Transcript of Maximo Training - Introduction
![Page 1: Maximo Training - Introduction](https://reader036.fdocuments.us/reader036/viewer/2022081811/55aa38751a28ab46118b45ce/html5/thumbnails/1.jpg)
© 2014 IBM Corporation
IBM Maximo Asset Management TrainingIntroduction
Bruno Portaluri
Maximo Technical Solution Architect
Last Update: 2014-11-12
![Page 2: Maximo Training - Introduction](https://reader036.fdocuments.us/reader036/viewer/2022081811/55aa38751a28ab46118b45ce/html5/thumbnails/2.jpg)
© 2014 IBM Corporation2
Asset & Service Management with Maximo
![Page 3: Maximo Training - Introduction](https://reader036.fdocuments.us/reader036/viewer/2022081811/55aa38751a28ab46118b45ce/html5/thumbnails/3.jpg)
© 2014 IBM Corporation3
Add-on Solutions - options, used with core or industry solutions, provide deeper functionality for specific needs.
Maximo
Adapter for SAP
Maximo
Scheduler
Maximo
Linear Asset
Manager
Maximo
Health, Safety &
Environment Mgr
SMART Mobile
(Syclo)
Maximo
Service Provider
Maximo
Mobile
Maximo
Calibration
Maximo
Asset
Configuration
Manager
Maximo
EveryplaceMaximo
Archiving
Maximo
Spatial
Maximo
Adapter for
Oracle
Maximo
Adapter for
Primavera
Maximo
Adapter for MS
Project
Maximo Asset Management
Maximo
for
Transportation
Maximo
for Utilities
Maximo
for
Life Sciences
Maximo
for Nuclear
Maximo
for Oil & Gas
Industry Solutions -industry-specific capabilities for the unique requirements of asset-intensive industries.
Integration Adapters - commercially-supported integration to other enterprise and 3rd party systems.
Maximo
Archiving
![Page 4: Maximo Training - Introduction](https://reader036.fdocuments.us/reader036/viewer/2022081811/55aa38751a28ab46118b45ce/html5/thumbnails/4.jpg)
© 2014 IBM Corporation4
Basic Maximo Training
• Based on Maximo version 7.5
• Sample data based on Demo database
• Self-paced exercises can be done on the public Maximo Preview Site
• Modules
• Introduction (duration 00:30)
• Getting Started (01:00)
• Asset Management (01:30)
• Work Management (02:00)
• Inventory Management (01:00)
![Page 5: Maximo Training - Introduction](https://reader036.fdocuments.us/reader036/viewer/2022081811/55aa38751a28ab46118b45ce/html5/thumbnails/5.jpg)
© 2014 IBM Corporation5
IBM Tivoli's Process Automation Engine 7.5 Fundamentals
TOS26 - Self-paced virtual class (16 hrs)OR
TR711 - Instructor-led (5 days)
IBM Maximo Asset Management 7.5 Work Management
TR632 - Instructor-led (3 days)
Official Training
Start
IBM Maximo Asset Management 7.5 Fundamentals
TOS43 - Self-paced virtual class (24 hrs)OR
TR571 - Instructor-led (4 days)
![Page 6: Maximo Training - Introduction](https://reader036.fdocuments.us/reader036/viewer/2022081811/55aa38751a28ab46118b45ce/html5/thumbnails/6.jpg)
© 2014 IBM Corporation6 © 2014 IBM Corporation6