Membrane solutions for LNG marine fuel overall chain
29th of September – 2017Poseidon Med II
2
This document is strictly confidential. Any unauthorised access to, appropriation of,copying, modification, use or disclosure thereof, in whole or in part, by any means, forany purpose, infringes GTT’s rights. This document is part of GTT’s proprietary know-how and may contain trade secrets protected worldwide by TRIPS and EU Directivesagainst their unlawful acquisition, use and disclosure. It is also protected by Copyrightlaw. The production, offering or placing on the market of, the importation, export orstorage of goods or services using GTT’s trade secrets or know-how is subject to GTT’sprior written consent. Any violation of these obligations may give rise to civil or criminalliability. © GTT, 2010-2017
3
Few words on GTTWho we are
Inventor of the membrane containment system 50 years ago
We provide the containment systems technology to the main shipyards building LNG Carriers
400 LNG Carriers equipped with our systems
Polar Alaska: first LNC Carrier to enter in Yokohama in 1969
Tank commissioning of a 174,000 m3 LNG Carrier
4
Inherent safety of the system1
5
Inherent safety of the system
With the increasing number of LNG propelled ships ( LNG fueled ships, bunker barges), collision must be add ressed
Collision case tested with DNV-GL, TUHH (University of Hamburg-Harburg)
Marc Van de Velde, July 2009
6
Collision simulation
Hamburg University - DNV GL - GTT cooperation programMembrane can adapt to very large deformations which could occur during a collision case without loss of tightness .
6
TUHH LAB TEST
7
Collision simulation
Test interpretation :
With 24m span, this would be equivalent to a 8m penetration of the inner hull, with NO loss of containment
In term of collision energy: ~1250MJEquivalent to a vessel of 100,000T at 9.8knots
Membrane resistance is very large, thanks to its inherent capacity for deformation (flexibility)
Therefore, the membrane can adapt to very large deformations which would occur during a collision case without loss of tightness
8
Ship to Ship transfer2
9
Ship-To-Ship transfer is not a conventional operation
Objective is to safely boost the transfer rate to reduce the duration of operation
Usual practice for some Shipowner
STS LNG Transfer - Background
© GTT
Optimization of ship to ship transfer
LNG as a Fuel market specificsScale impact : Limited capacity & limited equipment onboard
Frequency impact : LNG transfer will become a daily operation involving operators from various backgrounds
Safety issues : Zero venting policySafety and security zone
Simultaneous Operations (SIMOPS)
Courtesy of Excelerate Energy
10
GTT advises the world’s first LNG bunkering vessel, the ENGIE Zeebrugge
30 studies already performed for Ship to Ship trans fer (FSRUs, LNGC, bunkering…) for major shipowners
Unmatched experience on Ship to Ship transfer
© Engie
LNG SOURCEBUNKERING
FINAL CUSTOMER
Courtesy of Engie
11
Support on Operation3
12
LNG Training
LNG Operations courses LNGC/FSRUs
LNG as a Fuel
Beginner or advanced
Adaptable to the client’s expectations
LocationsTraining centres in Paris & HoustonOr at the client’s location
Training softwareLNG Operations simulator
For in-house training or operational research
13
24/7 emergency assistance by GTT Experts
Manage emergency situations such asGas/liquid ingress
Water detection
LNG spillage
Emergency departure
Loss of nitrogen production/cofferdam heating
Ship-specific procedures for each emergency situationBoost your emergency response with joint drills60+ vessels already affiliated since 201420+ duty officers specifically trained to manage emergency situations
14
Bunker Vessels solutions4
15
Current Features
Courtesy of « Plateforme GNL Marin et Fluvial »
LNG bunker vessel designfeatures (consequently cost)impact Logistic cost
16
LeaNG concept: how can it be possible (1/2)
Solution competitiveness
Utilization rate
Solution competitiveness
Utilization rate
Pushed barge for sheltered area with low redundancy and minimum
operational flexibility
Ocean going vessel with full redundancy able to be easily
relocated
17
LeaNG concept: how can it be possible (2/2)
Closed work with many actors such as shipyards and equipments suppliers has been a pre-requisite
Shipyards Bunker companies
LNG operators
Equipments suppliers
Outfitters
Class/AutoritiesPorts and Terminals
LNG suppliers
18
FIRST LNG Bunker Barge to Facilitate Initial Supply
Bunkering Services to TOTE’s New 3100 TEU LNG-fuele d containershipsBased on conceptual design developed by GTT2200 m³ LNG capacity
18
19
LeaNG: lean approach to match the needs at the right Capex level
LeaNG for coastal and port bunkering operationsUp to 20NM from the coast, close to LNG source
Load from LNG terminal, can feed any LNG fuelled vessel
Available from 5,000m3 to 10,000m3
6,500 m3
Lpp = 98.1 m
B = 20.7 m
Draft = 4.0 m
Speed = 10 kts
Prop : 2 azimut propellers
+ 1 bow thruster
Bunkering system : ReaCH4TM
@1200m3/h
20
Very shallow draft thanks to membrane CCSManoeuvring :
Twin propeller solution with high-lift rudders
Forward thruster with high thrust for independent manoeuvring
“Crabbing” possible if reduced tug support
Design Approved by ABS and CCSCapacities available from 6,000 m3 to 16,500 m3
Shallow Draft LNG Carrier
PROPULSION:– DF-DE or DF-M– Speed = 13 kts (@85%MCR)– Twin-screw
CARGO TANKS :– Capacity = 16,500m 3
– BOR (LNG) = 0.210%V.p.d.– 0.7 Barg
HULL :– Lbp = 126m– B = 28m– D = 11.7m– Draft = 4.8m
21
Sea Going Bunker Vessel
Sea going vesselCompatible with conventionnal LNG terminals
Can refuel small to large LNG fuelled ships: ro-pax, PCTC, container vessels, bulk carriers…
Speed and range optimised: short sea, milk running…
7,500m3 LNG bunker vessel
Lpp = 99.0 m
B = 19.2 m
Draft = 5.2 m
Speed = 15 kts
Prop: DF Diesel Mecanic prulsion, 1 CPP + 1 bow thruster
Bunkering system: ReaCH4TM
22
ONSHORE TANK SOLUTIONS TO ASSIST BUNKER VESSEL
22
23
LNG FUELLED SHIPS5
24
Ferries: Membrane volumetric efficiency illustration
24
25
Container ships: Membrane volumetric efficiencyillustration
2Engine 1 Shaped areaStraight area
Two preferable locations
Shaped areaShortest way to ER
Straight areaReduced impact on cargo capacity
26
Main takeaways
Understanding the challenges of LNG bunkering has lea d us:
Optimize bunker ship and barge solutions
Adapt our portfolio of services: training, ship to ship Transfer prediction…
Poseidon Med II ecosystem is a perfect pool of application:
High frequency of fuelling:Cargo and fuelling process optimizationVisibility issuesSafety regards
LNG source is here
LNG Market is yet to be fully explored
28
LNG Bunkering transfer system design
ReaCH4TM, LNG bunker mast by GTT
Innovative adaptation of existing system for conventional fuel
Simple and economic solution
Safe, Robust & Reliable
Quick and Easy to use