The ContextWhy data is important

Page 3: M&e swg-presentation

JSS Enrollment and BECE Results

EDUCATION QUALITY

Page 4: M&e swg-presentation

JSS Enrollment and BECE Results

Page 5: M&e swg-presentation

BECE and Student/Teacher Ratio

Page 6: M&e swg-presentation

The Challenge Data is not being effectively utilised

for planning and M&E

Page 7: M&e swg-presentation

Parallel District Data Systems

Implement System

Implement System

New System

New System

Externally Driven

Not Sustained

New System

Page 8: M&e swg-presentation
Page 9: M&e swg-presentation
Page 10: M&e swg-presentation
Page 11: M&e swg-presentation

A Way ForwardCoordinated and Integrated Approach

Page 12: M&e swg-presentation

Data Use in Planning and M&E

Medium Term Development

Plan

Annual Action Plan

Plan Implementation

District Data

Plan M&E

Trending Indicators

Activity Prioritization

1. Indicator Database

2. Project Monitoring Database

Page 13: M&e swg-presentation

COMMUNITY POPULATION# OF

BOREHOLESWATER

COVERAGE

N-NALOG 654 0 0%

KPEIGU 755 1 40%

NAMOR 123 2 488%

NANYENI 345 0 0%

Page 14: M&e swg-presentation

COMMUNITY POPULATION# OF

BOREHOLESWATER

COVERAGE

FAILED BOREHOLE ATTEMPTS

N-NALOG 654 0 0% 4

KPEIGU 755 1 40% 1

NAMOR 123 2 488% 2

NANYENI 345 0 0% 0

Page 15: M&e swg-presentation

COMMUNITY POPULATION# OF

BOREHOLESWATER

COVERAGE

FAILED BOREHOLE ATTEMPTS

GUINNEA WORM CASES

N-NALOG 654 0 0% 4 0

KPEIGU 755 1 40% 1 30

NAMOR 123 2 488% 2 0

NANYENI 345 0 0% 0 0

Page 16: M&e swg-presentation

Coordinated and Integrated Approach

Take into consideration Functionality, Capacity, Flexibility at each level

Build from and integrate existing systems Take the time pilot different approaches