Mmx outubro 2012 - ingles

46
MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY Rio de Janeiro | October 2012

Transcript of Mmx outubro 2012 - ingles

Page 1: Mmx   outubro 2012 - ingles

MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY

Rio de Janeiro | October 2012

Page 2: Mmx   outubro 2012 - ingles

This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term

is defined in the Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section

21E of the U.S. Securities Exchange Act of 1934. All statements other than statements of historical facts are statements

that could be deemed forward-looking statements and are often characterized by the use of words such as “projects”,

“expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or

comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking statements include

projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates.

By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both

general and specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or

developments described in such statements may not be indicative of results or developments in future periods. We caution

participants of this presentation not to place undue reliance on these forward-looking statements as a number of factors

could cause future results to differ materially from these statements.

Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory

approvals on a timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological

resources into mineral reserves, and changes in economic, political and regulatory conditions. We caution that the

foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should carefully

consider these factors as well as other uncertainties and events.

MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an

offer to sell (which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any

securities in the United States, or any other jurisdiction. The securities referred to herein have not been registered in any

jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as amended, or any applicable

state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption

from such registration requirements.

This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in

whole or in part without MMX’s prior written consent.

DISCLAIMER

Page 3: Mmx   outubro 2012 - ingles

MMX INTRODUCTION

1

Page 4: Mmx   outubro 2012 - ingles

HIGH QUALITY MINING ASSETS IN TRADITIONAL

MINING DISTRICTS

Sudeste System Serra Azul Unit

Bom Sucesso Unit Corumbá System

Sudeste Superport

Two operating systems: Serra Azul and Corumbá

Current Capacity: 10.1 Mtpy

Mining rights in traditional iron ore districts:

Brazil (Minas Gerais and Mato Grosso do Sul)

Production committed with strategic consumers –

China and South Korea – through long-term

contracts

Brownfield start up in Brazil

Expanding beyond 40 Mtpy in Brazil, through

fully integrated systems: Private port

Strategic port location

4

Page 5: Mmx   outubro 2012 - ingles

46% Controlling Shareholders

16% Wisco

14% SK Networks

24% Others

MMX Corumbá Mineração

MMX Sudeste Minera MMX

do Chile

Superporto Sudeste

Serra Azul

Bom Sucesso

100% 100% 100% 94.52%

5,48% EBX

MMXM3: SOLID CONTROLLING SHAREHOLDERS

5

Page 6: Mmx   outubro 2012 - ingles

SRK certification: 3,1 billion tons of mineral resources, and further mineral

potential of up to 1,4 billion tons. Reserves of 1 billion tons in Serra Azul.

64% of future production already committed through long-term contracts

Experience management team with implementation and operational expertise

Installed Capacity of 10 Mtpy (Serra Azul and Corumbá sites)

Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to

seaborne markets

Long Term Railway Contract with MRS

Low stripping ratio

Competitive scale – New beneficiation plant

Energy supply contract with MPX

Infrastructure with integrated logistics

Resource Base

Secured Off-take

Operational Track Record

Guaranteed Logistics

Competitive Production Cost

Structure

INGREDIENTS FOR A SUCCESSFUL IRON ORE

BUSINESS

6

Page 7: Mmx   outubro 2012 - ingles

Conclusion of the offshore civil works at the Sudeste Superport

Issuance of debentures at the amount of R$ 600 million

Approval of the merger of PORTX into MMX

Public hearings in Itaguaí and Mangaratiba for the expansion of the Sudeste

Superport to 100 Mtpy

Beginning of construction of the Serra Azul Unit expansion

Installation License authorizing the Serra Azul Unit expansion

MMX signs contract for railway services with MRS through 2026

SRK certified 997,4 million tons of mineral reserves at Serra Azul Unit

Orders for long lead equipment for Serra Azul expansion

EPCM contract with CNEC Worley Parsons for Serra Azul expansion

Contract with MPX for energy supply for expansion of Serra Azul

Financial advisory contract with Itaú BBA and Bradesco

Deal with Usiminas

October 2012

February 2011

A LOT HAS BEEN DELIVERED

7

Page 8: Mmx   outubro 2012 - ingles

FINANCIAL HIGHLIGHTS

37% 32% 33%

63% 68% 67%

0%

20%

40%

60%

80%

100%

2Q11 1Q12 2Q12

Debt profile

Short Term Long Term

61% 53% 56%

0%

15%

30%

45%

60%

2Q11 1Q12 2Q12

Gross Margin (%)

75.2

4.2 13.9

0

15

30

45

60

75

90

2Q11 1Q12 2Q12

EBITDA (R$ million)

90,9 49,3

-391,6

-400

-300

-200

-100

0

100

200

2Q11 1Q12 2Q12

Net Profit (R$ million)

Page 9: Mmx   outubro 2012 - ingles

SUDESTE SYSTEM

2

Page 10: Mmx   outubro 2012 - ingles

SERRA AZUL UNIT

2.1

Page 11: Mmx   outubro 2012 - ingles

UNIQUE INTEGRATED LOGISTICS

Since Iron ore is a bulk commodity, an integrated logistic (mine railway port) is the key factor for a successful operation

Mine Superport Railway

Serra Azul unit is near to the MRS railway - 10 km from the mine, a distance currently traversed by trucks.

MMX has a long term contract with MRS railway, which connects the mine with the CSN’s port and the Sudeste Superport, both located in Itaguaí.

Sudeste Superport will have 50Mtpy iron ore shipping capacity. The Superport will have a depth of 20 meters, enough to handle Capesize vessels.

Offtakers (Shareholders)

Long-Term contract (20 years) to trade iron ore. SK will take-off part of the Sudeste System yearly production equivalent to its participation in MMX Capital (14%).

SK and Wisco will together offtake 64% of total production

Long-Term contract (20 years). Wisco will off-take at least 50% of MMX Sudeste production.

11

Page 12: Mmx   outubro 2012 - ingles

QUADRILÁTERO FERRÍFERO Iron ore Quadrangle

12

Page 13: Mmx   outubro 2012 - ingles

RAILWAY

Railway access conecting MRS to the Sudeste Superport

13

Page 14: Mmx   outubro 2012 - ingles

Contract signed on December 28th 2011.

Long term contract through 2026.

Provides for a volume of up to 36 million tons of iron ore per year.

Tariff: R$ 26.463/ton , net of tax, readjusted annually by a parametric

formula the variation in IGP-DI and in diesel oil.

MRS CONTRACT

MMX signed a long term contract for railway services

14

Page 15: Mmx   outubro 2012 - ingles

SERRA AZUL

Expansion project with integrated logistic and pellet feed iron ore

Highlights

Production target: 29 Mtpy

64% of production already committed through long-term

contracts

997.4 million tons of reserves already secured by SRK

Execution Update

Beginning of construction of Serra Azul Unit expansion

Construction license issued in April, 2012

Acquisition of gyratory crushers, ball mills, SAG mills and

vertical mills for the new beneficiation plant

Contract with CNEC WorleyParsons

Contract with MPX to supply power for 15 years at a

base-price of R$125/MWh

Expected Quality – Ouro Preto pilot plant test work

Fe: 66.65% P: 0.025%

SiO2: 3.23% Mn: 0.018%

AL2O3: 0.54% LOI: 0.75%

15

Page 16: Mmx   outubro 2012 - ingles

SERRA AZUL

Growth through consolidation while leveraging existing infrastructure

16

Page 17: Mmx   outubro 2012 - ingles

SERRA AZUL

Serra Azul Unit Expansion Project

New Beneficiation Plant, transmission line and water pipelines, Stockyard and Loading Terminal

Pit

17

Page 18: Mmx   outubro 2012 - ingles

Serra Azul Expansion

Beneficiation Plant 18

Page 19: Mmx   outubro 2012 - ingles

Earthwork

19

Construction Site and

Warehouse

Maintenance workshop

Benefic. substation

Sump and Thickners

Administrative Buildings

Primary Crushing

Grind

Pile

Construction Site

Processing

SERRA AZUL

Page 20: Mmx   outubro 2012 - ingles

SUDESTE SUPERPORT

2.2

Page 21: Mmx   outubro 2012 - ingles

Sudeste Superport

Location

21

Page 22: Mmx   outubro 2012 - ingles

Nautical Access

Offshore

Tunnel

Stockyard 32

Stockyard 06

Railway Access

Sudeste Superport

Artistic View

22

Page 23: Mmx   outubro 2012 - ingles

SUDESTE SUPERPORT

Overview

Sudeste Superport - Itaguaí

Highlights

50 Mtpy capacity, expandable to 100

Mtpy

Capesizes handling

Loading: 2 ship loaders of 25 Mtpy each

Fully funded (BNDES)

Licensing for 100 Mtpy underway

23

Page 24: Mmx   outubro 2012 - ingles

SUDESTE SUPERPORT

Overview

Sudeste Superport - Itaguaí

Highlights

Licensed to 50 Mtpy

Licensing for 100 Mtpy underway

Public hearing for 100 Mtpy held on May, 2012

Navy Approval to 100 Mtpy

Construction works for the tunnel and offshore

infrastructure completed

24

Page 25: Mmx   outubro 2012 - ingles

USIMINAS AGREEMENT

SRK resources audit : 810 million tons

plus a potential of an additional 75

million tons

Pau de Vinho target production: 8 Mtpy

Significant synergies with current

mining operations at Serra Azul

13.5% of production at Pau de Vinho

will be delivered to Usiminas

MMX will be responsible for the

licensing, CAPEX and operation for 30

years

Handling fee: USD 12.63/ton adjusted

by US-PPI

Volumes:

■ 12 Mtpy

80% Take-or-Pay

Usiminas can renew the contract for 1

to 5 years

Pau de Vinho Joint Mining Sudeste Superport Handling

25

Page 26: Mmx   outubro 2012 - ingles

Sudeste Superport

Railway access

26

Page 27: Mmx   outubro 2012 - ingles

Sudeste Superport

Stockyard Elevation 6 m

27

Page 28: Mmx   outubro 2012 - ingles

Sudeste Superport

Car Dumpers Elevation 6 m

28

Page 29: Mmx   outubro 2012 - ingles

Assembly of car dumpers

SUDESTE SUPERPORT

Page 30: Mmx   outubro 2012 - ingles

SUDESTE SUPERPORT

Assembly of car dumpers

30

Page 31: Mmx   outubro 2012 - ingles

Sudeste Superport

Mariquita Hill

31

Page 32: Mmx   outubro 2012 - ingles

Sudeste Superport

Stockyard Elevation 32 m

32

Page 33: Mmx   outubro 2012 - ingles

11 m

20.5 m

Sudeste Superport

Tunnel entrance

33

Page 34: Mmx   outubro 2012 - ingles

Sudeste Superport

Tunnel exit

34

Page 35: Mmx   outubro 2012 - ingles

Bridge

450 m

35 35

Superporto Sudeste

Offshore Structure - Bridge

Page 36: Mmx   outubro 2012 - ingles

36

Superporto Sudeste

Offshore Structure

Page 37: Mmx   outubro 2012 - ingles

SUDESTE SUPERPORT

37

Shiploader (China)

Page 38: Mmx   outubro 2012 - ingles

SUDESTE SUPERPORT

Shiploader (China)

38

Page 39: Mmx   outubro 2012 - ingles

BOM SUCESSO

2.3

Page 40: Mmx   outubro 2012 - ingles

BOM SUCESSO

High-quality iron ore with high magnetite content

Highlights

Production target: 10 Mtpy

64% of production already committed through long-term

contracts

Execution Update

Conceptual engineering

SRK resources audit update: 365 million tons plus a

potential of an additional 741 million tons

Expected Quality – Ouro Preto pilot plant test work

Fe: 67.2% P: 0.01%

SiO2: 2.5% PPC: 0.6%

AL2O3: 0.2% FeO: 25%

40

Page 41: Mmx   outubro 2012 - ingles

CORUMBÁ

3

Page 42: Mmx   outubro 2012 - ingles

CORUMBÁ

Highlights

Current Capacity: 2.1 Mtpy

Long-term contracts signed with local and international

barge operators

77% of production already committed through

long-term contracts

SRK audit resources report: 192 million tons plus a

potential of an additional 123 million tons

42

Page 43: Mmx   outubro 2012 - ingles

CHILE

4

Page 44: Mmx   outubro 2012 - ingles

CHILE

Highlights

High-quality iron ore with magnetite content

Production target: 10 Mtpy

50% of production already committed through long-

term contracts

460 Mtons of iron ore potential

Execution Update

Drilling performed 2011: approximately 43

thousand meters

Expected Quality – Ouro Preto pilot plant test work

Fe: 67.50% SiO2: 2.5%

Al2O3: 0.85% P: 0.015%

44

Page 45: Mmx   outubro 2012 - ingles

CHILE

Castilha Port

BERTH N° 1 – COAL

BERTH N° 2 – IRON ORE

BERTH N° 3 – COPPER

Deep water port – 28 meter draft: Chinamax vessels

45

Page 46: Mmx   outubro 2012 - ingles

Investor Relations Guilherme Escalhão – CEO and IRO

Adriana Marques – Manager Daniella Maia - Analyst

Phone + 55 21 2163-6197 +55 21 2163-4366

[email protected]