MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki...

9
MIMIC WP 3 Identification and assessment of security- related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics

Transcript of MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki...

Page 1: MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics.

MIMIC WP 3Identification and assessment of security-related risks

Kick off 5.-6.9.2011, Helsinki

Mirva SalokorpiResearch manager, seafaring and logistics

Page 2: MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics.

KyUAS | KymiTechnology | Mirva Salokorpi 2

Project personnel and other partners

Part-time Project manager will start in early October

Recruitment process for a full-time Project specialist on going, the application deadline 8.9.

Research manager (Mirva Salokorpi): responsibility of project establishing and supervising, participate in some tasks, if needed

Project secretary (Päivi Piira)

UTARTU

Finnish ”METO-group”

4.9.2011

Page 3: MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics.

KyUAS | KymiTechnology | Mirva Salokorpi 3

The Main Goal (in the project plan)

The main goal is to define security related threats of maritime oil transportation in the Baltic Sea, and to evaluate their impact on the total safety concept. IMO's adopted FSA (formal safety assessment) is the key procedure here.

4.9.2011

Page 4: MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics.

KyUAS | KymiTechnology | Mirva Salokorpi 4

Background

”Finnish maritime stakeholders (auhtorities) group” (METO-group: The Finnish Transport Agency, Finnish Transport Safety Agency, The Finnish Border Guard, Ministry of Defence, The Finnish Navy, Ministry of Transport and Communication) is the driving force behind will be as an Advisory Board for wp 3

Preliminary study (METO-group, Aalto, VTT and KyAMK) was completed 2010 (not published), oulined the total safety concept

4.9.2011

Page 5: MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics.

KyUAS | KymiTechnology | Mirva Salokorpi 5

Background/purpose/need/aim

To get more information and tools for authorities to develop co-operation and preparing for security threats in the Baltic Sea

Comprehensive approach, basic knowledge about security and safety chains, where these threats and risks can be encounterd

The essential question/challenge: how to model security threats?

4.9.2011

Page 6: MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics.

KyUAS | KymiTechnology | Mirva Salokorpi 6

Main tasks

1. state of the art of the security issues related to oil transportation;

2. identification of threats using FSA procedure;

3. recommendations for using best available risk control options and instruments in the Baltic Sea

4.9.2011

Page 7: MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics.

KyUAS | KymiTechnology | Mirva Salokorpi 7

Tasks and milestones

I MilestoneMay-Aug 2011

• ”O-result”

II MilestoneSep-Deg 2011

• Start• Literature

review (task1)• First

brainstorming session (task1)

• Subcontracted study will be ordered (task2)

III MilestoneJan-Apr 2012

• First report will be published (task1)

• Project seminar (results of task1, other wp:s and kick off of task3)

• 2 x brainstorming sessions (task2)

• Subcontracted study will be finished

• Web-based questionnaire

IV MilestoneMay-Aug 2012

• Preliminary report (task2)

• Presenting the results of the task 1

• List of identified threats and their ranking (task2)

• Preliminary plan for Risk Control Options (task3)

4.9.2011

Page 8: MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics.

KyUAS | KymiTechnology | Mirva Salokorpi 8

Tasks and milestones (2)

V MilestoneSep-Deg 2012

• Final report of the task 2

• The results for the different stakeholders for information and comments

• Preliminary findings of the task 3

VI MilestoneJan-Apr 2013

• Developing the Web Service (UTARTU) (security risk assessment maps)

• Preliminary report (task3)

VII MilestoneMay-Aug 2013

• Closure of the task3

• Testing and using of the Web tool

• Meetings with stakeholders (results and future)

• Writing final report

VIII MilestoneSep-Deg 2013

• Closing period

• Final report (for financier)

4.9.2011

Page 9: MIMIC WP 3 Identification and assessment of security-related risks Kick off 5.-6.9.2011, Helsinki Mirva Salokorpi Research manager, seafaring and logistics.

KyUAS | KymiTechnology | Mirva Salokorpi 9

Questions/discussion

Any other connections to other WP:s or participants?

Presentation of the project in Finnish Russian Maritime Assembly 12-14 October 2011 (Ust Luga), call Russian oil companies and ports to participate to the project

[email protected]

+358 44 702 8513

4.9.2011