Meeting of the verdun / le sud ouest - good neighbourly relations committee - october 5 2016

52
Meeting of the Verdun / Le Sud-Ouest Good Neighbourly Relations Committee New Champlain Bridge Corridor Project Centre récréatif St-Charles– October 5, 2016

Transcript of Meeting of the verdun / le sud ouest - good neighbourly relations committee - october 5 2016

Page 1: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

Meeting of the Verdun / Le Sud-Ouest Good Neighbourly Relations Committee New Champlain Bridge Corridor Project Centre récréatif St-Charles– October 5, 2016

Page 2: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project 2

Verdun Philippe Dubeau Hubert Fortin François Labelle Seraya Speer Billy Walsh – business community

Leanne Ruberry – business community Mario Langlois – community organizations Le Sud-Ouest Nathacha Alexandroff Daniel Brasseur Sarah Chouinard Michael Ryan Wiseman – business community Marie-Josée Béliveau – community organizations Partners Dan Genest – Signature on the Saint Lawrence team Jean-François Parenteau – Verdun Borough

Benoît Dorais – Le Sud-Ouest Borough James Byrns – City of Montréal Vincent Jarry – Infrastructure Canada

Committee Members

Page 3: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

1. Discuss the work completed, underway and to come from now until January 2017

2. Follow up on the various files under the responsibility of Infrastructure Canada

3. Answer questions, identify potential solutions and discuss the issues

Meeting Objectives

3

Page 4: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Agenda

4

Series Item Duration Time 1. Opening 10 min. 7:00 to 7:10 p.m.

2. Work completed, underway and to come • Land sector • L’Île-des-Sœurs sector

40 min. 7:10 to 7:50 p.m.

3. Question period for Committee members 10 min. 7:50 to 8:00 p.m.

4. Question period for general public 15 min. 8:00 to 8:15 p.m.

5. Follow up on the various files under the responsibility of Infrastructure Canada

20 min. 8:15 to 8:30 p.m.

6. Question period for Committee members 10 min. 8:40 to 8:50 p.m.

7. Varia 10 min. 8:50 to 9:00 p.m.

8. Question period for general public 10 min. 9:00 to 9:10 p.m.

9. Adjournment: next meeting and topic 5 min. 9:10 to 9:15 p.m.

Page 5: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Work Completed over the Past Few Months Verdun / Le Sud-Ouest

Page 6: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

• Works are progressing well for the New Champlain Bridge: maritime excavation, prefabrication, installation of the footings and pier bases, and construction of the main pylon

• Partial demolition of the Highway 15S main overpasses between Atwater and the existing Champlain bridge, and beginning of the reconstruction

• Construction start in the Gaétan-Laberge sector

• Development of the structural frame of the L’Île-des-Sœurs bridge

• Relocation of the watermains well advanced

• Community BBQ of September 25 : almost 200 participants

Overview of Completed Work

6

Page 7: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

• Significant progress in terms of the road works and for the new L’Île-des-Soeurs bridge

• Some challenges ahead: watermains under the Lasalle Boul. and under

Wellington Street

• Long term disruptions of road traffic in the Gaétan-Laberge sector and on the L’Île-des-Sœurs : traffic slow down and increase of the drivers’ level of caution

Completed Work: Observations

7

Page 8: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Information Campaign for Traffic

Disruptions

Bretelle d’accès vers l’A-15 Nord

8

Extended traffic disruption as part of the reconfiguration of Gaétan

Laberge Blvd From July 2016 to July 2017

Page 9: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Complaint Management (June 11 to September 30, 2016)

9

Topic Land L’Île-des-Sœurs

Total Closed Open Total Closed Open Total

Noise 3 - 3 5 - 5 8

Air quality 4 - 4 2 - 2 6

Traffic 9 - 9 2 - 2 11

Vibrations 2 - 2 - - - 1

Brightness - - - 2 - 2 2

Other 5 - 5 - - - 5

Total 23 - 23 11 - 11 34

Number of complaints relatively stable: 10 per month on average

Page 10: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Main Priorities for the Upcoming Months Verdun / Le Sud-Ouest

Page 11: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Description of work Approximate duration

Time frame

Legend: Works and Impacts

• Traffic: • Residential proximity: • Public transit: • Active transportation:

Minor Moderate

Major

Impact by colour code

11

Page 12: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

1 2

12

Land

L’Île-des-Soeurs

Location of Sectors: Verdun / Le Sud-Ouest

Page 13: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Construction of new H15S structures, walls and roads

Overall Plan: Spring 2016 to Fall 2017

Construction of Gaétan-Laberge urban

boulevard

13

Construction of new L’Île-des-Sœurs Bridge

Dismantling of existing H15S structures, walls and roads

Construction of the L’Île-des-Sœurs new structures

Page 14: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Design and planning underway so modifications are possible

Key Activities Underway and to Come: Land

Page 15: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Objective: Widening of H15S and reconfiguration of Atwater interchange, reconstruction of overpasses Lasalle and Wellington, and construction of the new Gaétan-Laberge urban boulevard

Current and upcoming work:

• Relocation of watermains in the Atwater area • Reconstruction of Highway15S overpasses, retaining walls and roadbed

• Major reconfiguration of Atwater interchange and of Gaétan-Laberge area

Approach:

• Daytime work especially when impact is major (e.g. noise level)

• Nighttime work when impact on daytime traffic is too significant

• Weekend work when necessary

Land

15

Page 16: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Works and Impacts : Land

Widening of H15S between LaSalle and Wellington

Duration: 1 year with limited work between November and May

Time frame: May 2016 to June 2017

• Drainage work • Earthwork • Retaining walls (fall 2016) • Paving (fall 2017)

Page 17: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Works and Impacts: Land

17

Wellington

Partial construction of overpasses Duration: 7 months

Time frame: June to December

Page 18: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Works and Impacts: Land

BEFORE

AFTER

18

Reconfiguration of Atwater south interchange Duration: 1 year

Time frame: July 2016 to July 2017

AFTER

Multiple night closing 1st closing : October 17 to 19

Page 19: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Works and Impacts: Land

19

Work Status: Atwater • Partial demolition of the overpass completed • Reconstruction initiated • Girders installations (to come: closing of Atwater at nighttime) • Creation of temporary access roads (to come : November to December) • Retaining walls (to come: November to March) • Relocation of watermains underway

Page 20: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Reconfiguration of Exit 61 of H15S

20

›Bla Bla

x x x x x x x x

Reconfiguration of Exit 61 • New configuration on temporary road • Management of new intersection with traffic lights • Left turn towards the Southwest • Right turn towards Verdun • Preparation for the demolition of the existing exit

Construction Zone

Roads

Legend

Page 21: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Works and Impacts: Land

21

Work Status: LaSalle • Partial demolition of the overpass completed • Reconstruction initiated • Girders installations (to come : closing of Lasalle at

nighttime) • Relocation of the pedestal (to come: October) • Retaining walls (to come : November to March) • Relocation of watermains underway

Page 22: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Work and Impacts: Land

Work Status : Wellington • Partial demolition of the overpass completed • Reconstruction in progress • Girders installations(to come : closing of Wellington at

nighttime) • Retaining walls (to come : October to May) • Relocation of a pedestal (to come : 2 months) • Relocation of watermains underway

Page 23: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Exit 60 of H15S towards Wellington

Via-Rail Construction zone

roads

Légende

Page 24: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Works and Impacts: Land

Construction of the new Gaétan-Laberge urban Boul.

Duration: 12 months Time frame: July 2016 to end of summer 2017

24

Page 25: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Works and Impacts: Land

25

Work Status: Gaétan-Laberge • Demolition of the overpass completed • Reconstruction in progress • Relocation of watermains underway • Protection of the St-Pierre collector • Creation of temporary access roads • Retaining walls

Page 26: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Design and planning underway so modifications are possible

Key Activities Underway and to Come: L’Île-des-Soeurs

Page 27: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

L’Île-des-Soeurs

27

Objective: Construction of the New Champlain Bridge's west approach, the new L’Île-des-Sœurs Bridge and the road connecting them

Current and upcoming works:

• Construction of new L’Île-des-Sœurs Bridge south deck • Reconfiguration of overpass adjoining the new L’Île-des-Sœurs Bridge • Preparatory works at the pedestrian tunnel and at the René-Lévesque Boul. overpass • Construction of the new Champlain Bridge's west approach

Approach: • Daytime work especially when impact is major (e.g., noise level)

• Nighttime work when impact on daytime traffic is too significant

• Weekend work when necessary

• West approach: work increase in the evening and at night (approximately 20 workers) and during week-ends

Page 28: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Works and Impacts: L’Île-des-Soeurs

Construction of new L’Île-des-Sœurs Bridge Duration: 19 months

Time frame: March 2016 to September 2017

Work Status : L’Île-des-Sœurs Bridge • Pile caisson drilling and concreting (underway) • Columns and pier caps (underway) • Beginning of the deck slabs (south) installation • Transfert of the L’Île-des-Sœurs jetty at the end of the fall

Page 29: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Preparatory works at the pedestrian tunnel and at the René-Lévesque Boul. overpass

Duration : Six months Time frame: October to March

Works and Impacts: L’Île-des-Soeurs

Work Status : L’Île-des-Sœurs Bridge (continued)

• Demolition of the old tollbooth • Lane deviations in October • Relocation of public services • Pile caisson drilling of the new structures

Page 30: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project 30

New Layout of the H15 Lanes

P12 2017

P10 2016

P11 2017

P-11A

P-11B

P-11C

Page 31: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Example of Temporary Work Sign

31

Page 32: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Completed Works: West Approach

32

Temporary installations of prefabricated, preassembled and loading of the west jetty were completed

Work 24 hours per day, 7 days per week Smaller team in the evenings, and week-ends,

but effectives have doubled

Page 33: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Completed Works: West Approach

33

30 out of 38 marine excavations for the west approach were completed

Page 34: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Completed Works: West Approach

27 out of 38 footings of the west approach were concreted, and 14 of them were completed with pier starters

Page 35: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Completed Works: West Approach

35

10 out of 38 maritime footings of the west approach were installed in the river

Page 36: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project 36 36

Installation of pier starters, of pier caps and

of the deck formwork

Page 37: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Routing of Prefabricated Elements

1

2

1

3

2 2

Towards the West Jety

Route trucks

Légende

Towards the Estacade or the West Jety

3

4

Page 38: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project 38

Completed Works: Cable-stayed Bridge

Installation of the first prefabricated segments of the main pylon of the

cable-stayed bridge

Page 39: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Anticipated Impacts

Page 40: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Anticipated Impacts

• Noise

• Air quality

• Traffic

40

Page 41: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project 41

M1: Sud-Ouest / D'Argenson M2: Sud-Ouest / Butler and Charlevoix M3: Verdun I1: Sax I2: Pointe-Nord I3: Cours des Fougères

Area

Activity

Time Exposed Sensitive

Area

Ambient Noise dBA

Criterion dBA

Estimated Noise dBA

Measures Required D / E / N

Land

Road demolition D M2 64 75 66 No D M3 61 75 87 Yes

Construction of overpasses D M1 / M2 66 / 64 75 69 / 65 No D M3 61 75 83 Yes

Widening preparation work D M2 64 75 66 No M3 61 75 87 Yes

Relocation of water mains D M3 61 75 90 Yes

Construction of retaining walls J M1 / M2 66 / 64 75 To come

To come

J M3 61 75 To come

To come

Installation of beams S / N M3 60 / 59 65 / 64 To come

To come

Traffic on access road 60 J/S/N M3 61 / 60 / 59 75 / 65 / 64 To come

To come

Noise management Ambient noise levels (May 2015) / estimated (March 2016)

The new noise management plan will be submitted at the end of October. The new activities have not

been evaluated yet.

Page 42: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project 42

M1: Sud-Ouest / D'Argenson M2: Sud-Ouest / Butler and Charlevoix M3: Verdun I1: Sax I2: Pointe-Nord I3: Cours des Fougères

Area

Activity

Time Exposed Sensitive

Area

Ambient Noise dBA

Criterion dBA

Estimated Noise dBA

Measures Required

D / E / N

L’Île

-des

-Sœ

urs

West jetty – Prefabrication of footings D

I2 / I3 64 / 57 75 64

Monitoring required E 59 / 52 64 / 57 60

N 57 / 52 62 / 57 58

Construction of new L’Île-des-Sœurs Bridge D I1 57 75 63 No

Overpass reconfiguration work D I1 57 75 68 No

Drilled piles for the tunnel and for the overpass D I1 57 75 To come To come

Noise management Ambient noise levels (May 2015) / estimated (March 2016)

The new noise management plan will be submitted at the end of October. The new activities have not

been evaluated yet.

Page 43: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Air Quality Management

43

• Four stations for air quality readings

• Monitoring mainly required for demolition and earthwork

• Measures in place : Use of water cannon during the demolition of concrete structures Use of dust control liquid Stabilisation of land piles using mulching material and seeding Cleaning of streets with tank truck and mechanical street sweeper

Page 44: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Traffic

44

• Night closing to anticipate : Atwater, LaSalle and Wellington

• Modifications to road users habits from the beginning of October 2016: entrance on and exit off the existing Champlain Bridge on the L’Île-des-Soeurs

• Reconfiguration of exits 60 and 61 of H15S

Page 45: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Follow-up on Actions and Measures from Last Meeting

Page 46: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Follow-up on Interventions

46

SSL • Anti-noise barriers and landscaping : next meeting of the committee in

February 2017 • Urban integration of the overpasses: adjustments in progress • Signalization for the bike path under the Île-des-Soeurs Bypass bridge :

adjustments made

Infrastructure Canada (discussed in the next presentation) • GHG file • Possibility of a fourth lane connecting L’Île-des-Soeurs to Verdun,

on the new L’Île-des-Sœurs Bridge: analysis in progress • Interations with the REM Project

Page 47: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Follow-up on Interventions

47

Ville de Montréal • Access to the St-Lawrence River from Pointe Saint-Charles: analysis in

progress • Future of the Île-des-Sœurs Bypass Bridge: analysis in progress • Review of the mitigation measures taken by the City and other partners

to ease transportations • Impact of the exit 60 closing on the bus route 12: observations

Page 48: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Next Meeting

Page 49: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

• Good Neighbourly Relations Committee: February 8 (TBC) at Verdun Topic: anti-noise walls and landscaping

• No public information session is planned at this time

Next Meeting

49

Page 50: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

● Website: www.newchamplain.ca

● Newsletter: sign up online

● Email: [email protected]

● 24/7 phone line: 514-876-1020

Contact Us

50

@nouv_champlain

Page 51: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project

Our Proud Builders

Page 52: Meeting of the verdun / le sud ouest - good neighbourly relations committee  - october 5 2016

New Champlain Bridge Corridor Project New Champlain Bridge Corridor Project 52