Mermaid Subsea (East) - Presentation 071116

24
MERMAID SUBSEA SERVICES 3 rd Oct 2016

Transcript of Mermaid Subsea (East) - Presentation 071116

Page 1: Mermaid Subsea (East) - Presentation 071116

MERMAIDSUBSEASERVICES3rd Oct 2016

Page 2: Mermaid Subsea (East) - Presentation 071116

MermaidSubsea ServicesA MML Group Company

• Wholly owned subsidiary of Singapore listed Mermaid Maritime PCL

• HQ in Thailand since 1982

• Acquired Subtech Qatar Diving Services and Seascape Survey Services in 2008

• Recently completed a fleet expansion and modernization program

• Currently operating throughout South East Asia, Mediterranean, Middle East & India, West Africa, Russia, Australia & the North Sea

MERMAID SUBSEA SERVICES

Subtech Saudi Arabia Ltd

(95%)

Mermaid Subsea Services (T) Ltd

(100%)

Mermaid Maritime Limited

Seascape SurveyThailand(100%)

Zamil Mermaid Offshore Services

(40%)

Seascape SurveysPte Ltd Singapore

(100%)

PT Seascape Survey

Indonesia(49%)

Mermaid Subsea Services LLC (Qatar) (49%)

2

Mermaid Maritime

Mauritius Ltd (100%)

Page 3: Mermaid Subsea (East) - Presentation 071116

A MML Group Company

Singapore

Indonesia

Qatar

Thailand

RegionalOffices

MSS LLCQatar

Seascape Surveys Pte Ltd

MSS (T) Ltd

PT Seascape Surveys Ltd

Zamil Mermaid

Saudi Arabia

3

U.A.E

MSS (Int’l) Ltd Abu Dhabi

Page 4: Mermaid Subsea (East) - Presentation 071116

OffshoreDiving&ROVA MML Group Company

Light Construction, IRM (Inspection, Repairs & Maintenance) via:• Mermaid owned/chartered DP2 DSV’s & ROV SV’s• Air and Saturation diving• Inspection and Work Class ROVs• Survey, Positioning and Inspection (full reporting facilities)

ROV Intervention (examples include):• Wellhead, valve operation• Excavation, deburial, dredging, MFE• Scour protection (mattress installation)• ACFM – electromagnetic inspection technique• High pressure water jetting (cleaning)• Chain measurement (life extension survey)• Free span correction (grout bag installation)

Diving Intervention (examples include):• Spool fabrication & installation• Wet welding, Oxy Arc cutting• PLEMs, Wyes & Tees• Flexible Risers & Umbilicals

• Hot Taps• Subsea structure repairs• Decommissioning• Riser installation

Page 5: Mermaid Subsea (East) - Presentation 071116

Survey&PositioningA MML Group Company

Offshore Construction Support; provides a wide range of survey and positioning services onboard offshore installation and construction vessels and barges.

•Shallow water construction support: Pipelay, trenching, Heavy lift, Cable / Flexible lay

•Deep water construction support: LBL array positioning, Acoustic Metrologies, J-lay, Heavy Lift, Cable/ Flexible lay

Offshore Survey Services; performing a wide range of marine survey projects.

•Geophysical survey: Pre engineering route surveys, feasibility studies, UXO surveys, Environmental baseline studies, Salvage operations, River navigability studies, dredging support, IHO high resolution bathymetric surveys

•Geotechnical survey: CPT, Vibrocore, Dropcore, Piston core, Rotatory drilling options, ROV sampling

Positioning of DP vessels; providing surface and subsea positioning services onboard dynamically-positioned (DP) vessels 5

Page 6: Mermaid Subsea (East) - Presentation 071116

InspectionServicesA MML Group Company

Seascape maintains an in house inspection and reporting division, providing a high level of service and support using a pool of multi-national, highly skilled and trained inspection personnel.

• Inspection Coordinators• CSWIP 3.4u Subsea Inspection Controllers• CSWIP 3.1u and 3.2u Inspection Divers• Report writers, QA/QC• Data processors & Data Managers• Systems technicians

Significant experience with (Seascape owned hardware/software):

• COABIS software• VisualSoft• IRIS eventing systems

Seascape offers fully integrated pipeline and platform inspection services, including reporting

6

Page 7: Mermaid Subsea (East) - Presentation 071116

ProjectManagementA MML Group Company

7

Standard Deliverables of Mermaid Subsea Projects:

• Safety Management System Interface (Bridging) Document• Medical Emergency Response Procedure• Emergency Response Contact List & Flow Chart• QHSE Plan• Management of Change• Project Specific Work Procedures• HAZID Identification & Risk Analysis• Mobilization & Demob Plans

Page 8: Mermaid Subsea (East) - Presentation 071116

ProjectDeliveryA MML Group Company

8

Why select Mermaid Subsea for your Project Delivery?

• One stop solution provider• Comprehensive planning & execution processes• Proven consistent and efficient delivery• Peace of mind from robust QHSE system• Reduced risk via rigorous subcontractor management• Responsiveness & flexibility to meet Client requirements• Integrity, reliability and value for money

Page 9: Mermaid Subsea (East) - Presentation 071116

EngineeringA MML Group Company

9

EngineeringA MML Group Company

9

Experienced In-House Engineering TeamDiscipline specialists: Mechanical, Structural, Electrical, Marine, Remote Equipment, Draughting

Strategic alliances with specialist third party engineering and design partners: e.g. Trenching, Pipeline repair, cables, flexible & umbilical engineering

Capabilities:Project Engineering, Tender Support, Client Technical Interface, Installation Analysis, Mobilisation Engineering, Procedure Development & Offshore Support, System Integration Testing, HIRA Support, Ad-Hoc Engineering Requirements

Page 10: Mermaid Subsea (East) - Presentation 071116

Cable/FlexibleInstallationA MML Group Company

Mermaid is a leading and innovating service provider within the subsea cable installation market:

10

Mermaid has completed a number of submarine cables, flexible & umbilical installation projects. Projects have been executed safely, efficiently and successfully for high profile clients including:

Our expertise comprises a variety of services:

• Cable installation & trenching• Cable protection and /or burial• Cable transportation• J-tube installation• Crossing preparation /installation• Cable shore pull-ins• Cable platform pull-ins• Repair & maintenance subsea cables• Equipment design, engineering & manufacturing• Engineering studies

Page 11: Mermaid Subsea (East) - Presentation 071116

DecommissioningA MML Group Company

Relevant Experience• Chevron Indonesia 5 x subsea wellhead

decommissioning project completed this year (Saturation Diving, WROV, Hot Tapping, Cold Cutting, Wellhead Flushing, Grouting, Survey & Positioning).

• Strong track record of experience decommissioning FSOs, recovering PLEMs and flowlines.

• Significant in-house experience; our PM, Jake Fichter, is collaborating with CUEL Projects Director for a presentation on Decommissioning in Kuala Lumpur in October. Director, Neil Howie also has an abundance of experience in this realm.

• Underwater broco-cutting - extensive experience cutting conductors and supports; same principle as cutting jacket legs.

• ROV Intervention or assistance placing equipment, as well as inspection and observation.

Page 12: Mermaid Subsea (East) - Presentation 071116

DecommissioningA MML Group Company

Relevant Experience• Cold cutting - extensive experience with cold cutting

techniques (typically conductors, risers and pipelines), particularly diamond wire cutting (ROV or Divers).

• Contamination risk - over the years we’ve been involved with the cutting and removal of many pipeline sections contaminated with mercury. We’ve developed experience and procedures to manage such subsea and topside risks.

• Strong Industry connections with engineering, PM, environmental / decontamination management, and barge companies that could be turned into joint venture type structures to offer clients turnkey solutions.

• No single method of decommissioning; appropriate method depends on many variables. Accordingly the starting point is to do an engineering & environmental assessment of the asset to be de-commissioned. 12

Page 13: Mermaid Subsea (East) - Presentation 071116

SolidMixofOSVsA MML Group Company

– MermaidCommander1987– DP2DSV16mantwinbellSATsystem90berths

– MermaidAsiana2010– DP2DSV12manSATsystem100berths

– MermaidEndurer2010– DP2DSV,18manSATsystem86berths

– MermaidNusantara2010– DP2DSV15ManSATSystem120berths

– MermaidSiam2002– DP2Barge10manPortableSATsystem142berths

- MermaidSapphire2008– DP2ROVSVQuasarCompact– 60berths

- Resolution2013– DP2ROVSVQuasarCompact– 60Berths

- MermaidChallenger2008- DP1AHST– 30berths

- SSBarakuda1982Indonesianflag– 30berths

Page 14: Mermaid Subsea (East) - Presentation 071116

DiveSupportVesselsA MML Group Company

MermaidEndurer DP2SATDSV• BuiltNorway2010,Panamaflag,DNVClass• LOAxBreadth:95.0mx20.0m• SATsystem:300m,18man,singlebell• 4.2mx4.2mmoon-pool• Crane:100t(50tAHC),2000mwire• TotalBerths:96(excludesSATdivers)• Helipad:SikorskyS-92rated• ClearDeck:700m2

• Seaeye CougarinspectionclassROV

MermaidCommanderDP2SATDSV• Built1987,Panamaflag,DNVClass,SPScompliantend‘16• LOAxBreadth:91.1mx18.0m• SATsystem:230m,16man,twinbell• Triplemoonpools• Crane:60t(400mwire)• TotalBerths:90(excludesSATdivers)• Helipad:20.4mdiam.S76rated• ClearDeck:700m2

• Seaeye TigerobsROV 14

Page 15: Mermaid Subsea (East) - Presentation 071116

DiveSupportVesselsA MML Group Company

MermaidNusantaraDP2SATDSV• Built2010,IndonesianFlag,BV/BKIClass,SPScompliant,OSVIS• LOA80mx20m,Draft5.5m• 600mClearDeckSpace• 50TKnuckleBoomCrane• 120berths• TVRoom,Gym,Offices• 15ManSatDivingSystem• TwinLARSAirDivingSystem

15

MermaidAsiana DP2SATDSV• Built2010,Panamaflag,DnV Class, SPScompliant• LOAxBreadth:90.0mx22.0m• SATsystem:300m12man• Crane:100t(50tAHC)KnuckleBoom(600mwire)• TotalBerths:100• Helipad:S61SuperPumarated• ClearDeck:680m2

• SPS2008Compliant• Seaeye TigerROV

Page 16: Mermaid Subsea (East) - Presentation 071116

ROV&AirDivingSupportVessels

A MML Group Company

MermaidSapphireDP2ROVSV/AirDiveVessel• Built:Batam 2009,Panamaflag,ABSClass,OVID• LOAxBreadth:63.0mx15.0m• Crane:23t@10mKnuckleBoom(400mwire),man-riding• TotalBerths:60• ClearMainDeck:240m2(maindeck),120m2(rovdeck)• PermanentSeaeye TigerobsROV• BuiltinQuasarCompact100hpWROV• 5DPreferencesystems(KongsbergHiPAP 500,2xDGPS,Fanbeam,

Tautwire)• BulkCement-50m3Capacity

16

Resolution DP2ROVSV/AirDiveVessel• Built:Batam 2013,Indonesiaflag,SPScompliant• Class:BKI&BV1,FiFi 1• LOAxBreadth:70.0mx16.0m• Crane:20t@6m(ConstantTension)KnuckleBoom,man-riding• 20tA-frame,AuxiliarycraneSWL3Tm• TotalBerths:60• Cleardeck:476m²maindeckarea(7.5te/m2)• BuiltinSMDQuasarCompact100hpWROV,SeaeyeTigerobsROV• 2.4mx2mMoonpool• 4x42.5m3BulkCementtanks

Page 17: Mermaid Subsea (East) - Presentation 071116

AHTS&SurveyVesselsA MML Group Company

MermaidChallenger DP1AHTS

SSBarakuda SurveyVessel

• Built:Thailand2008,Panamaflag• Class:DNV,FIFI1• LOAxBreadth:60.5mx16.0m• BollardPull:72T• TowingWinch:152TRRBrattwaag• Crane:[email protected]• TotalBerths:38• ClearDeck:390m2

• Built:Japan1982,Indonesianflag• Class:DNV910– ResearchShip• LOAxBreadth:39.0mx8.5m• 1.5tomni-directionalthruster• Variablespeed(slowmanoeuvring)• A-frame:10thydraulic(removable)• TotalBerths:30• ClearDeck:65m2

• Hydrophonemoon-pool 17

Page 18: Mermaid Subsea (East) - Presentation 071116

ObservationROVsA MML Group Company

18

Ø Max Operating Depth: 1,000mØ Tether Management SystemØ Colour & Low Light CamerasØ Super SeaKing Imaging SonarØ 4 Function ManipulatorØ Contact & Proximity CPØ Scope for Additional Accessories

Page 19: Mermaid Subsea (East) - Presentation 071116

WorkClassROVsA MML Group Company

19

Ø 100hp Work Class ROVØ Tether Management SystemØ Colour & Low Light CamerasØ Super SeaKing Imaging SonarØ 5 & 7 Function ManipulatorsØ Ethernet capabilityØ Hydraulic tooling interfaceØ 500kg payloadØ Maximum Operating Depth: 2,000m

Page 20: Mermaid Subsea (East) - Presentation 071116

AirDivingSystemA MML Group Company

20

A brand new state-of-the-art IHC Hytech ABS Classed Air/Nitrox Diving System.Ø 2 x 1800mm Containerised DDC’sØ 1 x 20ft Dive Cont. / Inspect OfficeØ 1 x 20ft Machinery Van using built in HP air banksØ 2 x Independent LARSØ Shell Compliant Diver Data Management System

Page 21: Mermaid Subsea (East) - Presentation 071116

PortableSATSystemA MML Group Company

21

Divex C300 Lloyds Classed Modular Saturation Diving SystemThe Divex C300 Saturation Diving System is purpose built to support safe and efficient offshore intervention operations. The modular 12 man system is rated to 300msw and deploys saturation divers by means of a single 3-man diving bell.

Page 22: Mermaid Subsea (East) - Presentation 071116

16ManHyperbaricReceptionFacility(HRF)

A MML Group Company

2222

FacilityNew IMCA compliant Hyperbaric Evacuation System (HES) Self Propelled Hyperbaric Lifeboat (SPHL) Life Support Package (LSP)

Page 23: Mermaid Subsea (East) - Presentation 071116

Work HistoryA MML Group Company

Our Clients

Page 24: Mermaid Subsea (East) - Presentation 071116

MERMAIDSUBSEASERVICES

Our website for more information:www.mermaid-maritime.com/moshome.php

3rd Oct 2016

24

• BS – EN – ISO 9001: 2008

• BS – EN – ISO 14001: 2004

• OHAS – 18001: 2007