PRESENTATION BY ENG. M.S.M. KAMAU, CBS, HSC 

THE KONZA TECHNO CITY INVESTORS CONFERENCE

HELD ON 7TH – 9TH AUGUST 2012, 9.10AM AT

AMPHITHEATRE, KICC

Page 2: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 2/11

Page 3: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 3/11

Page 4: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 4/11

Page 5: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 5/11

ROADS NETWORK

Page 6: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 6/11

1. ATHI RIVER – MACHAKOS TURNOFF

The road section is approximately 23km in length and starts at the Athi River

interchange then runs generally in an Eastern direction up to Kyumvi Township,

 which is commonly referred to as Machakos Turnoff. The works envisaged

include:

Construction to bitumen standards of a 2-lane carriageway along the existing

one

Construction of Bypass North-East of Kyumvi Township

Page 7: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 7/11

Construction of grade separated intersections along the highway for access to

(i) Kenya Meat Commission

(ii) Daystar University

 (iii) Kyumvi

(iv) Machakos

Strengthening of existing carriageway as appropriate

Page 8: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 8/11

2. MACHAKOS TURNOFF – KONZA TECHNOCITY

The road section is approximately 24km in length. It starts South-East of 

Kyumvi township where the Bypass meets the old alignment and runs

generally in a southeasterly direction up to Konza. The works envisaged

 

include:

Construction to bitumen standards of a 2-lane carriageway along the

existing

one

Construction of an interchange where the road accessing the Technocity

intersects the highway

Page 9: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 9/11

Strengthening of existing carriageway as appropriate

3.PROJECTS STATUS

The current status of the above projects is as follows:

 

Page 10: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 10/11

No. DESCRIPTION

PROJECTIONS

Development

Partner supportRemarksDESIGN WORKS

1 Second Carriageway of 

Athi River – Machakos

Turnoff 

Probable completion July

2013

Probable start January

2014 and completion

December 2016

World Bank under 

Kenya Transport

Sector Support

Project (KTSSP) to

support Design andConstruction.

Shortlist of consultants to be

invited to submit proposals for 

design and works supervision

awaiting ‘no-objection’ from the

World Bank.

2 Second Carriageway of 

Machakos Turnoff – 

Konza Technocity

Probable completion

March 2013

Probable start

October 2013 and

completion October 2015

World Bank under 

 Northern Corridor 

TransportImprovement Project

(NCTIP) to support

Design.

Terms of Reference for  

 procurement of design consultant

as an addendum under   preparation.

Construction not earmarked for 

support by any partner yet.

Page 11: Ministry for Roads_Konza Investment 2012

7/30/2019 Ministry for Roads_Konza Investment 2012

http://slidepdf.com/reader/full/ministry-for-roadskonza-investment-2012 11/11

END

Q & A