Meeting Multiple Challenges: Re-Rating W. A. Parish Unit 8
Transcript of Meeting Multiple Challenges: Re-Rating W. A. Parish Unit 8
Meeting Multiple Challenges: Re-Rating W. A. Parish Unit 8
NOx and Performance Improvements at a 650 MW coal-fired electric generating unit
Derek FurstenwerthManager, Air Resources Division,
Environmental DepartmentReliant Energy
Who Are Reliant Energy and Texas Genco?
• Reliant Energy – Top 10 Generator of Electricity in US– 21,000 megawatts– Operates in 13 states– Also provides support to Texas Genco
• Texas Genco– Former HL&P power plants– 14,400 megawatts total, 12,000 in Houston area– Created as result of Texas Electric Power Industry
Restructuring– Subsidiary of CenterPoint Energy, Reliant to
purchase in 2004
W. A. Parish Station Description
• Located on a 4880 acre site near Thompsons, Tx
• Four gas-fired and four coal-fired steam generators, plus a 13 MW gas turbine generator. Total gross capacity of over 3800 MW (largest fossil plant in U.S.)
• Approximately 360 employees
W. A. Parish Station
W. A. Parish Unit Information
Gas196713GTCoal19826508Coal19805907Coal19786906Coal19776905Gas19685654Gas19612903Gas19581852Gas19581851
Primary FuelYearMWUnit
W. A. Parish Unit 8
• Emission Control Equipment– Baghouse system for particulate control– Low sulfur coal plus flue gas
desulfurization system (FGD) – Low NOx burner/overfire air system– Selective catalytic reduction (SCR)
systems under construction
What are the Challenges Facing W. A. Parish?
• Houston-Galveston SIP– Lowest Coal Unit NOx limits in nation– Cap-and-trade program
• Restructured Texas Electric Market
Why Re-rate?
• Restructured Texas Electric Market– Economics based on production– Production dispatched based on lowest
cost– W. A. Parish is low-cost power plant
• New Opportunities– Improved materials– Better efficiencies
Challenges to Re-rating or“Why doesn’t everyone?”
• New Source Review– BACT– More emission controls– Nonattainment NSR – LAER, offsets
• The Steady Downward March of NOx– NSPS, RACT, SIP Limits– Area-wide NOx reductions – 88% reduction by
2004– More emission controls
» Meeting Multiple Challenges - One stone, two birds
The Steady Downward March of NOx
•WAP 5 – 8 Coal Fired Regulatory NOX
Limits
0.7
0.50.41
0.150.04
00.10.20.30.40.50.60.70.80.9
1
NO
x lb
/MM
Btu
WAP 5-7Permits(1977)
WAP 8Permit(1979)
NOx RACT(1999)
EPA NSPS(1998)
TNRCC SIP(2004)
Regulatory Limits
Current WAP Operating Levels (0.15-0.20)
W A Parish Coal Unit Regulatory NOX Limits
0.5
0.38
0.150.045 0.03
00.10.20.30.40.50.60.70.80.9
1
NO
x lb
/MM
Btu
WAP 8Permit(1979)
NOx RACT(1999)
EPA NSPS(1998)
TCEQ SIP(2004)
WAP SCRDesign
Regulatory Limits
2002 W A Parish NOx Emissions (0.155)
Meeting Multiple Challenges –Re-rating Unit 8
• Increase Production Capacity– 10% Increase – from 590 to 650 MW– Improved efficiency
• New Source Review– No significant increase in NOx, SO2, or VOC due
to emission controls – No NSR or NSPS– PSD for CO, PM10, H2SO4 and Fluoride
• Existing equipment determined to represent BACT
• SIP Compliance– SCR under construction
• Operational by end of 2003• Lowest NOx coal plant in country
W. A. ParishEmission Control Equipment
• Baghouse systems for fly ash removal– Utilize fiberglass bags to
trap fly ash– >99.9% removal efficiency
Unit 5 Baghouse contains ~15,000 bags
W. A. ParishEmission Control Equipment
• Flue Gas desulfurizationsystem (FGD) for SO2 removal on Unit 8
– Spray tower design– Limestone slurry reagent– SO2 removal of ~80%
Unit 8 FGD System
W. A. ParishEmission Control Equipment
• NOx Reduction– Advanced LNB/OFA
systems installed on all coal units
• 1st commercial installation of AlstomLNB/OFA system guaranteed to meet 0.15 lb/MMBtu
• 50%-60% NOx reductions achieved
W. A. ParishEmission Control Equipment
Low NOx design of the Unit 7 & 8 TFS 2000 System
Air injected in theburnout zone
Fuel and air injected in thecombustionzone
P2tm Coal LNB Nozzle Tip
LNB Installation
W. A. ParishEmission Control Equipment
Coal unit SCR'sunder construction– Vanadium-
titanium catalyst– Aqueous NH3
reagent– 80-85% reduction
to meet 0.03 lb/MMBtu
W. A. Parish Unit 8 SCR Retrofit
Fabric Filter
SCR Boiler
FGD
Texas Coal-fired Unit NOx Rates (2001)
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
Pirk
ey 1
Lim
esto
ne 1
San
Mig
uel 1
Wel
sh 2
Sam
Sey
mou
r 3
Big
Bro
wn
2
Sam
Sey
mou
r 2
Sand
ow 4
Sam
Sey
mou
r 1
Har
ringt
on S
tatio
n 1
Mon
ticel
lo 1
Okl
auni
on 1
Har
ringt
on S
tatio
n 1
Mar
tin L
ake
1
Tolk
Sta
tion
1
Mon
ticel
lo 2
Tolk
Sta
tion
2
Mar
tin L
ake
3
Wel
sh 1
Col
eto
Cre
ek 1
Har
ringt
on S
tatio
n 3
Big
Bro
wn
1
Lim
esto
ne 2
Gib
bons
Cre
ek 1
J T
Dee
ly 1
J T
Dee
ly 2
Mon
ticel
lo 3
TNP
2
Mar
tin L
ake
2
Wel
sh 3
TNP
1
W A
Par
ish
5
W A
Par
ish
6
J K
Spr
uce
1
W A
Par
ish
8
W A
Par
ish
7
WA
P SC
R D
esig
n
NO
x R
ate
(lb/M
MB
tu)
W. A. Parish Unit 6 SCR Construction (May , 2000)
W. A. Parish Unit 6 SCR Construction (July, 2002)
W. A. Parish Unit 5 SCR Construction (July, 2002)
W.A.Parish Unit 8 SCR Construction (April, 2001)
W. A. Parish Unit 6 Catalyst Loading (July, 2002)
W. A. Parish Unit 6 Catalyst Loading
W. A. Parish Ammonia Tank Farm
W. A. Parish Unit 6 NH3 Injection Nozzles
W. A. Parish Unit 6 NH3 Mixer
Meeting Multiple Challenges –Review
• Increased Production Capacity– 10% Increase – from 590 to 650 MW– Improved efficiency
• Reduced Emissions– SCR under construction
• Cleanest coal plant in country• NOx to 0.03 lb/mmBtu design value
Questions and Answers