CONTRACT MINE SUPPORT CAPABILITY Delivering underground infrastructure FORMATION OF McCONNELL DOWELL MASTERMYNE JOINT VENTURE; COLLABORATION AND INNOVATION FOR THE UNDERGROUND COAL SECTOR

Transcript of McConnell Dowell Mastermyne - Made to Mine

Page 1: McConnell Dowell Mastermyne - Made to Mine

CONTRACT MINE SUPPORT CAPABILITYDelivering underground infrastructureFORMATION OF McCONNELL DOWELL MASTERMYNE JOINT VENTURE; COLLABORATION AND INNOVATION FOR THE UNDERGROUND COAL SECTOR

Page 2: McConnell Dowell Mastermyne - Made to Mine

MORE THAN JUST A MINING CONTRACTORMcConnell Dowell & Mastermyne have formed a highly capable team to enable the delivery of the underground infrastructure including the Cut & Cover, Drift Driveage and Ancillary Works.

Page 3: McConnell Dowell Mastermyne - Made to Mine
Page 4: McConnell Dowell Mastermyne - Made to Mine

McConnell Dowell and Mastermyne have formed a highly capable team of delivering underground infrastructure to the mining industry. This Joint Venture has been ‘Made-to-Mine’.

The McConnell Dowell and Mastermyne Joint Venture (MDMJV) unites the respective strengths of two of Australia’s strongest and most capable underground contractors from the civil infrastructure and coal mining sectors, forming arguably the most robust delivery team for “mine-to-market” projects.The McConnell Dowell Mastermyne Joint Venture provides resource owners and developers a total mine solution. Feasibility through to market delivery, we have the depth and capacity to offer all disciplines.MDMJV will provide the necessary step to change the underground coal sector for the safe and efficient delivery of mine access drives using rapid advance, full face tunnelling technology. This would in turn make resource access more efficient, cheaper, and safer. Our international and domestic workforces continue to show steady growth, with more than 10 000 staff combined and all with one culture and goal – to ensure we remain at the forefront.

Our people represent the best and brightest in their fields. We’re proud of the passion and success of our teams in striving to be the industry leaders, and it shows in our individual results – as a Joint Venture we are even more formidable.Our fundamental philosophy of finding creative solutions to engineering and construction challenges for clients has never changed, with ongoing relationships with our clients being one of our key strategies. We each have a track record of building long-term relationships with both national and international clients, which is testament to our innovative and client-focused capability.We believe that our Joint Venture is capable of providing superior advance rates and a safe work system within a fully compliant framework. This methodology will significantly change the face of Australian coal mines. It will enable a lower cost per unit of coal from underground mines, and through the use of innovation will reduce the number of people required to work underground.

1. WHO WE ARE

Long term relationship with tier 1 mining companies

Length of contract relationship (years)

2 4 6 8 10 12 14

VALE

BMA

BHP BILLITON

RIO TINTO

ANGLO AMERICAN

XSTRATA

Page 5: McConnell Dowell Mastermyne - Made to Mine

2. MDMJV GROSVENOR COAL MINE TBM DRIFT WORKS CLIENT

LOCATION VALUE START DATE END DATE

ANGLO AMERICANGROSVENOR COAL MINE, QLDAUD 12MMARCH 2015OCTOBER 2015

7PEAK STAFF

284,000 m3

13,500 t

PEAK LABOUR

TOTAL CONCRETE

PRECAST

The McConnell Dowell and Mastermyne Joint Venture (MDMJV) unites the respective strengths of two of Australia’s strongest and most capable underground contractors from the civil infrastructure and coal mining sectors, forming arguably the most robust delivery team for “mine-to-market” projects.

MDMJV Project Team were recognised for their safety record and management record during the course of the project. AngloAmerican approached McConnell Dowell Mastermyne (MDMJV) early 2015 to complete the TBM Drift works for Grosvenor Coal Mine.

The work scope included the following:• Installation of Drift Floor within Conveyor (CV) and Men

and Materials (MM) Drifts• Excavation and Shotcrete of Man Refuges• Installation and Commissioning of Blast Doors for CV and

MM Drifts• Installation of LED Lighting within CV and MM Drifts• Completion of Surface Portal Works at CV and MM

Portals• Concrete Ramp Pours at Pit Bottom from Installed Floor

Segments to Mine Pits• TBM Drift Fit-out works • Surface TBM Portal works including concrete ramp

construction, surface sump

MDMJV as a team brought the following value as a whole to the Grosvenor Coal Mine project:SCHEDULE OPTIMISATION

Started with 43 week programme and completed core work in 28 weeksPROCUREMENT OPTIMISATION

Smarter solutions proposed by the team saved Anglo significant costsQUALITY OUTCOMES

With systems and process the quality of work produced, with supporting documentation, was of the highest order. COLLABORATION

Having combined civil and mining skills, within the Anglo office, made for a dynamic and positive culture of a high performing team.

MDMJV worked closely with Anglo American to obtain all approvals and to ensure all management plans were implemented

without delaying construction programme.

Page 6: McConnell Dowell Mastermyne - Made to Mine

3. MCCONNELL DOWELL TUNNEL & UNDERGROUNDOur tunnelling capability is unrivalled. More than 30 years’ experience, the delivery of 140 km of tunnels, and over 4 million tonnes of materials moved: this is the McConnell Dowell difference.

550,000m3BULK EXCAVATION

32 kmPIPEWORK

800,000m3

80,000m3

25,000 m2

600 km

64

100,000 m322 km

TUNNEL SPOIL

STRUCTURAL CONCRETE

BRIDGES

CABLING

JET FANS

TUNNEL LINING CONCRETE(24,000 SEGMENTS)

ROAD BARRIERS

Bogong Power Development Project

Mandalong Coal, Delta Decline

PROJECT SUMMARY:

The Bogong Power Development Project, awarded to McConnell Dowell by AGL Southern Hydro in September 2006, consists of a network of tunnels and shafts and the construction of a new underground hydro electric power station near the Victorian ski fields at Falls Creek. The power station forms part of AGL Southern Hydro’s strategic energy framework for the supply of green peak demand power. It harnesses the Rocky Valley and Pretty Valley branches of the East Kiewa River and existing water resources released from the Mackay Creek Power Station to generate 140MW of renewable power.

The construction of the underground power station included the excavation of the station box, a top down excavation utilising secant pile walls, rock anchors and excavation in rock to 25 m below the ground. The massive box was created from which 30,000 cubic metres of material was excavated,

and the power station structure required over 10,000 cubic metres of concrete.

Pivotal to the success of the power station is the co-ordination of the crucial mechanical equipment including turbines, generators, draft tubes and inlet valves and scroll casings. These massive individual pieces require installation as the power station is constructed from the depths of the excavation.

CHALLENGES

Being constructed in an alpine national park meant the project was highly scrutinised by AGL Southern Hydro and the EPA – and the results were exceptional. To quote AGL Southern Hydro’s Project Manager John Arnold: “The statutory authorities cannot speak highly enough about the work done by McConnell Dowell. The work they are doing is being used as a benchmark for future projects.”

3 6.5km of 5m diameter hardrock TBM tunnel;

3 1.3km of drill and blast tunnels;3 250mof5mdiametershafts;3 5,000 ton penstock liners.

KEY FACTS

CLIENT LOCATION CONTRACT VALUE START DATE END DATE

CLIENT LOCATION VALUE START DATE END DATE

AGL SOUTHERN HYDROBOGONG, VICTORIA, AUSTRALIADESIGN AND CONSTRUCTAUD 180MASEPTEMBER 2006NOVEMBER 2009

CENTENNIAL COALNEWCASTLE, NEW SOUTH WALESAUD 14MAPRIL 2004SEPTEMBER 2005

This project required the excavation of a 6 m x 2.6 m decline, on a site that consisted of conglomerate and sandstone ranging up to 140 MPa in hardness.

McConnell Dowell employed a unique blast and drill option to meet the challenge.

A completely pneumatic system avoided the procurement risks presented by the flame-proofed electrical equipment and permanent

gas monitoring systems traditionally used within a decline.

The roof support crawler rig, custom

designed and built as part of the project, was the first of its kind in the world.

The project was awarded to McConnell Dowell by Centennial Coal and was completed within 18 months.

Page 7: McConnell Dowell Mastermyne - Made to Mine

Mastermyne commenced its first development contract 14 years ago

at the Kestrel North Mine in Central Queensland. Since that initial project,

we have driven more than 200 km of roadways on 12 sites across

Queensland and New South Wales.

MORANBAH

NORTH MIN

E

KESTREL MIN

E

EXPANSION

KESTREL

DENDROBIUM

300

250

200

150

50

100

Best Performance

Weekly Average

MPOH3.90

MPOH3.00

MPOH2.90

MPOH1.90

Averageuptime

60.50

Averageuptime

56.00

Averageuptime

56.00

Averageuptime

85.00

During 2012 Mastermyne

completed more than 1,000,000

man hours in development

works.

DEVELOPMENT STATISTICS

OUR OPERATIONAL CULTURE• Positive and supportive interaction

between supervisors and employees• No barriers between workforce and

management• Relevant communication with crews at

start of shift, during work and a debrief by supervisors at the end of each shift

• Compliance and standards are mandatory• Crews are managed by interaction,

motivation, review and a consistent and fair disciplinary procedure

• Management are required to get out of the office and into the workplace

• Planning for each task is critical• We set realistic goals and beat them• We take pride in our reputation as one of

the country’s leading underground coal roadway development contractors

• Site teams sequence, plan and execute with a high degree of accuracy and compliance

• Our service is backed up with strong systems around planning, maintenance and reporting

• We have the right development equipment including; 3 Continuous Miners, shuttle cars, breaker feeders and electrical equipment.

MORANBAH NORTH

DENDROBIUM KESTREL KESTREL MINE EXTENSION

236 metres average rate 170 metres average

rate

160 metres average rate (gateroad) 285

795

3.99,938

best weekly metres 268 best weekly

metresmonthly average metres

m/operating hour average

2.9 m/operating hour average

3.0 m/operating hour 3.0 m/operating hour average

metres driven in FY2014

1,272 best monthly metres

4,451 6 months drivage100 cut hours achieved (119 hours peak)

219795

best weekly metres

best monthly metres

4. EXPERTS IN DEVELOPMENT SERVICES

Page 8: McConnell Dowell Mastermyne - Made to Mine

5. OUTBYE SERVICES EXPERIENCE

Mastermyne currently undertakes strata control

support on 15 workfronts

Mastermyne is one of the leading installers of secondary support in Australian coal mines. This includes the installation of: • Strata support such as, mega bolts, hi

tens, cable bolts, roof bolts, rib bolts, meshing and shotcrete

• Quality controlled and well developed tracking systems

• Significant experience in fall recovery• Specialised equipment to support

secondary support work, air tracks, QDS bolters and hand held equipment

Mastermyne is a specialist in all forms of outbye services including • Roadworks;• Pumping;• Conveyor maintenance, and • Service extension/

retractions.

OUTBYE EXPERIENCE

SECONDARY SUPPORT EXPERIENCE

SECONDARY SUPPORT EXPERIENCE

Client Site Scope of Services

BMA Crinum

Road works, transportation of supplies and materials, stone dusting, cleaning, concrete works, water control and pipe work.

BHP Dendrobium

Concrete works, road works, transportation of supplies and materials, stone dusting, cleaning, conveyor maintenance, water control and pipe work, sump construction and cable recovery.

BHPWest Cliff and Appin Area 9

Concrete works, road works, transportation of supplies and materials, stone dusting, cleaning, conveyor maintenance, water control and pipe work, sump construction and cable recovery.

Rio Tinto

Kestrel South

Road works, transportation of supplies and materials, stone dusting, cleaning, conveyor maintenance, water control and pipe work.

15DENDROBIUM

2014

KESTREL MINE EXPANSION

PROJECT

WESTCLIFF 2014

2,8872.4m roof bolt

6,0008m Megabolts

10,3538m Megabolts

1,3731.8m rib bolt

35,700galvanised high tensile roof bolts

2991.8m roof bolt

12,000rib bolt

518Burrell support can

MORANBAH NORTH workfronts3

GROSVENORworkfronts2

DENDROBIUMworkfronts4

WEST CLIFF / AREA APPIN 9 workfronts4

KESTRELworkfronts2

Mastermyne’s current strata control workfronts

We have performed these services at many mines throughout QLD and NSW.

Mastermyne has developed an ISO9001 Quality Management System targeting our Polymeric Chemical processes and certification was obtained with SAI Global on 1 September 2014. This certification complements our existing AS4801 and ISO14001 certifications that cover the entire business including the Polymeric Chemical activities. Formal licensing to carry out Polymeric Chemical work in NSW coal mines was obtained in December 2014. Current licensed products include Strata Bond and Mineral Bond.

Working closely with our partners including Orica, DSI and BASF to offer a range of different products.

We are currently mobilising to complete strata injection around Wambo North’s longwall 10, 50psi seals.

STRATA SUPPORT INJECTION PRODUCTS (PUR)

Page 9: McConnell Dowell Mastermyne - Made to Mine

Mastermyne have recently undertaken planning, coordination, supervision and execution of civil, electrical and mechanical works for Conveyor projects on the following sites:

MORANBAH NORTH

15.3kmsof conveyor

structure installed

Inclusive of 601 Long wall conveyor, main gate 109 longwall development conveyor main gate 111 development conveyor, UC 110 development conveyor, main gate 202 conveyor, main gate 203 conveyor, main gate 204 conveyor and main gate 108 conveyor. Average performance 1 month after handover of these conveyors was 99%.

15.6kmsof conveyor

structure removed

Inclusive of 601 Longwall conveyor, main gate 109 longwall development onveyor, main gate 202 conveyor, main gate 203

conveyor, main gate 204 conveyor and main gate 108 conveyor.

90,000 hours worked on the Moranbah North site for conveyor installations, removals, extensions and upgrades over the past 5 years

KESTREL MINE EXPANSION

1400 cubic metres of concrete placedIncluded sumps, conveyor drive base, foundations, roadways and general concrete works.

7.5kmsof conveyor

structure installed

Included Main trunk conveyor, MG401 development, MG401 production, MG402 development and 3 Jiffy conveyors.

8.2kmsof conveyor

structure removedIncluded MG401 development, B-Heading conveyor and Jiffy conveyors.

8.5kmsof pipe work installation

Included 6’ and 8’ pipe, valving, droppers, services points, air, water and de-watering, and pressure reducing stations.

10kmsof tube bundles

Completed installation in both drifts and pit bottom, plus commissioning.

NORTH GOONYELLAGeneral conveyor installation works including longwall development and production conveyors.

KESTREL NORTH

Long wall conveyor installation and conveyor extension and retractions.

CRINUMMaingate installations and extensions, life of mine in pit and ramp conveyor installations.

Up-grade of UC002

trunk conveyor

Truck conveyor capacity increased from 4000 to 6000tph, inclusive of drive up-grades, drive pulley and snub pulley replacement and jib replacement with new de-watering unit. Performance 1 month after handover was 95.86% LTU mobile carriage pulley upgrade, installed dewater chutes at tripper locations.

Extension of UC003

trunk conveyor

Including recovery of Jiffy & combi drives, road and concrete works, bolting and meshing, installation of transfer station for MG110 and hanging structure for life of mine trunk conveyor. Performance 1 month after handover was 97.36%.

Across QLD and NSW Underground Mines Mastermyne has installed over

300 trunk, maingate, development and drift conveyors.

BROADMEADOWSMultiple maingate removal and install and commission.

KESTREL SOUTHMaingate removals and installations, Trunk belt retractions/extensions.

CARBOROUGH DOWNS

Development conveyor installations and removals, longwall conveyor installations and removals, trunk conveyor extensions.

OAKY NORTH & NORTH 1

Development conveyor removals, longwall conveyor installations including drive heads and Trunk conveyor extensions.

6. EXTENSIVE CONVEYOR EXPERIENCE

Page 10: McConnell Dowell Mastermyne - Made to Mine
Page 11: McConnell Dowell Mastermyne - Made to Mine

McCONNELL DOWELL MASTERMYNE GROUP LIMITED

CONTACTS

Postal:Mastermyne Pty LtdPO Box 1671Mackay QLD 4740

Postal:McConnell Dowell Constructors (Aust) PtyPO Box 6065Hawthorn West VIC 3122

Business:Mastermyne Pty LtdLevel 1 Riverside Plaza45 River StreetMackay QLD 4740

Business:McConnell Dowell Constructors (Aust) PtyLevel 3109 Burwood RoadHawthorn West VIC 3122

e:t:f:

[email protected](07) 4963 0400(07) 4944 0822

e:t:f:

[email protected](03) 9816 2400(03) 9818 3553

ABN: 71 069 346 247www.mastermyne.com.au

ABN: 71 002 929 017www.mcconnelldowell.com

Daniel Rye Tender Managere: [email protected] m: 0429 361 605

David Sibthorpe Manager - Mining Applicationse: [email protected] m: 0488 544 006