Mat'l Labor Total QTY Percentage Amount QTY Percentage Amount QTY Percentage
2 sets355,950.00 711,900.00 711,900.00 5.9325% 0 0% 0 2 100% 711,900.00 2 5.9325%
9 units 31,200.00280,800.00 280,800.00 2.3400% 0 0% 0 9 100% 280,800.00 9 2.3400%
6 sets
102,680.00 616,080.00 616,080.00 5.1340% 0 0% 0 6 100% 616,080.00 6 5.1340%
2 sets 98,600.00 197,200.00 197,200.00 1.6433% 0 0% 0 2 100% 197,200.00 2 1.6433%
179 units 7,500.00 1,342,500.00 1,342,500.00 11.1875% 0 0% 0 179 100% 1,342,500.00 179 11.1875%
Mat'l Labor Total QTY Percentage Amount QTY Percentage Amount QTY Percentage
340 ft 261.00 88,740.00 0.0000% 0 0% 0 0 0% 0 0%
190 ft 188.40 35,796.00 0.0000% 0 0% 0 0 0% 0 0%
340 ft 109.00 37,060.00 0.0000% 0 0% 0 0 0% 0 0%
190 ft 116.75 22,182.50 0.0000% 0 0% 0 0 0% 0 0%
48 pcs 93.00 4,464.00 0.0000% 0 0% 0 0 0% 0 0%
24 pcs 71.64 1,719.36 0.0000% 0 0% 0 0 0% 0 0%
48 pcs 66.50 3,192.00 0.0000% 0 0% 0 0 0% 0 0%
24 pcs 62.00 1,488.00 0.0000% 0 0% 0 0 0% 0 0%
34 pcs 66.50 2,261.00 0.0000% 0 0% 0 0 0% 0 0%
19 pcs 55.00 1,045.00 0.0000% 0 0% 0 0 0% 0 0%
34 pcs 55.00 1,870.00 0.0000% 0 0% 0 0 0% 0 0%
57 L/6 711.13 40,534.41 0.0000% 0 0% 0 0 0% 0 0%
32 L/6 660.71 21,142.72 0.0000% 0 0% 0 0 0% 0 0%
57 L/6 581.11 33,123.27 0.0000% 0 0% 0 0 0% 0 0%
32 L/6 323.72 10,359.04 0.0000% 0 0% 0 0 0% 0 0%
53 L/10 399.00 21,147.00 0.0000% 0 0% 0 0 0% 0 0%
48 pcs 66.34 3,184.32 0.0000% 0 0% 0 0 0% 0 0%
150 pcs 39.80 5,970.00 0.0000% 0 0% 0 0 0% 0 0%
10 kgs 172.48 1,724.80 0.0000% 0 0% 0 0 0% 0 0%
80 pcs 14.00 1,120.00 0.0000% 0 0% 0 0 0% 0 0%
14 L/10 317.49 4,444.86 0.0000% 0 0% 0 0 0% 0 0%
70 pcs 5.50 385.00 0.0000% 0 0% 0 0 0% 0 0%
70 pcs 5.50 385.00 0.0000% 0 0% 0 0 0% 0 0%
70 pcs 39.80 2,786.00 0.0000% 0 0% 0 0 0% 0 0%
4 pcs 400.00 1,600.00 0.0000% 0 0% 0 0 0% 0 0%
1 lot 400.00 400.00 0.0000% 0 0% 0 0 0% 0 0%
16 pcs 119.50 1,912.00 0.0000% 0 0% 0 0 0% 0 0%
2 cyl 1,460.00 2,920.00 0.0000% 0 0% 0 0 0% 0 0%
THE ADDRESS - Wack Wack Mandaluyong City
CP-08A Installation of Piping Works for Residential Areas
Monthly Report
INSTALLATIONPresent Accomplishment
Description QTY UNITUnit Cost
EMT Coupling 1/2"
G.I. Wire # 16
Copper Elbow 1/4"
Copper Coupling 5/8"
Copper Coupling 1/2"
Copper Coupling 3/8"
Rubber Insulation
5/8"x1'Thickness
Rubber Insulation
1/2"x1'Thickness
Copper Tube 1/2"
Copper Tube 3/8"
Copper Tube 1/4"
Copper Elbow 5/8"
Copper Elbow 1/2"
Copper Elbow 3/8"
Copper Tube 5/8"
To Date
AmountAmount % Weight
Previous Accomplishment
6TH FLOOR
Paint
Access Valve
Nitrogen
Tox with Metal Screw #8
Fullthread 3/8"
Nuts 3/8"
Washer 3/8"
Anchor Grip 3/8"
Flat Bar 1/8" x 1"
Rubber Insulation
3/8"x1'Thickness
Rubber Insulation
1/4"x3/4'Thickness
EMT Pipe 1/2"
EMT Elbow 1/2"
Itemized Cost Breakdown
Mitsubishi Electric
(Accessories)
CMY-Y62-G-E 1,342,500.00
PC-4GAKD/PU-40JSA.TH 197,200.00
E UIPMENTDescription QTY UNIT
Unit CostAmount % Weight
Previous Accomplishment Present Accomplishment To Date
Amount
Carrier Ducted Type
40RM012/38HDS012 711,900.00
Carrier Window Type
WCARP24ED 280,800.00
Mitsubishi Electric (Split-Type)
PK-4FAKLD
/PU-4TJSA.TH 616,080.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
2/17
80 pcs 40.00 3,200.00 0.0000% 0 0% 0 0 0% 0 0%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 0 0% 0 0%
2 pcs 172.48 344.96 0.0000% 0 0% 0 0 0% 0 0%
24 pcs 66.50 1,596.00 0.0000% 0 0% 0 0 0% 0 0%
18 rolls 133.00 2,394.00 0.0000% 0 0% 0 0 0% 0 0%
1 bot 172.98 172.98 0.0000% 0 0% 0 0 0% 0 0%
1 lot 107,859.98 107,859.98 0.0000% 0 0% 0 0 0% 0 0%
Php471,311.20
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
Junction Box
Polythelene Tape
Rugby
Labor
SUBTOTAL SUBTOTAL
Silver Rod
Oxy-Acethylene
Hacksaw Blade
7TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Coupling 5/8" 1,463.00
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00
Copper Elbow 1/2" 1,074.60
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Tube 3/8" 23,980.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
EMT Coupling 1/2" 4,139.20
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Rubber Insulation
1/4"x3/4'Thickness 5,179.52
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
Rubber Insulation
5/8"x1'Thickness 26,311.81Rubber Insulation
1/2"x1'Thickness 10,571.36
Rubber Insulation
3/8"x1'Thickness 21,501.07
Access Valve 1,673.00
Nitrogen 4,380.00
Anchor Grip 3/8" 1,592.00
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Fullthread 3/8" 2,539.92
Nuts 3/8" 220.00
Washer 3/8" 220.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
3/17
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
Silver Rod 2,800.00
SUBTOTAL SUBTOTAL 302,883.25
8TH FLOOR
Copper Tube 5/8" 57,420.00
Polythelene Tape 1,330.00
Rugby 172.98
Labor 79,605.42
Oxy-Acethylene 2,787.00
Hacksaw Blade 172.48
Junction Box 997.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Coupling 1/2" 495.00
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
Copper Elbow 3/8" 1,396.50
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
Copper Tube 1/4" 11,091.25
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
G.I. Wire # 16 862.40
Rubber Insulation
3/8"x1'Thickness 21,501.07Rubber Insulation
1/4"x3/4'Thickness 5,179.52
EMT Pipe 1/2" 12,768.00
Copper Coupling 3/8" 1,210.00
Rubber Insulation
5/8"x1'Thickness 26,311.81
Rubber Insulation
1/2"x1'Thickness 10,571.36
Paint 400.00
Access Valve 1,673.00
Nitrogen 4,380.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
Flat Bar 1/8" x 1" 800.00
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Nuts 3/8" 220.00
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Junction Box 997.50
Polythelene Tape 1,330.00
Rugby 172.98
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
Hacksaw Blade 172.48
-
7/27/2019 Material Cost Breakdown_5!4!2012
4/17
-
7/27/2019 Material Cost Breakdown_5!4!2012
5/17
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
9TH FLOOR
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36
Rubber Insulation
3/8"x1'Thickness 21,501.07
Rubber Insulation
1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00
Rubber Insulation
5/8"x1'Thickness 26,311.81
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Rugby 172.98
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
6/17
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
10TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36Rubber Insulation
3/8"x1'Thickness 21,501.07Rubber Insulation
1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00Rubber Insulation
5/8"x1'Thickness 26,311.81
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00Anchor Grip 3/8" 1,592.00
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Rugby 172.98
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
7/17
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
11TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36
Rubber Insulation
3/8"x1'Thickness 21,501.07Rubber Insulation
1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00
Rubber Insulation
5/8"x1'Thickness 26,311.81
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Rugby 172.98
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
8/17
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
12TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36
Rubber Insulation
3/8"x1'Thickness 21,501.07Rubber Insulation
1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00
Rubber Insulation
5/8"x1'Thickness 26,311.81
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Rugby 172.98
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
9/17
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
14TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36
Rubber Insulation
3/8"x1'Thickness 21,501.07Rubber Insulation
1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00
Rubber Insulation
5/8"x1'Thickness 26,311.81
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Rugby 172.98
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
10/17
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
15TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36
Rubber Insulation
3/8"x1'Thickness 21,501.07
Rubber Insulation
1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00
Rubber Insulation
5/8"x1'Thickness 26,311.81
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Rugby 172.98
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
16TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
11/17
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
Copper Tube 3/8" 23,980.00
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36Rubber Insulation
3/8"x1'Thickness 21,501.07Rubber Insulation
1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00Rubber Insulation
5/8"x1'Thickness 26,311.81
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Rugby 172.98
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
17TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
12/17
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36Rubber Insulation
3/8"x1'Thickness 21,501.07
Rubber Insulation1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00Rubber Insulation
5/8"x1'Thickness 26,311.81
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Rugby 172.98Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00Copper Elbow 1/2" 1,074.60
18TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36Rubber Insulation
3/8"x1'Thickness 21,501.07
Rubber Insulation
1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00
Rubber Insulation
5/8"x1'Thickness 26,311.81
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
13/17
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
220 ft 261.00 57,420.00 0.0000% 0 0% 0 220 100% 57,420.00 220 100%
95 ft 188.40 17,898.00 0.0000% 0 0% 0 95 100% 17,898.00 95 100%
220 ft 109.00 23,980.00 0.0000% 0 0% 0 220 100% 23,980.00 220 100%
95 ft 116.75 11,091.25 0.0000% 0 0% 0 95 100% 11,091.25 95 100%
21 pcs 93.00 1,953.00 0.0000% 0 0% 0 21 100% 1,953.00 95 100%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 15 100% 1,074.60 15 100%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 21 100% 1,396.50 21 100%
15 pcs 62.00 930.00 0.0000% 0 0% 0 15 100% 930.00 15 100%
22 pcs 66.50 1,463.00 0.0000% 0 0% 0 22 100% 1,463.00 22 100%
9 pcs 55.00 495.00 0.0000% 0 0% 0 9 100% 495.00 9 100%
22 pcs 55.00 1,210.00 0.0000% 0 0% 0 22 100% 1,210.00 22 100%
37 L/6 711.13 26,311.81 0.0000% 0 0% 0 37 100% 26,311.81 37 100%
16 L/6 660.71 10,571.36 0.0000% 0 0% 0 16 100% 10,571.36 16 100%
37 L/6 581.11 21,501.07 0.0000% 0 0% 0 37 100% 21,501.07 37 100%
16 L/6 323.72 5,179.52 0.0000% 0 0% 0 16 100% 5,179.52 16 100%
32 L/10 399.00 12,768.00 0.0000% 0 0% 0 32 100% 12,768.00 32 100%
36 pcs 66.34 2,388.24 0.0000% 0 0% 0 36 100% 2,388.24 36 100%
104 pcs 39.80 4,139.20 0.0000% 0 0% 0 104 100% 4,139.20 104 100%
5 kgs 172.48 862.40 0.0000% 0 0% 0 5 100% 862.40 5 100%
40 pcs 14.00 560.00 0.0000% 0 0% 0 40 100% 560.00 40 100%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 8 100% 2,539.92 8 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 5.50 220.00 0.0000% 0 0% 0 40 100% 220.00 40 100%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 40 100% 1,592.00 40 100%
2 pcs 400.00 800.00 0.0000% 0 0% 0 2 100% 800.00 2 100%
1 lot 400.00 400.00 0.0000% 0 0% 0 1 100% 400.00 1 100%
14 pcs 119.50 1,673.00 0.0000% 0 0% 0 14 100% 1,673.00 14 100%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 3 100% 4,380.00 3 100%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 70 100% 2,800.00 70 100%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 1 100% 2,787.00 1 100%
1 pcs 172.48 172.48 0.0000% 0 0% 0 1 100% 172.48 1 100%
15 pcs 66.50 997.50 0.0000% 0 0% 0 15 100% 997.50 15 100%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 10 100% 1,330.00 10 100%
1 bot 172.98 172.98 0.0000% 0 0% 0 1 100% 172.98 1 100%
1 lot 79,605.42 79,605.42 0.0000% 0 0% 0 1 100% 79605.42 1 100%
Php302,883.25
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
Fullthread 3/8" 2,539.92
Rugby 172.98
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
Copper Elbow 3/8" 1,396.50
Copper Elbow 1/4" 930.00
Copper Coupling 5/8" 1,463.00
Copper Tube 1/4" 11,091.25
Copper Elbow 5/8" 1,953.00
Copper Elbow 1/2" 1,074.60
19TH FLOOR
Copper Tube 5/8" 57,420.00
Copper Tube 1/2" 17,898.00
Copper Tube 3/8" 23,980.00
EMT Pipe 1/2" 12,768.00
EMT Elbow 1/2" 2,388.24
EMT Coupling 1/2" 4,139.20
Rubber Insulation
1/2"x1'Thickness 10,571.36
Rubber Insulation
3/8"x1'Thickness 21,501.07
Rubber Insulation
1/4"x3/4'Thickness 5,179.52
Copper Coupling 1/2" 495.00
Copper Coupling 3/8" 1,210.00
Rubber Insulation
5/8"x1'Thickness 26,311.81
Flat Bar 1/8" x 1" 800.00
Paint 400.00
Access Valve 1,673.00
Nuts 3/8" 220.00
Washer 3/8" 220.00
Anchor Grip 3/8" 1,592.00
G.I. Wire # 16 862.40
Tox with Metal Screw #8 560.00
Fullthread 3/8" 2,539.92
Rugby 172.98
Labor 79,605.42
SUBTOTAL SUBTOTAL 302,883.25
Hacksaw Blade 172.48
Junction Box 997.50
Polythelene Tape 1,330.00
Nitrogen 4,380.00
Silver Rod 2,800.00
Oxy-Acethylene 2,787.00
-
7/27/2019 Material Cost Breakdown_5!4!2012
14/17
214 ft 261.00 55,854.00 0.0000% 0 0% 0 0 0% 0 0%
80 ft 188.40 15,072.00 0.0000% 0 0% 0 0 0% 0 0%
214 ft 109.00 23,326.00 0.0000% 0 0% 0 0 0% 0 0%
80 ft 116.75 9,340.00 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 93.00 2,790.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 66.50 1,995.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 62.00 930.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 0 0% 0 0%
8 pcs 55.00 440.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 55.00 1,155.00 0.0000% 0 0% 0 0 0% 0 0%
36 L/6 711.13 25,600.68 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 660.71 9,249.94 0.0000% 0 0% 0 0 0% 0 0%
36 L/6 581.11 20,919.96 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 323.72 4,532.08 0.0000% 0 0% 0 0 0% 0 0%
30 L/10 399.00 11,970.00 0.0000% 0 0% 0 0 0% 0 0%
51 pcs 66.34 3,383.34 0.0000% 0 0% 0 0 0% 0 0%
132 pcs 39.80 5,253.60 0.0000% 0 0% 0 0 0% 0 0%
5 kgs 172.48 862.40 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 14.00 560.00 0.0000% 0 0% 0 0 0% 0 0%8 L/10 317.49 2,539.92 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 0 0% 0 0%
2 pcs 400.00 800.00 0.0000% 0 0% 0 0 0% 0 0%
1 lot 400.00 400.00 0.0000% 0 0% 0 0 0% 0 0%
7 pcs 119.50 836.50 0.0000% 0 0% 0 0 0% 0 0%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 0 0% 0 0%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 0 0% 0 0%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 0 0% 0 0%
1 pcs 172.48 172.48 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 66.50 997.50 0.0000% 0 0% 0 0 0% 0 0%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 0 0% 0 0%
1 bot 172.98 172.98 0.0000% 0 0% 0 0 0% 0 0%
1 lot 76,835.45 76,835.45 0.0000% 0 0% 0 0 0% 0 0%
Php291,788.93
214 ft 261.00 55,854.00 0.0000% 0 0% 0 0 0% 0 0%
80 ft 188.40 15,072.00 0.0000% 0 0% 0 0 0% 0 0%
214 ft 109.00 23,326.00 0.0000% 0 0% 0 0 0% 0 0%
80 ft 116.75 9,340.00 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 93.00 2,790.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 66.50 1,995.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 62.00 930.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 0 0% 0 0%
8 pcs 55.00 440.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 55.00 1,155.00 0.0000% 0 0% 0 0 0% 0 0%
Copper Elbow 3/8"
Copper Elbow 1/4"
Copper Coupling 5/8"
Copper Tube 1/4"
Copper Elbow 5/8"
Copper Elbow 1/2"
20TH FLOOR
Copper Tube 5/8"
Copper Tube 1/2"
Copper Tube 3/8"
EMT Pipe 1/2"
EMT Elbow 1/2"
EMT Coupling 1/2"
Rubber Insulation
1/2"x1'Thickness
Rubber Insulation
3/8"x1'Thickness
Rubber Insulation
1/4"x3/4'Thickness
Copper Coupling 1/2"
Copper Coupling 3/8"
Rubber Insulation
5/8"x1'Thickness
Flat Bar 1/8" x 1"
Paint
Access Valve
Nuts 3/8"
Washer 3/8"
Anchor Grip 3/8"
G.I. Wire # 16
Tox with Metal Screw #8Fullthread 3/8"
Rugby
Labor
SUBTOTAL SUBTOTAL
Hacksaw Blade
Junction Box
Polythelene Tape
Nitrogen
Silver Rod
Oxy-Acethylene
Copper Elbow 3/8"
Copper Elbow 1/4"
Copper Coupling 5/8"
Copper Tube 1/4"
Copper Elbow 5/8"
Copper Elbow 1/2"
21ST FLOOR
Copper Tube 5/8"
Copper Tube 1/2"
Copper Tube 3/8"
Copper Coupling 1/2"
Copper Coupling 3/8"
-
7/27/2019 Material Cost Breakdown_5!4!2012
15/17
36 L/6 711.13 25,600.68 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 660.71 9,249.94 0.0000% 0 0% 0 0 0% 0 0%
36 L/6 581.11 20,919.96 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 323.72 4,532.08 0.0000% 0 0% 0 0 0% 0 0%
30 L/10 399.00 11,970.00 0.0000% 0 0% 0 0 0% 0 0%51 pcs 66.34 3,383.34 0.0000% 0 0% 0 0 0% 0 0%
132 pcs 39.80 5,253.60 0.0000% 0 0% 0 0 0% 0 0%
5 kgs 172.48 862.40 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 14.00 560.00 0.0000% 0 0% 0 0 0% 0 0%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 0 0% 0 0%
2 pcs 400.00 800.00 0.0000% 0 0% 0 0 0% 0 0%
1 lot 400.00 400.00 0.0000% 0 0% 0 0 0% 0 0%7 pcs 119.50 836.50 0.0000% 0 0% 0 0 0% 0 0%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 0 0% 0 0%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 0 0% 0 0%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 0 0% 0 0%
1 pcs 172.48 172.48 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 66.50 997.50 0.0000% 0 0% 0 0 0% 0 0%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 0 0% 0 0%
1 bot 172.98 172.98 0.0000% 0 0% 0 0 0% 0 0%
1 lot 76,835.45 76,835.45 0.0000% 0 0% 0 0 0% 0 0%
Php291,788.93
214 ft 261.00 55,854.00 0.0000% 0 0% 0 0 0% 0 0%
80 ft 188.40 15,072.00 0.0000% 0 0% 0 0 0% 0 0%
214 ft 109.00 23,326.00 0.0000% 0 0% 0 0 0% 0 0%
80 ft 116.75 9,340.00 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 93.00 2,790.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 66.50 1,995.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 62.00 930.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 0 0% 0 0%
8 pcs 55.00 440.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 55.00 1,155.00 0.0000% 0 0% 0 0 0% 0 0%
36 L/6 711.13 25,600.68 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 660.71 9,249.94 0.0000% 0 0% 0 0 0% 0 0%
36 L/6 581.11 20,919.96 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 323.72 4,532.08 0.0000% 0 0% 0 0 0% 0 0%
30 L/10 399.00 11,970.00 0.0000% 0 0% 0 0 0% 0 0%
51 pcs 66.34 3,383.34 0.0000% 0 0% 0 0 0% 0 0%
132 pcs 39.80 5,253.60 0.0000% 0 0% 0 0 0% 0 0%
5 kgs 172.48 862.40 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 14.00 560.00 0.0000% 0 0% 0 0 0% 0 0%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
EMT Pipe 1/2"EMT Elbow 1/2"
EMT Coupling 1/2"
Rubber Insulation
1/2"x1'Thickness
Rubber Insulation
3/8"x1'Thickness
Rubber Insulation
1/4"x3/4'Thickness
Rubber Insulation
5/8"x1'Thickness
Flat Bar 1/8" x 1"
PaintAccess Valve
Nuts 3/8"
Washer 3/8"
Anchor Grip 3/8"
G.I. Wire # 16
Tox with Metal Screw #8
Fullthread 3/8"
Rugby
Labor
SUBTOTAL SUBTOTAL
Hacksaw Blade
Junction Box
Polythelene Tape
Nitrogen
Silver Rod
Oxy-Acethylene
Copper Elbow 3/8"
Copper Elbow 1/4"
Copper Coupling 5/8"
Copper Tube 1/4"
Copper Elbow 5/8"
Copper Elbow 1/2"
22ND FLOOR
Copper Tube 5/8"
Copper Tube 1/2"
Copper Tube 3/8"
EMT Pipe 1/2"
EMT Elbow 1/2"
EMT Coupling 1/2"
Rubber Insulation
1/2"x1'ThicknessRubber Insulation
3/8"x1'Thickness
Rubber Insulation1/4"x3/4'Thickness
Copper Coupling 1/2"
Copper Coupling 3/8"Rubber Insulation
5/8"x1'Thickness
Nuts 3/8"
Washer 3/8"
G.I. Wire # 16
Tox with Metal Screw #8
Fullthread 3/8"
-
7/27/2019 Material Cost Breakdown_5!4!2012
16/17
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 0 0% 0 0%
2 pcs 400.00 800.00 0.0000% 0 0% 0 0 0% 0 0%
1 lot 400.00 400.00 0.0000% 0 0% 0 0 0% 0 0%
7 pcs 119.50 836.50 0.0000% 0 0% 0 0 0% 0 0%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 0 0% 0 0%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 0 0% 0 0%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 0 0% 0 0%
1 pcs 172.48 172.48 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 66.50 997.50 0.0000% 0 0% 0 0 0% 0 0%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 0 0% 0 0%
1 bot 172.98 172.98 0.0000% 0 0% 0 0 0% 0 0%
1 lot 76,835.45 76,835.45 0.0000% 0 0% 0 0 0% 0 0%
Php291,788.93
214 ft 261.00 55,854.00 0.0000% 0 0% 0 0 0% 0 0%
80 ft 188.40 15,072.00 0.0000% 0 0% 0 0 0% 0 0%
214 ft 109.00 23,326.00 0.0000% 0 0% 0 0 0% 0 0%
80 ft 116.75 9,340.00 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 93.00 2,790.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 66.50 1,995.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 62.00 930.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 0 0% 0 0%
8 pcs 55.00 440.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 55.00 1,155.00 0.0000% 0 0% 0 0 0% 0 0%
36 L/6 711.13 25,600.68 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 660.71 9,249.94 0.0000% 0 0% 0 0 0% 0 0%
36 L/6 581.11 20,919.96 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 323.72 4,532.08 0.0000% 0 0% 0 0 0% 0 0%
30 L/10 399.00 11,970.00 0.0000% 0 0% 0 0 0% 0 0%
51 pcs 66.34 3,383.34 0.0000% 0 0% 0 0 0% 0 0%
132 pcs 39.80 5,253.60 0.0000% 0 0% 0 0 0% 0 0%
5 kgs 172.48 862.40 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 14.00 560.00 0.0000% 0 0% 0 0 0% 0 0%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 0 0% 0 0%
2 pcs 400.00 800.00 0.0000% 0 0% 0 0 0% 0 0%
1 lot 400.00 400.00 0.0000% 0 0% 0 0 0% 0 0%
7 pcs 119.50 836.50 0.0000% 0 0% 0 0 0% 0 0%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 0 0% 0 0%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 0 0% 0 0%1 set 2,787.00 2,787.00 0.0000% 0 0% 0 0 0% 0 0%
1 pcs 172.48 172.48 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 66.50 997.50 0.0000% 0 0% 0 0 0% 0 0%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 0 0% 0 0%
1 bot 172.98 172.98 0.0000% 0 0% 0 0 0% 0 0%
1 lot 76,835.45 76,835.45 0.0000% 0 0% 0 0 0% 0 0%
Php291,788.93
214 ft 261.00 55,854.00 0.0000% 0 0% 0 0 0% 0 0%
Flat Bar 1/8" x 1"
Paint
Access Valve
Anchor Grip 3/8"
Rugby
Labor
SUBTOTAL SUBTOTAL
Hacksaw Blade
Junction Box
Polythelene Tape
Nitrogen
Silver Rod
Oxy-Acethylene
Copper Elbow 3/8"
Copper Elbow 1/4"
Copper Coupling 5/8"
Copper Tube 1/4"
Copper Elbow 5/8"
Copper Elbow 1/2"
23RD FLOOR
Copper Tube 5/8"
Copper Tube 1/2"
Copper Tube 3/8"
EMT Pipe 1/2"
EMT Elbow 1/2"
EMT Coupling 1/2"
Rubber Insulation
1/2"x1'Thickness
Rubber Insulation
3/8"x1'Thickness
Rubber Insulation
1/4"x3/4'Thickness
Copper Coupling 1/2"
Copper Coupling 3/8"
Rubber Insulation
5/8"x1'Thickness
Flat Bar 1/8" x 1"
Paint
Access Valve
Nuts 3/8"
Washer 3/8"
Anchor Grip 3/8"
G.I. Wire # 16
Tox with Metal Screw #8
Fullthread 3/8"
Rugby
Labor
SUBTOTAL SUBTOTAL
Hacksaw Blade
Junction Box
Polythelene Tape
Nitrogen
Silver RodOxy-Acethylene
24TH FLOOR
Copper Tube 5/8"
-
7/27/2019 Material Cost Breakdown_5!4!2012
17/17
80 ft 188.40 15,072.00 0.0000% 0 0% 0 0 0% 0 0%
214 ft 109.00 23,326.00 0.0000% 0 0% 0 0 0% 0 0%
80 ft 116.75 9,340.00 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 93.00 2,790.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 71.64 1,074.60 0.0000% 0 0% 0 0 0% 0 0%
30 pcs 66.50 1,995.00 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 62.00 930.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 66.50 1,396.50 0.0000% 0 0% 0 0 0% 0 0%
8 pcs 55.00 440.00 0.0000% 0 0% 0 0 0% 0 0%
21 pcs 55.00 1,155.00 0.0000% 0 0% 0 0 0% 0 0%
36 L/6 711.13 25,600.68 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 660.71 9,249.94 0.0000% 0 0% 0 0 0% 0 0%
36 L/6 581.11 20,919.96 0.0000% 0 0% 0 0 0% 0 0%
14 L/6 323.72 4,532.08 0.0000% 0 0% 0 0 0% 0 0%
30 L/10 399.00 11,970.00 0.0000% 0 0% 0 0 0% 0 0%
51 pcs 66.34 3,383.34 0.0000% 0 0% 0 0 0% 0 0%
132 pcs 39.80 5,253.60 0.0000% 0 0% 0 0 0% 0 0%
5 kgs 172.48 862.40 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 14.00 560.00 0.0000% 0 0% 0 0 0% 0 0%
8 L/10 317.49 2,539.92 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 5.50 220.00 0.0000% 0 0% 0 0 0% 0 0%
40 pcs 39.80 1,592.00 0.0000% 0 0% 0 0 0% 0 0%
2 pcs 400.00 800.00 0.0000% 0 0% 0 0 0% 0 0%
1 lot 400.00 400.00 0.0000% 0 0% 0 0 0% 0 0%
7 pcs 119.50 836.50 0.0000% 0 0% 0 0 0% 0 0%
3 cyl 1,460.00 4,380.00 0.0000% 0 0% 0 0 0% 0 0%
70 pcs 40.00 2,800.00 0.0000% 0 0% 0 0 0% 0 0%
1 set 2,787.00 2,787.00 0.0000% 0 0% 0 0 0% 0 0%
1 pcs 172.48 172.48 0.0000% 0 0% 0 0 0% 0 0%
15 pcs 66.50 997.50 0.0000% 0 0% 0 0 0% 0 0%
10 rolls 133.00 1,330.00 0.0000% 0 0% 0 0 0% 0 0%
1 bot 172.98 172.98 0.0000% 0 0% 0 0 0% 0 0%
1 lot 76,835.45 76,835.45 0.0000% 0 0% 0 0 0% 0 0%Php291,788.93
Copper Elbow 3/8"
Copper Elbow 1/4"
Copper Coupling 5/8"
Copper Tube 1/4"
Copper Elbow 5/8"
Copper Elbow 1/2"
Copper Tube 1/2"
Copper Tube 3/8"
EMT Pipe 1/2"
EMT Elbow 1/2"
EMT Coupling 1/2"
Rubber Insulation
1/2"x1'Thickness
Rubber Insulation
3/8"x1'Thickness
Rubber Insulation
1/4"x3/4'Thickness
Copper Coupling 1/2"
Copper Coupling 3/8"
Rubber Insulation
5/8"x1'Thickness
Flat Bar 1/8" x 1"
Paint
Access Valve
Nuts 3/8"
Washer 3/8"
Anchor Grip 3/8"
G.I. Wire # 16
Tox with Metal Screw #8
Fullthread 3/8"
Rugby
LaborSUBTOTAL SUBTOTAL
Hacksaw Blade
Junction Box
Polythelene Tape
Nitrogen
Silver Rod
Oxy-Acethylene