOT SWMPs

o Allow for easy cross checking for elements

o Support stormwater compliance

Scoping and Introduction to the Case Study

Page 19: Module 4 Introduction to the Case Study and Scoping

Form 128

20Scoping and Introduction to the Case Study

Signed by RPEM or their designee that SWMP has been completed and meets CDOT requirements

Page 20: Module 4 Introduction to the Case Study and Scoping

Quiz Time

Who is not required to attend the DSR Meeting?