Manual testing

26
Presentation on Manual Testing

Transcript of Manual testing

Presentation on Manual Testing

Project in Pipeline

Kick of Meeting

SDLC

SOFTWARE TESTING LIFE CYCLE

REQUIREMENTS/DESIGN REVIEW

TEST PLANNING

TEST DESIGNING

TEST ENVIRONMENT

TEST EXECUTION

RESULT ANALYSIS

BUG TRACKING

TEST REPORTING

TEST DELIVERABLES

TEST CASES TEST DATATEST PLAN TEST RESULTS TEST CLOSURE REPORTS

TYPES OF SDLC

WATERFALL MODEL

PROTOTYPE MODEL

INCREMENTAL MODEL

INCREMENTAL PROTOTYPE MODELV MODELSPIRAL MODEL

TESTING

TYPES OF TESTING

REVIEWS & TYPES

FORMAL INFORMAL

QA and QC

UNIT/COMPONENT TESTING INTEGRATION TESTING

TOP DOWN APPROACH

BOTTOM UP APPROACH

BIGBANG APPROACH

SANDWICH APPROACH

HYBRID APPROACH

BLACK BOX TESTING

FUNTIONAL TESTING

NON FUNTIONAL TESTING

NON FUNCTIONAL TESTINGGUI SECURITY

PERFORMANCE USABILITY

PERFOMANCE TESTING

1. STRESS

2. LOAD

• VOLUME

. SCALABILITY

DRY TESTING PHASE FAMILYMONKEY

GORILLA

ADHOC

SMOKE

TEST PLAN• INTRODUCTION

• HISTORY

• SCOPE

• VERSION

• RISK AND MITIGATION

• ENTRY CRITERIA

• EXIT CRITERIA

• ROLES AND RESPONSIBILITY

• ENVIRONMENTAL BED

• DELIVERABLES

• TRAINING

BUG LIFE CYCLENEW

ASSIGNED

OPEN

FIXED

RETEST

CLOSED

REOPEN

DEFFERED POSTPONED

DUPLICATE

REJECT

CRITICAL BUGS

Dead link Showstopper

RETESTING

REGRESSION TESTINGNEW BUG MODIFICATION

ENVIRONMENTAL CHANGES SMALL CHANGES

USER ACCEPTANCE TESTING

THANK YOU