MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco...

31
Building Design & Construction CITY & COUNTY OF SAN FRANCISCO DEPARTMENT OF PUBLIC HEALTH MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CIVIC DESIGN REVIEW - PHASE 3 : JUNE 25, 2018

Transcript of MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco...

Page 1: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Building Design & Construction

CITY & COUNTY OF SAN FRANCISCODEPARTMENT OF PUBLIC HEALTH

MAXINE HALL HEALTH CENTERRENOVATION AND SEISMIC UPGRADE

CIVIC DESIGN REVIEW - PHASE 3 : JUNE 25, 2018

Page 2: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 20182

Building Design & Construction

MAXINE HALL HEALTH CENTERRENOVATION AND SEISMIC UPGRADE

CDR PHASE 2 COMMENTS (11/27/2017)

Motion to approve Phase 2 of the Maxine Hall Health Center Renovation and Seismic Upgrade Project contingent upon:

1. Including a plaque which describes the artwork and reproduction2. Moving forward with Option 1 of the Graphic Wall3. Painting the handrails4. Moving forward with the preferred option of clear anodized aluminum window detailing for the shotcrete wall5. Integrating the Committee’s planting suggestions.

Page 3: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 20183

Building Design & Construction

MAXINE HALL HEALTH CENTERRENOVATION AND SEISMIC UPGRADE

REVISIONS AFTER CDR 2 (11/27/2017) APPROVAL1. South Elevation Graphic Wall : We are proposing a minor revision to the Graphic Wall; The concrete shear wall is now moved to the interior of the building, allowing the exterior plane of the graphic wall to be set back from the surrounding concrete frame in keep-ing with the existing historic facade. (Revision per Historic Preservation planning recommendation)

2. East Elevation : East elevation changed back to the proposed CDR 1 (6/19/2017) design:Historic Preservation Planning recommended that the proposed new window design be consistent with the existing historic character; with clear anodized aluminum frames and similar proportions. The concrete shear wall at the east facade was pushed back to distinguish the existing frame which is considered a character-defining feature. (Revision per Historic Preservation Planning recommendation)

3. Handrail/Guardrail at East Front Entry: We are proposing a redesigned handrail at the front entry ramp to allow for better visibility to the ceramic tile mu-ral. (Revision per CDR Phase 2 comments)

4. Entry Ramp:In order to meet ADA requirements, the front entry ramp itself has been modified and extended. (Revision as required per separate Mayor’s Office on Disability (MOD) project - Previously approved and permitted: Permit number 2016-1222-5776)

Page 4: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 20184

Building Design & Construction

MAXINE HALL HEALTH CENTERRENOVATION AND SEISMIC UPGRADE

REVISIONS AFTER CDR 2 (11/27/2017) APPROVAL

5. Plaque for Art Wall : We are proposing the Plaque describing the artwork and reproduction be located at south-east corner of building. (Revision made per CDR 2 comment)

6. Landscape : We are proposing a revised planting scheme (Revision made per CDR 2 comment)

Page 5: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 20185

Building Design & Construction

PROPOSED SHOTCRETE WALL LOCATIONS

PIER

CE

STR

EET

PRIVATE AND GATED

PARKING LOT

ELLIS STREET

SOUTH ELEVATION SHOTCRETE WALL

EAST ELEVATION SHOTCRETE WALL

SOUTH ELEVATION SHOTCRETE WALL

EAST ELEVATION SHOTCRETE WALL

SOUTH ELEVATION SHOTCRETE WALL

EAST ELEVATION SHOTCRETE WALL

Page 6: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 20186

Building Design & Construction

1. South Elevation Graphic Wall : We are proposing a minor revision to the Graphic Wall; The concrete shear wall is now moved to the interior of the building, allowing the exterior plane of the graphic wall to be set back from the surrounding concrete frame in keeping with the existing historic facade. (Revision per Historic Preservation planning recommendation)

Subject - South Elevation Graphic Wall

Page 7: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 20187

Building Design & Construction

SOUTH ELEVATION - GRAPHIC WALL (CDR PHASE 2 APPROVED)

EXISTING WALL TILE AT ENTRANCE

PRECEDENT - RESIN IMPREGNATED PANEL

SOUTHEAST CORNER

Page 8: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 20188

Building Design & Construction

SOUTH ELEVATION - GRAPHIC WALL (NEWLY PROPOSED)

EXISTING WALL TILE AT ENTRANCE

PRECEDENT - RESIN IMPREGNATED PANEL

SOUTHEAST CORNER

WALL PUSHED BACK

DISTINGUISH FRAME AND ART WALL BY PUSHING BACK ART WALL

Page 9: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 20189

Building Design & Construction

SOUTH ELEVATION GRAPHIC PANEL LAYOUT (CDR PHASE 2 APPROVED)Scale: 1/4” = 1’

+150.84'

TOP OF CONC. BEAM

+137.33

TOP OF STRUC. CONC.

+124.83

TOP OF STRUC. CONC.

(E) CONC. COLUMN

EXTERIOR SOLIDPHENOLIC CLADDINGPANEL: 3/8" THK SOLIDPHENOLIC PANEL ONCONCEALED FASTENER

16'-0"

EQ EQ EQ EQ

24'-8

"

EQEQ

EQEQ

EQ

Page 10: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201810

Building Design & Construction

SOUTH ELEVATION GRAPHIC PANEL LAYOUT (NEWLY PROPOSED)Scale: 1/4” = 1’

1 1/2” GAP ADDED TO DISTINGUISH FRAME AND ART WALL

1 1/2” GAP ADDED TO DISTINGUISH FRAME AND ART WALL

Page 11: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201811

Building Design & Construction

WALL SECTION AT GRAPHIC PANEL (CDR PHASE 2 APPROVED)Scale: 3/16” = 1’

SILL DETAILScale: 3” = 1’

HEAD DETAILScale: 3” = 1’

JOINT DETAILScale: 3” = 1’

+149.75'

TOP OF STRUC. CONC.

+137.33

TOP OF STRUC. CONC.

+124.83

TOP OF STRUC. CONC.

EXTERIOR SOLIDPHENOLIC CLADDINGPANEL: 3/8" THK SOLIDPHENOLIC PANEL ONCONCEALED FASTENER

(E) CONC. BEAM

(N) SHOTCRETESHEAR WALL

(N) SHOTCRETESHEAR WALLSEE STRUCT DWGS

(E) CONCRETEWALL

(N) SHOTCRETE WALL

EXPOSED EDGE

PANEL CLIPPANEL FASTENER

1 1/2"

(E) STRUCTURE

EXTERIOR SOLID PHENOLICCLADDING PANEL 3/8"

2"

WALL FASTENER

PANEL FASTENERPANEL CLIP

(N) SHOTCRETE WALL

EXTERIOR SOLID PHENOLICCLADDING PANEL 3/8"

5/16

1"

1 3/8"

PANEL CLIPPANEL FASTENER(N) SHOTCRETE WALL

EXTERIOR SOLID PHENOLICCLADDING PANEL 3/8"

BOTTOM ALIGN WITH TOP OFPLANTER BOX

1 3/8"

TOP OF PLANTERBOX BEYOND

GM FLASHING

TOP OF SOIL

Page 12: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

WALL FASTENER

PANEL FASTENERPANEL CLIP

(N) SHOTCRETE WALL

EXTERIOR SOLID PHENOLICCLADDING PANEL 3/8"

5/16

1"

1 3/8"

PANEL CLIPPANEL FASTENER(N) SHOTCRETE WALL

EXTERIOR SOLID PHENOLICCLADDING PANEL 3/8"

BOTTOM ALIGN WITH TOP OFPLANTER BOX

1 3/8"

TOP OF PLANTERBOX BEYOND

GM FLASHING

TOP OF SOIL

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201812

Building Design & Construction

WALL SECTION AT GRAPHIC PANEL (NEWLY PROPOSED)Scale: 3/16” = 1’

SILL DETAILScale: 3” = 1’

HEAD DETAILScale: 3” = 1’

JOINT DETAILScale: 3” = 1’

WALL PUSHED BACK& SHEAR WALL MOVED INSIDE

Page 13: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201813

Building Design & Construction

2. East Elevation : East elevation changed back to the proposed CDR 1 (6/19/2017) design:Historic Preservation Planning recommended that the proposed new window design be consistent with the existing historic character; with clear anodized aluminum frames and similar proportions. The concrete shear wall at the east facade was pushed back to distinguish the existing frame which is considered a character-defining feature. (Revision per Historic Preservation Planning recommendation)

3. Handrail/Guardrail at East Front Entry: We are proposing a redesigned handrail at the front entry ramp to allow for better visibility to the ceramic tile mural. (Revision per CDR Phase 2 comments)

4. Entry Ramp:In order to meet ADA requirements, the front entry ramp itself has been modified and extended. (Revision as re-quired per separate Mayor’s Office on Disability (MOD) project - Previously approved and permitted: Permit num-ber 2016-1222-5776)

Subject: East Elevation

Page 14: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201814

Building Design & Construction

EAST ELEVATION DESIGN OPTIONS

EAST ELEVATION AND ENTRANCE - EXISTING

Page 15: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201815

Building Design & Construction

EAST FACADE - STUCCO AND CLEAR ANODIZED ALUMINUM WINDOW

EXTENT OF WORK

EAST ELEVATION AND ENTRANCE - (CDR PHASE 2 APPROVED)

EXTENT OF WORK

EAST ELEVATION AND ENTRANCE - (NEWLY PROPOSED)

WINDOW SHAPE & SIZE TO BE CONSISTENT WITH EXISTING WINDOWS

HANDRAIL/GUARD RAIL REVISIONPART OF MAYOR’S OFFICE ON DISABILITY PROJECT

Page 16: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201816

Building Design & Construction

EAST ELEVATION AND ENTRANCE (CDR PHASE 2 APPROVED)

STUCCO AND CLEAR ANODIZED ALUMINUM WINDOW

EAST ELEVATION AND ENTRANCE (NEWLY PROPOSED)

WINDOW SHAPE & SIZE TO BE CONSISTENT WITH EXISTING WINDOWS

SHEAR WALL PUSHED BACK

RAILING REVISED(MAYOR’S OFFICE ON DISABILITY PROJECT SCOPE)

Page 17: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201817

Building Design & Construction

EAST WALL SECTION (CDR PHASE 2 APPROVED)Scale: 3/16” = 1’

WINDOW HEAD DETAILScale: 3” = 1’

+149.75'

TOP OF STRUC. CONC.

+137.33

TOP OF STRUC. CONC.

+124.83

TOP OF STRUC. CONC.

(E) GRILLE

(E)PLANTER

(E) AIR INTAKE

3'-0"

5'-7 1

/2"3'-

5"6'-

7 1/2"

4'-5"

(E) CONC. WALL

(N) EXTERIORWINDOW

(N) EXTERIORWINDOW

(N) SHOTCRETESHEAR WALLSEE STRUCT DWGS

(E) CONC. WALL

(N) ALUMINUMSPANDREL PANEL

PT PLYWOOD

6"

(N) SHOTCRETE WALL

ALUMINUMWINDOW

ROOM SIDE

MATCH (E)

1/2" ALUMINUM PLATE

INTERIOR FINISH

(E) CONCRETEWALL4"

ALUMINUMSPANDREL PANELFASTENED TO Z-CLIP

CEMENT PLASTER SYSTEM

PT PLYWOOD

6"

(N) SHOTCRETE WALL

ALUMINUMWINDOW

ROOM SIDE

SOLID SURFACEWINDOW SILL

SEALANT ANDBACKER ROD

MATCH (E)SLOPE

1/2" ALUMINUM PLATE

INTERIOR FINISH

(E) CONCRETEWALL

WINDOW SILL DETAILScale: 3” = 1’

Page 18: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

EAST ELEVATION - WALL SECTION (NEWLY PROPOSED)Scale: 3/16” = 1’

WINDOW HEAD DETAILScale: 3” = 1’

WINDOW SILL DETAILScale: 3” = 1’

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201818

Building Design & Construction

SHEAR WALLPUSHED BACK

SHEAR WALLPUSHED BACK

REVISED TOSTUCCO FINISHES

Page 19: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201819

Building Design & Construction

EAST ELEVATION AND ENTRANCE (NEWLY PROPOSED)

WINDOW SHAPE & SIZE TO BE CONSISTENT WITH EXISTING WINDOWS

SHEAR WALL PUSHED BACK

RAILING REVISED(MAYOR’S OFFICE ON DISABILITY PROJECT WORK SCOPE)

SPANDREL REVISEDTO STUCCO FINISHES

Page 20: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201820

Building Design & Construction

PART OF MAYOR’S OFFICE ON DISABILITY WORK SCOPE (FRONT RAMP REVISION)

EXISTING RAMP AND STAIRS (PART OF MAYOR’S OFFICE ON DISABILITY PROJECT SCOPE)

PROPOSED RAMP AND STAIRS (PART OF MAYOR’S OFFICE ON DISABILITY PROJECT SCOPE) PREVIOUSLY APPROVED AND PERMITTED; PERMIT NUMBER 2016-1222-5776

Page 21: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201821

Building Design & Construction

5. Plaque for Art Wall : We are proposing the Plaque describing the art-work and reproduction be located at south-east corner of building. (Revision made per CDR 2 com-ment)

Subject: Plaque

Art Wall Plaque

Page 22: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201822

Building Design & Construction

1/16” ETCHED WITH BLACK FILL

BLUSHED STAINLESS STEEL

A. ELEVATION B. SECTION

Page 23: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201823

Building Design & Construction

6. Landscape : We are proposing a revised planting scheme (Revision made per CDR 2 comment)

Subject: Landscape

Page 24: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center plan

south planter

entry planter

planting legend

Libertia ioxides ‘Gold nger’ Chilean Iris

Agave angustifolia Woodrowii Carribean Agave

Anigozanthus avidus ‘Big Red’ Big Red Kangaroo PawIris

Phormium tenax ‘Guardsman’ Guardsman New Zealand Flax

Phyllostachys nigra Black Bamboo

Anigozanthus avidus ‘Yellow Gem’ Yellow Gem Kangaroo PawIris

PLANTING PLANS (CDR PHASE 2 APPROVED)

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201824

Building Design & Construction

Page 25: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center plant pallette

Phyllostachys NigraBlack Bamboo

Anigozanthus avidus ‘Big Red’Big Red Kangaroo Paw

Phormium Tenax ‘Guardsman’Guardsman Flax

Agave Angustifolia VarigataCarribean Agave Variegated

Liriope Muscari VarigataVariegated Liriope

Libertia ioxidesChilean Iris

Anigozanthus avidus ‘Yellow Gem’Yellow Gem Kangaroo Paw

PLANT PALETTE (CDR PHASE 2 APPROVED)

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201825

Building Design & Construction

Page 26: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

SOUTHEAST CORNER (CDR PHASE 2 APPROVED)

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201826

Building Design & Construction

Page 27: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

EAST ELEVATION AND ENTRANCE (CDR PHASE 2 APPROVED)

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201827

Building Design & Construction

Page 28: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

SOUTH PLANTER - PLAN

ENTRY PLANTER - PLAN

PLANTING PALETTE

Agave angustifolia Woodrowii

Euphorbia Amygdaloides

Phormium tenax ‘Guardsman’

Phyllostachys nigra

Salvia Greggii ‘Salmon’

Chilean Iris

Carribean Agave

Salmon Texas Sage

Wood Spurge

Guardsman New Zealand Flax

Black Bamboo

PLANTING PLANS (NEWLY PROPOSED)

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201828

Building Design & Construction

Page 29: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201829

Building Design & Construction

SOUTH ELEVATION - PLANTING (NEWLY PROPOSED)

Page 30: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201830

Building Design & Construction

EAST ELEVATION AND ENTRANCE - PLANTING (NEWLY PROPOSED)

Page 31: MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CITY & COUNTY ... - San Francisco Hall... · 2019. 7. 15. · Maxine Hall Health Center - Renovation and Seismic Upgrade Civic

Maxine Hall Health Center - Renovation and Seismic Upgrade

Civic Design Review - Phase 3 - June 25, 201831

Building Design & Construction

THANK YOU