Measurement & Analysis TeamLean Sigma Project
Derek HallFahad TaimurJanat AlHashmiNoah ZayedYousef Alnemer
![Page 2: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/2.jpg)
CustomersHQPower
Plant
Process
Water Source
Power Transmission
Water Loss:Waste
Transmission Loss: Waste
Power Loss:Waste
Fluid Transportation: Excess Cost
VISUAL STREAM MAP
![Page 3: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/3.jpg)
CustomersHQPower Plant
ProcessWater Sourc
e
Power Transmission
Water Loss:Waste
Transmission Loss: Waste
Power Loss:Waste
Fluid Transportation:
Excess Cost
ANALYSIS OF VSM
![Page 4: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/4.jpg)
• Working fluids are typically a valuable resource that is wasted in the geothermal power generation process.
• The working fluid needs to be purchased in order to accommodate those losses.
• If the geothermal power generation process takes place in arid regions, then the losses in water can become very costly.
Background Issue & Cost
![Page 5: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/5.jpg)
SIPOC DIAGRAM
![Page 6: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/6.jpg)
CAUSE AND EFFECT DIAGRAM
![Page 7: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/7.jpg)
A3 FORM
• Issue: Working fluids are typically a valuable resource that is wasted in the geothermal power generation process.
• Background and Cost: 5-10% of the working fluid (water) is lost in the underground reservoir. Typically, the working fluid needs to be purchased in order to accommodate those losses.
• Current State: If the geothermal power generation process takes place in arid regions, then the losses in water can become very costly.
![Page 8: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/8.jpg)
A3 FORM CONTINUED
Goals and Targets: · To reduce the cost associated with the purchasing more working fluid.· To locate a cheaper working fluid that can satisfy the needs of the process.
![Page 9: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/9.jpg)
A3 FUTURE STATE
![Page 10: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/10.jpg)
COST & BENEFITS (ROI)
Implementation Cost: Cost of building a IGCC (Integrated gasification
combined cycle) power plant Cost of building a Geothermal power plant
Implementation Benefit: Government pays you for having zero carbon emissions
($50 million grant) Reduced cost of fluid transportation Fluid loss in reservoir is no longer an expense More sustainable Environmentally friendly
![Page 11: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/11.jpg)
LESSONS LEARNED Waste as ResourceCarbon dioxide is considered to be a
detrimental substance to the environment, and in most cases, it is wasted. By using it, we make efficient use of waste and decrease the environmental damage.
PartnershipOne of our ideas is to make partnerships with
coal companies to make use of their waste. What can be learned from this idea is that partnership can be a very efficient way to solve problems.
![Page 12: Measurement & Analysis Team Lean Sigma Project Derek Hall Fahad Taimur Janat AlHashmi Noah Zayed Yousef Alnemer.](https://reader035.fdocuments.us/reader035/viewer/2022070414/5697c0091a28abf838cc7063/html5/thumbnails/12.jpg)
ANY QUESTIONS?
For more information about the Measurement & Analysis team project, visit nittanylearning.com/409