MIx Use Architecture

1
rain collection roof garden filtration visiual experience of intense space residential apartment from a marginal space, open to intense area intense collection space This was a 15 week project to quickly and efficiently understand comprehensive building in the world of architecture. The analysis of the project included urban categories of intense, transitional and marginal urban spaces within the Lafayette, Louisiana downtown area. The analysis led to an understanding of dynamic relationships and play between the three categories as they intertwine with each other in the downtown area. This understanding then lead to the basic schematic design for the building, a play between materials, program, and space. BUCHANAN [urban mix use] - creating architecture beyond ‘building.’ site site site density purpose pedestrian space dense, purposeful, heavy pedestrian space transitional, fading, less pedestrian space marginal, empty, no pedstrian space To transition from schematic design into design development, modeling was used to inspire dynamic relationships between materials, program, and space. Specifically relevant model work include two model studies working through plan and section. These models were able to detach at three floor levels and two building sections, allowing further study and anaylsis in a three dimensional form while simultaneously developing the architectural design. Nearing the end of the 15-weeks, construction documentation for the project was started. Since built architecture revolves around the aspect of documentation and management, the experience gained from this phase of the project is extremely valuable. This project was used as an introduction to creating CDs, professional practice, and managerment in architecture. I worked with Carl B Trimble, RA (30+ years professional experience). The final documentation completed for the project included; site plan, two floor plans, two reflected ceiling plans, two exterior elevations, two building sections, two wall sections, stairs, details, specification outline, and cost estimate. 1. 4. 3. 6. 5. 5. 2. 5. 5. 7. 7. 8. 5. 5. 6. 9. 10. 11. 22 07 04 1 24 06 COFFEE SHOP RESIDENTIAL ENTRANCE ELEVATOR 01 22 23 24 25 17 15 13 18 35 36 2 32 33 38 37 4" 13'-8" 6" 58'-1" APARTMENT 02 APARTMENT 03 OPEN TO BELOW ELEVATOR 01 STAIR 0 SEE A- BATHROOM 01 BATHROOM 02 OFFICE BATHROOM 02 A A A A A A OPEN TO ABOVE G F E D TWORK THRU CESSARY AT APARTMENT 03 - LIVING SPACE APARTMENT 03 - BATHROOM APARTMENT 03 - OFFICE APARTMENT 03 - BEDROOM 02 CAFE CAFE - EXTERIOR SPACE OFFICE SPACE

description

Teaser Page

Transcript of MIx Use Architecture

Page 1: MIx Use Architecture

rain collectionroof garden filtrationvisiual experience

of intense space

residential apartment

from a marginal space,open to intense area

intense collection space

This was a 15 week project to quickly and efficiently understand comprehensive building in the world of architecture. The analysis of the project included urban categories of intense, transitional and marginal urban spaces within the Lafayette, Louisiana downtown area.

The analysis led to an understanding of dynamic relationships and play between the three categories as they intertwine with each other in the downtown area. This understanding then lead to the basic schematic design for the building, a play between materials, program, and space.

BUCHANAN [urban mix use]- creating architecture beyond ‘building.’

sitesitesite

densitypurposepedestrian space

dense, purposeful, heavy pedestrian space

transitional, fading, less pedestrian space

marginal, empty, no pedstrian space

To transition from schematic design into design development, modeling was used to inspire dynamic relationships between materials, program, and space. Specifically relevant model work include two model studies working through plan and section. These models were able to detach at three floor levels and two building sections, allowing further study and anaylsis in a three dimensional form while simultaneously developing the architectural design.

Nearing the end of the 15-weeks, construction documentation for the project was started. Since built architecture revolves around the aspect of documentation and management, the experience gained from this phase of the project is extremely valuable. This project was used as an introduction to creating CDs, professional practice, and managerment in architecture. I worked with Carl B Trimble, RA (30+ years professional experience). The final documentation completed for the project included; site plan, two floor plans, two reflected ceiling plans, two exterior elevations, two building sections, two wall sections, stairs, details, specification outline, and cost estimate.

1.

4.

3.

6.

5.

5.

2.

5.

5.

7.

7.

8.

5.

5.

6.

9.

10.

11.

SHEET TITLE

/ /

CONSULTANTS

GEOFF GJERTSON, AIA

CARL B TRIMBLE, RA

KARI SMITH, LEED AP

ONEZIEME MOUTON

DESCRIPTION

PROJECT NO: 001

MODEL FILE: 023

DRAWN BY: KYLE J PORTIE

CHK'D BY: GEOFF GJERTSON, AIA

CARL B TRIMBLE, RA

COPYRIGHT

MARK DATE

SHEET 2OF 9

A-102

Kyle

P:U

sers

:kyle

porti

e:D

eskt

op:F

LOO

RPL

AN04

.pln

THOMAS SAMMONS

109 BUCHANAN STREET

LAFAYETTE, LA 70503

FIRST FLOOR PLAN

URBAN DESIGNSTUDIO

05

01

41

06

22

0704

19

24

02

03

03

040511

06

08

09

10

12

34

56

A

B

C

D

E

F

G

108'-6"8'-9" 15'-6"

23'-2"17'-0"

15'-9"16'-2"

12'-0"

12'-4" 6'-3" 12'-2"25'-4"

6'-11" 6'-4" 15'-3"23'-1"

70'-4

"10

'-5"

19'-2

"23

'-5"

17'-5

"

49'-7

"

70'-3

"

10'-5

"10

'-1"

9'-1

"13

'-9"

21'-0

"5'

-11"

2'-4

"10

'-8"

14'-1

"4'

-1"

15'-6

"

46'-1

0"

108'-6"

25'-0"22'-5"

7'-4"25'-6"

10'-5"17'-9"

51'-1"

10'-5" 5'-10" 6'-2"35'-0"

2 A-107

2 A-106

1 A-106

1 A-107

1 A-108

1 A-106

2 A-106

COFFEE SHOP

COFFEE SHOP

BACKROOM

OFFICE ENTRANCE

RESIDENTIAL ENTRANCE

RESTROOM

01

ELEVATOR 01

MECHANICAL ROOMSTAIR 01

STAIR 02

ELEVATOR

02

RESTROOM

02

Mechanical Room

SCALE: 1/8" = 1'-0"1 1st FLOOR

SHEET TITLE

/ /

CONSULTANTSGEOFF GJERTSON, AIA

CARL B TRIMBLE, RA

KARI SMITH, LEED AP

ONEZIEME MOUTON

DESCRIPTION

PROJECT NO: 001

MODEL FILE: 023

DRAWN BY: KYLE J PORTIE

CHK'D BY: GEOFF GJERTSON, AIA

CARL B TRIMBLE, RA

COPYRIGHT

MARK DATE

SHEET 3 F 9

A-103

Kyle

P:U

sers

:kyle

porti

e:D

eskt

op:F

LOO

RPL

AN04

.pln

THOMAS SAMMONS

109 BUCHANAN STREET

LAFAYETTE, LA 70503

THIRD FLOOR LEVEL

URBAN DESIGNSTUDIO

13

14

15

16

17

18

19 20 21

29

30

31

22

23

2425

17

15

13

18

35

21

25

39

36

28

30

27

3134

32

33

3837

12

34

56

A

B

C

D

E

F

G

2 A-107

1 A-107

1 A-107

1 A-107

1 A-108

1 A-106

2 A-106

83'-6

"

10'-5

"10

'-9"

8'-5

"5'

-8"

8'-2

"14

'-10"

25'-4

"

14'-2

"4'

-4"

37'-3

"7'

-6"

11'-9

"8'

-8"

108'-6"8'-9" 15'-6" 1'-7" 21'-8"

32'-10"28'-2"

11'-11" 7'-6" 16'-10"51'-0"

7'-1" 7'-1" 7'-0"

108'-6"

39'-0"9'-3" 6'-5"

24'-11"28'-10"

59'-11"7'-5" 7'-2"

33'-11"

70'-4

"

30'-4

"21

'-11"

18'-2

"

8" 24'-4" 4" 13'-8" 6"58'-1"

4" 9'-11" 8"

APARTMENT 01

APARTMENT 02

APARTMENT 03

OPEN TO BELOW

STAIR 02SEE A-109

ELEVATOR 01

STAIR 01 -SEE A-109

MECANICAL ROOM

BATHROOM 01

BATHROOM 02

OFFICE

BEDROOM 02

BEDROOM 01 BATHROOM

01

OFFICE

BATHROOM

02

BEDROOM 01

OFFICE

BATHROOM 02

BATHROOM 01

BEDROOM 01

SCALE: 1/8" = 1'-0"1 THIRD FLOOR LEVEL

OF 9

SHEET TITLE

/ /

CONSULTANTSGEOFF GJERTSON, AIA

CARL B TRIMBLE, RA

KARI SMITH, LEED AP

ONEZIEME MOUTON

DESCRIPTION

PROJECT NO: 001

MODEL FILE: 023

DRAWN BY: KYLE J PORTIE

CHK'D BY: GEOFF GJERTSON, AIA

CARL B TRIMBLE, RA

COPYRIGHT

MARK DATE

SHEET 4 OF 9

A-104

Kyle

P:U

sers

:kyle

porti

e:D

eskt

op:C

onst

ruct

ion

Doc

umen

ts:0

4 -

05 R

eflec

ted

Cei

ling

Plan

:REF

LEC

TED

CEI

LIN

G P

LAN

:Refl

ecte

d C

eilin

g Pl

an13

.pln THOMAS SAMMONS

109 BUCHANAN STREET

LAFAYETTE, LA 70503

FIRST LEVEL REFLECTED

CEILING PLAN

URBAN DESIGNSTUDIO

A

12

34

56

A

B

C

D

E

F

G

A

A

A

A

A

A

OPEN TO ABOVE

SCALE: 1/8" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLANGENERAL NOTES AND SYMBOLS

SPRINKLER HEAD

ACCENT LIGHT

FLUORESCENT LIGHTING FIXTURES (2' X 4')

EXIT LIGHTING

PARTITION PENETRATING CEILING PLANE

ALL CEILING HEIGHT 10'0" UNLESS NOTED

SUSPENDED ACOUSTICAL CEILING TILE (2' X 2')

SUSPENDED ACOUSTICAL CEILING TILE (2' X 4')

GYPSUM BOARD CEILING TILE (4'X 4')

CONTROL JOINT

LIGHTWEIGHT CONCRETE

SUPPLY AIR DEVICE

RETURN AIR DEVICE

C.J.

SHEET TITLE

/ /

CONSULTANTSGEOFF GJERTSON, AIACARL B TRIMBLE, RAKARI SMITH, LEED APONEZIEME MOUTON

DESCRIPTION

PROJECT NO: 001MODEL FILE: 023DRAWN BY: KYLE J PORTIE

CHK'D BY: GEOFF GJERTSON, AIA CARL B TRIMBLE, RA

COPYRIGHT

MARK DATE

SHEET 7 OF 9

A-107

Kyle

P:U

sers

:kyle

porti

e:D

eskt

op:C

onst

ruct

ion

Doc

umen

ts:0

7 B

uild

ing

Sec

tion:

sout

hsec

tion0

6.pl

n

THOMAS SAMMONS

109 BUCHANAN STREETLAFAYETTE, LA 70503

LONGITUDINAL & TRANSVERSE

BUILDING SECTIONS

URBAN DESIGNSTUDIO

1 2 3 4 5 6

PARAPET

EGRESS 01

EGRESS 01

EGRESS 01

CAFE BACKROOM CAFE CAFE BATHROOM

OFFICE SPACE

APARTMENT 02 APARTMENT 03APARTMENT 03- BATHROOM

SCALE: 1/8" = 1'-0"1 LONGITUDINAL SECTION

GFEDCBA

THREAD DUCTWORK THRUJOISTS AS NECESSARY ATCEILINGS

PARAPET ROOF

APARTMENT 03 -LIVING SPACE

APARTMENT 03- BATHROOM

APARTMENT 03 -OFFICE

APARTMENT 03 -BEDROOM 02

RESIDENTIALENTRANCE

CAFE CAFE -EXTERIOR SPACE

OFFICE SPACE

SCALE: 1/8" = 1'-0"2 TRANSVERSE SECTION