Presentation on Manual Testing
Project in Pipeline
Kick of Meeting
SOFTWARE TESTING LIFE CYCLE
REQUIREMENTS/DESIGN REVIEW
TEST PLANNING
TEST DESIGNING
TEST ENVIRONMENT
TEST EXECUTION
RESULT ANALYSIS
BUG TRACKING
TEST REPORTING
TEST DELIVERABLES
TEST CASES TEST DATATEST PLAN TEST RESULTS TEST CLOSURE REPORTS
TYPES OF SDLC
WATERFALL MODEL
PROTOTYPE MODEL
INCREMENTAL MODEL
INCREMENTAL PROTOTYPE MODELV MODELSPIRAL MODEL
REVIEWS & TYPES
FORMAL INFORMAL
UNIT/COMPONENT TESTING INTEGRATION TESTING
TOP DOWN APPROACH
BOTTOM UP APPROACH
BIGBANG APPROACH
SANDWICH APPROACH
HYBRID APPROACH
BLACK BOX TESTING
FUNTIONAL TESTING
NON FUNTIONAL TESTING
NON FUNCTIONAL TESTINGGUI SECURITY
PERFORMANCE USABILITY
PERFOMANCE TESTING
1. STRESS
2. LOAD
• VOLUME
. SCALABILITY
DRY TESTING PHASE FAMILYMONKEY
GORILLA
ADHOC
SMOKE
TEST PLAN• INTRODUCTION
• HISTORY
• SCOPE
• VERSION
• RISK AND MITIGATION
• ENTRY CRITERIA
• EXIT CRITERIA
• ROLES AND RESPONSIBILITY
• ENVIRONMENTAL BED
• DELIVERABLES
• TRAINING
BUG LIFE CYCLENEW
ASSIGNED
OPEN
FIXED
RETEST
CLOSED
REOPEN
DEFFERED POSTPONED
DUPLICATE
REJECT
CRITICAL BUGS
Dead link Showstopper
REGRESSION TESTINGNEW BUG MODIFICATION
ENVIRONMENTAL CHANGES SMALL CHANGES
USER ACCEPTANCE TESTING