Manual Testing Guide Software Testing: Testing is a process of executing a program with the intent of finding error. Software Testing are contains two types: 1) Manual Testing and, 2) Automation Testing Manual Testing: Manual testing is the process of manually testing software for defects. It requires a tester to play the role of an end user, and use most of all features of the application to ensure correct behavior. To ensure completeness of testing, the tester often follows a written test plan that leads them through a set of important test cases Software Testing Definition: Testing is the process of executing a program with the intention of finding errors. Drawbacks of Manual Testing (i) Time consuming. (ii) More resources required. (iii)Human Errors (iv)Repetition of the Task (v)Tiredness (vi)Simultaneous auctions are not possible (Parallel)

description

This is a new manual testing guide and it is useful for everyone

Transcript of Manual Testing Guide

Manual Testing GuideSoftware Testing:Testing is aprocess ofexecuting a program with the intent of finding error.

Software Testingare contains two types:

1) Manual Testing and,2)Automation Testing

Manual Testing:Manual testing is theprocess ofmanuallytesting software for defects. It requires a tester to play the role of an end user, and use most of all features of the application to ensure correct behavior. To ensure completeness of testing, the tester often follows a writtentest planthat leads them through a set of importanttest cases

Software TestingDefinition: Testing is theprocess ofexecuting a program with the intention of finding errors.

Drawbacks of Manual Testing

(i) Time consuming.(ii) More resources required.(iii)Human Errors(iv)Repetition of the Task(v)Tiredness(vi)Simultaneous auctions are not possible (Parallel)

Software Engineering:Software Engineering is the establishment and use of sound engineering principles in order to obtain economically software that is more reliable and works efficiently on real machines.

Software engineering is based on Computer Science,Management Science, Economics, Communication Skills and Engineering approach.

What should be done during testing?Confirming product asProduct that has been developed according to specificationsWorking perfectlySatisfying customer requirementsWhy should we do testing?Error free superior productQuality Assurance to the clientCompetitive advantageCut down costsHow to test?Testing can be done in the following ways:ManuallyAutomation (By using tools like WinRunner, LoadRunner,QTP )Combination of Manual and Automation.Software Project:Anindividualor collaborative enterprise planned and designed to achieve an aim.

Information Gathering Requirements Analysis Design Coding Testing Maintenance: Are called as Project

Software Development Phases:Information Gathering:It encompasses requirements gathering at the strategic business level.

Planning:To provide a framework that enables the management to make reasonable estimates of Resources Cost Schedules SizeRequirements Analysis:Data, Functional and Behavioral requirements are identified.

Data Modeling:Defines data objects, attributes, and relationships.Functional Modeling:Indicates how data are transformed in the system.Behavioral Modeling:Depicts the impact of events.Design:Design is the engineering representation of product that is to be built.

Data Design:Transforms the information domain model into the data structures that will be required to implement the software.Architectural design:Relationship between major structural elements of the software. Represents the structure of data and program components that are required to build a computer based system.Interface design:Creates an effective communication medium between a human and a computer.Component level Design:Transforms structural elements of the software architecture into a procedural description of software components.Coding:Translation into source code (Machine readable form)Testing:Testing is aprocess ofexecuting a program with the intent of finding errorUnit Testing:It concentrates on each unit (Module, Component) of the software as implemented in source code.Integration Testing:Putting the modules together and construction of software architecture.System and Functional Testing:Product is validated with other system elements are tested as a wholeUser Acceptance Testing:Testing by the user to collect feed back.Maintenance:Change associated with errorcorrection, adaptation and enhancements.Correction:Changes software to correct defects.Adaptation:Modification to the software to accommodate changes to its external environment.Enhancement:Extends the software beyond its original functional requirements.Prevention:Changes software so that they can be more easily corrected, adapted and enhanced.Business RequirementsSpecification(BRS):Consists of definitions of customer requirements. Also called as CRS/URS (Customer RequirementsSpecification/ User RequirementsSpecification)Software RequirementsSpecification(S/wRS):Consists of functional requirements to develop and system requirements(s/w & H/w) to use.

Review:A verification method to estimate completeness and correctness of documents.

High Level Design Document (HLDD):Consists of the overall hierarchy of the system in terms of modules.

Low Level Design Document (LLDD):Consists of every sub module in terms of Structural logic (ERD) and Backend Logic(DFD)

Prototype:A sample model of an application without functionality is called as prototype(Screens)

White Box Testing:A coding level testing techniqueto verifycompleteness and correctness of the programs with respect to design. Also called as Glass BT or Clear BT

Black Box Testing:It is a .exe level of testing technique to validate functionality of an application with respect to customer requirements. During this test engineer validate internal processing depends on external interface.

Grey Box Testing:Combination of white box and black box testing.

Build:A .Exe form of integrated module set is called build.

Verification:whether system is right or wrong?

Validation:whether system is right system or not?

Software Quality Assurance(SQA):SQA concepts are monitoring and measuring the strength of development process.Ex:LCT (Life Cycle Testing)Quality:Meet customer requirementsMeet customer expectations (cost to use, speed in process or performance, security)Possible costTime to marketFor developing the quality software we need LCD and LCT

LCD:A multiple stages of development stages and the every stage is verified for completeness.

V model:

Build:When coding level testing over. it is a completely integration tested modules. Then it is called a build. Build is developed after integration testing. (.exe)

Test Management:Testers maintain some documents related to every project. They will refer these documents for future modifications.

Port Testing:This is to test the installation process.

Change Request:The request made by the customer to modify the software.

Defect Removel Efficiency:DRE= a/a+b.a = Total no of defects found by testers during testing.b = Total no of defects found by customer during maintenance.

DRE is also called as DD(Defect Deficiency).

BBT, UAT and Test management process where the independent testers or testing team will be involved.

Refinement form of V-Model:Due to cost and time point of view v-model is not applicable to small scale and medium scale companies. This type of organizations are maintaining a refinement form of v-model.

Fig: Refinement Form of V-Model

Development starts with information gathering. After the requirements gatheringBRS/CRS/URS will be prepared. This is done by the Business Analyst.

During the requirements analysis all the requirements are analyzed. at the end of this phase S/wRS is prepared. It consists of the functional (customer requirements) + System Requirements (h/w + S/w) requirements. It is prepared by the system analyst.

During the design phase two types of designs are done. HLDD and LLDD. Tech Leads will be involved.

During the coding phase programs are developed by programmers.

During unit testing, they conduct program level testing with the help of WBT techniques.

During the Integration Testing, the testers and programmers or test programmers integrating the modules to test with respect to HLDD.

During the system and functional testing the actual testers are involved and conducts tests based on S/wRS.

During the UAT customer site people are also involved, and they perform tests based on the BRS.

From the above model the small scale and medium scale organizations are also conducts life cycle testing. But they maintain separate team for functional and system testing.

Reviews during Analysis:Quality Analyst decides on 5 topics. after completion of information gathering and analysis a review meeting conducted to decide following 5 factors.Are they complete?Are they correct? Or Are they right Requirements?Are they achievable?Are they reasonable? ( with respect to cost & time)Are they testable?Reviews during Design:After the completion of analysis of customer requirements and their reviews, technical support people (Tech Leads) concentrate on the logical design of the system. In this every stage they will develop HLDD and LLDD.

After the completion of above like design documents, they (tech leads) concentrate on review of the documents for correctness and completeness. In this review they can apply the below factors.

Is the design good? (understandable or easy to refer)Are they complete? (all the customer requirements are satisfied or not)Are they correct? Are they right Requirements? (the design flow is correct or not)Are they follow able? (the design logic is correct or not)Does they handle error handling? ( the design should be able to specify the positive and negative flow also)

Unit Testing:After the completion of design and their reviews programmers are concentrating on coding. During this stage they conduct program level testing, with the help of the WBT techniques. This WBT is also known as glass box testing or clear box testing.

WBT is based on the code. The senior programmers will conduct testing on programs WBT is applied at the module level.

There are two types of WBT techniques, such as

1.Execution Testing Basis path coverage (correctness of every statement execution.) Loops coverage (correctness of loops termination.) Program technique coverage (Less no of Memory Cycles and CPU cycles during execution.)

1.Operations Testing:Whither the software is running under the customer expected environment platforms (such as OS, compilers, browsers and etcsys s/w.)Integration Testing:After the completion of unit testing, development people concentrate on integration testing, when they complete dependent modules of unit testing. During this test programmers are verifying integration of modules with respect to HLDD (which contains hierarchy of modules).

There are two types of approaches to conduct Integration Testing:Top-down ApproachBottom-up approach.Stub:It is a called program. It sends back control to main module instead of sub module.Driver:It is a calling Program. It invokes a sub module instead of main module.

Bottom-Up:This approach starts testing, from lower-level modules. drivers are used to connect the sub modules. ( ex login, create driver to accept default uid and pwd)

Sandwich:This approach combines the Top-down and Bottom-up approaches of the integration testing. In this middle level modules are testing using the drivers and stubs.

System Testing:Conducted by separate testing teamFollows Black Box testing techniquesDepends on S/wRSBuild level testing to validate internal processing depends on external interface processing depends on external interfaceThis phase is divided into 4 divisionsAfter the completion of Coding and that level tests(U & I) development team releases a finally integrated all modules set as a build. After receiving a stable build fromdevelopment team, separate testing team concentrate on functional and system testing with the help of BBT.

This testing is classified into 4 divisions.

Usability Testing (Ease to use or not. Low level Priority in Testing)Functional Testing (Functionality is correct or not. Medium Priority in Testing)Performance Testing (Speed of Processing. Medium Priority in Testing)Security Testing (To break the security of the system. High Priority in Testing)

Usability and System testing are called as Core testing and Performance and Security Testing techniques are called as Advanced testing.

Usability Testing is a Static Testing. Functional Testing is called as Dynamic Testing.

From the testers point of view functional and usability tests are important.

Usability Testing:User friendliness of the application or build. (WYSIWYG.)Usability testing consists of following subtests also.

User Interface Testing Ease of Use ( understandable to end users to operate ) Look & Feel ( Pleasantness or attractiveness of screens ) Speed in interface ( Less no. of events to complete a task.)Manual Support Testing: In general, technical writers prepares user manuals after completion of all possible tests execution and their modifications also. Now a days help documentation is released along with the main application.

Help documentation is also called as user manual. But actually user manuals are prepared after the completion of all other system test techniques and also resolving all the bugs.

Functional testing:During this stage of testing, testing team concentrate on " Meet Customer Requirements". For performing what functionality, the system is developed met or not can be tested.

For every project functionality testing is most important. Most of the testing tools, which are available in the market are of this type.

The functional testing consists of following subtests

System Testing | | 80 % ---> Functional Testing

| | 80 % ---> Functionality / Requirements Testing

Functionality or Requirements Testing:During this subtest, test engineer validates correctness of every functionality in our application build, through below coverage.If they have less time to do system testing, they will be doing Functionality Testing only.Functionality or Requirements Testing has following coverages

Behavioral Coverage ( Object Properties Checking ).Input Domain Coverage ( Correctness of Size and Type of every i/p Object ).Error Handling Coverage ( Preventing negative navigation ).Calculations Coverage ( correctness of o/p values ).Backend Coverage ( Data Validation & Data Integrity of database tables ).URLs Coverage (Links execution in web pages)Service Levels ( Order of functionality or services ).Successful Functionality ( Combination of above all ).

All the above coverages are mandatory or must.

Input Domain Testing:During this test, the test engineer validates size and type of every input object. In this coverage, test engineer prepares boundary values and equivalence classes for every input object.

Ex:A login process allows user id and password. User id allows alpha numeric from 4-16 characters long. Password allows alphabet from 4-8 characters long.

Boundary Value analysis: Boundary values are used for testing the size and range of an object.

Equivalence Class Partitions: Equivalence classes are used for testing the type of the object.

Recovery Testing:This test is also known as Reliability testing. During this test, test engineers validates that, whether our application build can recover from abnormal situations or not.

Ex:During process power failure, network disconnect, server down, database disconnected etc

Recovery Testing is an extension of Error Handling Testing.Compatibility Testing:This test is also known as portable testing. During this test, test engineer validates continuity of our application execution on customer expected platforms( like OS, Compilers, browsers, etc..)During this compatibility two types of problems arises likeForward compatibilityBackward compatibilityForward compatibility:The application which is developed is ready to run, but the project technology or environment like OS is not supported for running.Backward compatibility:The application is not ready to run on the technology or environment.

Configuration Testing:This test is also known as Hardware Compatibility testing. During this test, test engineer validates that whether our application build supports different technology i.e. hardware devices or not?Inter Systems Testing:This test is also known as End-to-End testing. During this test, test engineer validates that whither our application build coexistence with other existing software in the customer site to share the resources (H/w or S/w).Installation Testing:Testing the applications, installation process in customer specified environment and conditions.

The following conditions or tests done in this installation process.

Setup Program:Whither Setup is starting or not?Easy Interface:During Installation, whither it is providing easy interface or not ?Occupied Disk Space:How much disk space it is occupying after the installation?Sanitation Testing:This test is also known as Garbage Testing. During this test, test engineer finds extra features in your application build with respect to S/w RS.Maximum testers may not get this type of problems.

Parallel or Comparitive testing:During this test, test engineer compares our application build with similar type of applications or old versions of same application to find competitiveness.

This comparative testing can be done in two views:Similar type of applications in the market.Upgraded version of application with older versions.Performance Testing:It is an advanced testing technique and expensive to apply. During this test, testing team concentrate on Speed of Processing.

This performance test classified into below subtests.Load TestingStress TestingData Volume TestingStorage TestingLoad Testing:This test is also known as scalability testing. During this test, test engineer executes our application under customer expected configuration and load to estimate performance.

Load:No. of users try to access system at a time.This test can be done in two waysManual Testing. 2.By using the tool, Load Runner.Stress Testing:During this test, test engineer executes our application build under customer expected configuration and peak load to estimate performance.

Data Volume Testing:A tester conducts this test to find maximum size of allowable or maintainable data, by our application build.

Storage Testing:Execution of our application under huge amounts of resources to estimate storage limitations to be handled by our application is called as Storage Testing.

Security Testing:It is also an advanced testing technique and complex to apply. To conduct this tests, highly skilled persons who have security domain knowledge.

This test is divided into three sub tests.Authorization:Verifies authors identity to check he is a authorized user or not.

Access Control:Also called as Privileges testing. The rights given to a user to do a system task.

Encryption / Decryption:Encryption- To convert actual data into a secret code which may not be understandable to others.Decryption- Converting the secret data into actual data.

User Acceptance Testing:After completion of all possible system tests execution, our organization concentrate on user acceptance test to collect feed back.To conduct user acceptance tests, they are following two approaches like Alpha () - Test and Beta () -Test.

Note:In s/w development projects are two types based on the products like software application ( also called as Project ) and Product.

Software Application ( Project ) :Get requirements from the client and develop the project. This software is for only one company. And has specific customer. For this Alpha test will be done.

Product :Get requirements from the market and develop the project. This software may have more than one company. And has no specific customer. For this - Version or Trial version will be released in the market to do Beta test.

Testing during Maintenance: After the completion of UA Testing, our organization concentrate on Release Team (RT) formation. This team conducts Port Testing in customer site, to estimate completeness and correctness of our application installation.

During this Port testing Release team validate below factors in customer site:

Compact Installation (Fully correctly installed or not)On screen displaysOverall FunctionalityInput device handlingOutput device handlingSecondary Storage HandlingOS Error handlingCo-existence with other SoftwareThe above tests are done by the release team. After the completion of above testing, the Release Team will gives training and application support in customer site for a period.

During utilization of our application by customer site people, they are sending some Change Request (CR) to our company. When CR is received the following steps are doneBased on the type of CR there are two types,EnhancementMissed Defect

Testing Stages Vs Roles:

Reviews in Analysis Business Analyst / Functional Lead.Reviews in Design Technical Support / Technical Lead.Unit Testing Senior Programmer.Integration Testing Developer / Test Engineer.Functional & System Testing Test Engineer.User Acceptance Testing Customer site people with involvement of testing team.Port Testing Release Team.Testing during Maintenance Change Control Board

Testing Stages

Roles

Reviews in Analysis-Business Analyst / Functional Lead.

Reviews in Design-Technical Support / Technical Lead.

Unit Testing-Senior Programmer.

Integration Testing-Developer / Test Engineer.

Functional & System Testing-Test Engineer.

User Acceptance Testing-Customer site people with involvement of Testing team.

Port Testing-Release Team.

Testing during Maintenance/ Test Software Changes-Change Control Board

Testing Team:

From refinement form of V-Model small scale companies and medium scale companies are maintaining separate testing team for some of the stages in LCT.In their teams organisation maintains below roles

Quality Control: Defines the objectives of TestingQuality Assurance: Defines approach done by Test ManagerTest Manager: Schedule that approachTest Lead: Maintain testing team with respect to the test planTest Engineer: Conducts testing to find defectsQuality Control: Defines the objectives of TestingQuality Assurance: Defines approach done by Test ManagerTest Manager: Schedule, PlanningTest Lead: AppliedTest Engineer: Followed

Testing Terminology:-

Monkey / Chimpanzee Testing:The coverage of main activities only in your application during testing is called as monkey testing.(Less Time)

Gerilla Testing:To cover a single functionality with multiple possibilities to test is called Gerilla ride or Gerilla Testing. (No rules and regulations to test a issue)Exploratory Testing:Level by level of activity coverage of activities in your application during testing is called exploratory testing. (Covering main activities first and other activities next)Sanity Testing:This test is also known as Tester Acceptance Test (TAT). They test for whither developed team build is stable for complete testing or not?

Smoke Testing:An extra shakeup in sanity testing is called as Smoke Testing. Testing team rejects a build to development team with reasons, before start testing.

Bebugging:Development team release a build with known bugs to testing them.

Bigbang Testing:A single state of testing after completion of all modules development is called Bigbang testing. It is also known as informal testing.

Incremental Testing:A multiple stages of testing process is called as incremental testing. This is also known as formal testing.

Static Testing:Conduct a test without running an application is called as Static Testing.Ex:User Interface Testing

Dynamic Testing:Conduct a test through running an application is called as Dynamic Testing.Ex:Functional Testing, Load Testing, Compatibility Testing

Manual Vs Automation:A tester conduct a test on application without using any third party testing tool. This process is called as Manual Testing.

A tester conduct a test with the help of software testing tool. This process is called as Automation.

Need for Automation:When tools are not available they will do manual testing only. If your company already has testing tools they may follow automation.

For verifying the need for automation they will consider following two types:

Impact of the test:It indicates test repetition

Criticality:Load Testing, for 1000 users.

Criticality indicates complex to apply that test manually. Impact indicates test repetition.

Retesting:Re execution of our application to conduct same test with multiple test data is called Retesting.

Regression Testing:The re execution of our test on modified build to ensure bug fix work and occurrences of side effects is called regression testing.

Any dependent modules may also cause side effects

Selection of Automation:Before starting one project level testing by one separate testing team, corresponding project manager or test manager or quality analyst defines the need of test automation for that project depends on below factors.

Type of external interface:GUI Automation.CUI Manual.

Size of external interface:Size of external interface is Large Automation.Size of external interface is Small Manual.

Expected No. of Releases:Several Releases Automation.Less Releases Manual.

Maturity between expected releases:More Maturity Manual.Less Maturity Automation.Tester Efficiency:Knowledge of automation on tools to test engineers Automation.No Knowledge of automation on tools to test engineers Manual.Support from Senior Management:Management accepts Automation.Management rejects Manual.

Testing Policy:It is a company level document and developed by QC people. This document defines testing objectives, to develop a quality software.Test Strategy:Scope & Objective: Definition, need and purpose of testing in your in your organizationBusiness Issues: Budget Controlling for testingTest approach: defines the testing approach between development stages and testing factors.TRM: Test Responsibility Matrix or Test Matrix defines mapping between test factors and development stages.Test environment specifications: Required test documents developed by testing team during testing.Roles and Responsibilities: Defines names of jobs in testing team with required responsibilities.Communication & Status Reporting: Required negotiation between two consecutive roles in testing.Testing measurements and metrics: To estimate work completion in terms of Quality Assessment, Test management process capability.Test Automation: Possibilities to go test automation with respect to corresponding project requirements and testing facilities / tools available (either complete automation or selective automation)Defect Tracking System: Required negotiation between the development and testing team to fix defects and resolve.Change and Configuration Management: required strategies to handle change requests of customer site.Risk Analysis and Mitigations: Analyzing of future common problems appears during testing and possible solutions to recover.Training plan: Need of training for testing to start/conduct/apply.Test Factor:A test factor defines a testing issue. There are 15 common test factors in S/w Testing.

Ex:

QC QualityPM/QA/TM Test FactorTL Testing TechniquesTE Test cases

PM/QA/TM Ease of useTL UI testingTE MS 6 Rules

PM/QA/TM PortableTL Compatibility TestingTE Run on different OS

Test Factors:Authorization:Validation of users to connect to applicationSecurity TestingFunctionality / Requirements TestingAccess Control:Permission to valid user to use specific serviceSecurity TestingFunctionality / Requirements TestingAudit Trail:Maintains metadata about operationsError Handling TestingFunctionality / Requirements TestingCorrectness:Meet customer requirements in terms of functionalityAll black box Testing TechniquesContinuity in Processing:Inter process communicationExecution TestingOperations TestingCoupling:Co existence with other application in customer siteInter Systems TestingEase of Use:User friendlinessUser Interface TestingManual Support TestingEase of Operate:Ease in operationsInstallation testingFile Integrity:Creation of internal files or backup filesRecovery TestingFunctionality / Requirements TestingReliability:Recover from abnormal situations or not. Backup files using or notRecovery TestingStress TestingPortable:Run on customer expected platformsCompatibility TestingConfiguration TestingPerformance:Speed of processingLoad TestingStress TestingData Volume TestingStorage TestingService Levels:Order of functionalitiesStress TestingFunctionality / Requirements TestingMethodology:Follows standard methodology during testingCompliance TestingMaintainable:Whither application is long time serviceable to customers or notCompliance Testing (Mapping between quality to testing connection)

Quality Gap:A conceptual gap between Quality Factors and Testing process is called as Quality Gap.

Test Methodology:Test strategy defines over all approach. To convert a over all approach into corresponding project level approach, quality analyst / PM defines test methodology.Step 1: Collect test strategyStep 2: Project type

Project TypeInformation Gathering & AnalysisDesignCodingSystem TestingMaintenance

TraditionalYYYYY

Off-the-ShelfXXXYX

MaintenanceXXXXY

Step 3: Determine application type: Depends on application type and requirements the QA decrease number of columns in the TRM.Step 4: Identify risks: Depends on tactical risks, the QA decrease number of factors (rows) in the TRM.Step 5: Determine scope of application: Depends on future requirements / enhancements, QA try to add some of the deleted factors once again. (Number of rows in the TRM)Step 6: Finalize TRM for current projectStep 7: Prepare Test Plan for work allocation.

PET (Process Experts Tools and Technology):It is an advanced testing process developed by HCL, Chennai.This process is approved by QA forum of India. It is a refinement form of V-Model

Test Planning:After completion of test initiation, test plan author concentrates on test plan writing to define what to test, how to test, when to test and who to test .

What to test - Development PlanHow to test - S/wRSWhen to test - Design DocumentsWho to test - Team Formation

1.Team FormationIn general test planning process starts with testing team formation, depends on below factors.

Availability of TestersTest DurationAvailability of test environment resourcesThe above three are dependent factors.

Test Duration:Common market test team duration for various types of projects.

C/S, Web, ERP projects - SAP, VB, JAVA Small - 3-5 monthsSystem Software - C, C++ - Medium 7-9 monthsMachine Critical - Prolog, LISP - Big - 12-15 months

System Software Projects: Network, Embedded, Compilers Machine Critical Software: Robotics, Games, Knowledge base, Satellite, Air Traffic.

2.Identify tactical RisksAfter completion of team formation, test plan author concentrates on risks analysis and mitigations.

1) Lack of knowledge on that domain2) Lack of budget3) Lack of resources(h/w or tools)4) Lack of testdata (amount)5) Delays in deliveries(server down)6) Lack of development process rigor7) Lack of communication( Ego problems)

3.Prepare Test Plan

Format:

1) Test Plan id: Unique number or name2) Introduction: About Project3) Test items: Modules4) Features to be tested: Responsible modules to test5) Feature not to be tested: Which ones and why not?6) Feature pass/fail criteria: When above feature is pass/fail?7) Suspension criteria: Abnormal situations during above features testing.8) Test environment specifications: Required docs to prepare during testing9) Test environment: Required H/w and S/w10) Testing tasks: what are the necessary tasks to do before starting testing11) Approach: List of Testing Techniques to apply12) Staff and training needs: Names of selected testing Team13) Responsibilities: Work allocation to above selected members14) Schedule: Dates and timings15) Risks and mitigations : Common non technical problems16) Approvals: Signatures of PM/QA and test plan author

4.Review Test Plan

After completion of test plan writing test plan author concentrate on review of that document for completeness and correctness. In this review, selected testers also involved to give feedback. In this reviews meeting, testing team conducts coverage analysis.

S/wRS based coverage ( What to test )Risks based coverage ( Analyze risks point of view )TRM based coverage ( Whither this plan tests all tests given in TRM )

Test Design:After completion of test plan and required training days, every selected test engineer concentrate on test designing for responsible modules. In this phase test engineer prepares a list of testcases to conduct defined testing, on responsible modules.

There are three basic methods to prepare testcases to conduct core level testing.

Business Logic based testcase design Input Domain based testcase design User Interface based testcase design

Business Logic based testcase design:In general test engineers are writing list of testcases depends on usecases / functional specifications in S/wRS. A usecase in S/wRS defines how a user can use a specific functionality in your application.

To prepare testcases depends on usecases we can follow below approach:

Step 1: Collect responsible modules usecasesStep 2: select a usecase and their dependencies ( Dependent & Determinant )Step 2-1: identify entry conditionStep 2-2: identify input requiredStep 2-3: identify exit conditionStep 2-4: identify output / outcomeStep2-5: study normal flowStep 2-6: study alternative flows and exceptionsStep3: prepare list of testcases depends on above studyStep 4: review testcases for completeness and correctness

TestCase Format:

After completion of testcases selection for responsible modules, test engineer prepare an IEEE format for every test condition.

TestCase Id : Unique number or nameTestCase Name : Name of the test conditionFeature to be tested : Module / Feature / ServiceTestSuit Id : Parent batch Ids, in which this case is participating as a member.Priority : Importance of that testcasePo Basic functionalityP1 General Functionality (I/p domain, Error handling )P2 Cosmetic TestCases(Ex: p0 os, p1-difft oss, p2 look & feel)Test Environment: Required H/w and S/w to execute the test casesTest Effort: (Person Per Hour or Person / Hr) Time to execute this test case ( 20 Mins )Test Duration: Date of executionTest Setup: Necessary tasks to do before start this case executionTest Procedure: Step by step procedure to execute this testcase.TestCase Pass/Fail Criteria: When that testcase is Pass, When that testcase is fail

Input Domain based TestCase Design:To prepare functionality and error handling testcases, test engineers are using UseCases or functional specifications in S/wRS. To prepare input domain testcases test engineers are depending on data model of the project (ERD & LLD)

Step1: Identify input attributes in terms of size, type and constraints.(size- range, type int, float constraint Primary key)Step2: Identify critical attributes in that list, which are participating in data retrievals andmanipulations.Step3: Identify non critical attributes which are input, output type.Step4: Prepare BVA & ECP for every attribute.

ECP ( Type )BVA ( Size / Range )

Input AttributeValidInvalidMinimumMaximum

Figure: Data Matrix

User Interface based testcase design:To conduct UI testing, test engineer write a list of test cases, depends on our organization level UI rules and global UI conventions.

For preparing this UI testcases they are not studying S/wRS, LLDD etcFunctionality testcases source: S/wRS. I/P domain testcases source: LLDD

Testcases: For all projects applicableTestcase1: Spelling checkingTesecase2: Graphics checking (alignment, font, style, text, size, micro soft 6 rules)Testcase3: Meaningful error messages or not. (Error Handling Testing related message is coming or not. Here they are testing that message is easy to understand or not)TestCase4: Accuracy of data displayed (WYSIWYG) (Amount, d o b)Testcase5: Accuracy of data in the database as a result of user input.(Tc4 screen level, tc5 at database level)Testcase6: Accuracy of data in the database as a result of external factors?

Testcase7: Meaningful Help messages or not?(First 6 tc for uit and 7 manual support testing)

Review Testcases:After completion of testcases design with required documentation [IEEE] for responsible modules, testing team along with test lead concentrate on review of testcases for completeness and correctness. In this review testing team conducts coverage analysis

Business Requirements based coverageUseCases based coverageData Model based coverageUser Interface based coverageTRM based coverageBusiness RequirementsSources (Use Cases, Data Model)TestCases

*********** * *

***** * *

***** * *

Figure: Requirements Validation / Traceability Matrix.

Test Execution levels Vs Test Cases:Level 0 P0Level 1 P0, P1 and P2 testcases as batchesLevel 2 Selected P0, P1 and P2 testcases with respect to modificationsLevel 3 Selected P0, P1 and P2 testcases at build.

Test Harness = Test Environment + Test Bed

Build Version Control:Unique numbering system. ( FTP or SMTP)

After defect reporting the testing team may receiveModified BuildModified ProgramsTo maintain this original builds and modified builds, development team use version control softwares.

Level 0 (Sanity / Smoke / TAT):After receiving initial build from development team, testing team install into test environment. After completion of dumping / installation testing team ensure that basic functionality of that build to decide completeness and correctness of test execution.

During this testing, testing team observes below factors on that initial build.

Understandable: Functionality is understandable to test engineer.Operable: Build is working without runtime errors in test environment.Observable: Process completion and continuation in build is estimated by tester.Controllable: Able to Start/ Stop processes explicitly.Consistent: Stable navigationsMaintainable: No need of reinstallationsSimplicity: Short navigations to complete task.Automatable: Interfaces supports automation test script creation.This level-0 testing is also called as Testability or Octangle Testing (bcz based on 8 factors).

Test Automation:After receiving a stable build from development team, testing team concentrate on test automation.Test Automation two types: Complete and Selective.

Level-1: (Comprehensive Testing):After completion of stable build receiving from development team and automation, testing team starts test execution of their testcases as batches. The test batch is also known as TestSuit or test set. In every batch, base state of one testcase is end state of previous testcase.During this test batches execution, test engineers prepares test log with three types of entries.PassedFailedBlockedPassed:All expected values are equal to actual.Failed:Any expected value is variated with actual.Blocked:Corresponding testcases are failed.

Level-2 Regression Testing:Actually this Regression testing is part of Level-1 testing. During comprehensive test execution, testing team reports mismatches to development team as defects. After receiving that defect, development team performs modifications in coding to resolve that accepted defects. When they release modified build, testing team concentrate on regression testing before conducts remaining comprehensive testing.

Severity:Seriousness of the defect defined by the tester through Severity (Impact and Criticality) importance to do regression testing. In organizations they will be giving three types of severity like High, Medium and Low.

High:Without resolving this mismatch tester is not able to continue remaining testing. (Show stopper).Medium:Able to continue testing, but resolve must.Low:May or may not resolve.

Ex:High: Database not connecting.Medium: Input domain wrong. (Accepting wrong values also)Low: Spelling mistake.

Xyz are three dependent modules. If u find bug in z, then

Do on z and colleges: HighFull z module: MediumPartial z module: Low

Possible ways to do Regression Testing:

Case 1:If development team resolved bug and its severity is high, testing team will re execute all P0, P1 and carefully selected P2 test cases with respect to that modification.

Case 2:If development team resolved bug and its severity is medium, testing team will re execute all P0, selected P1 [80-90 %] and some of P2 test cases with respect to that modification.

Case 3:If development team resolved bug and its severity is low, testing team will re execute some of the P0, P1, P2 test cases with respect to that modification.

Case 4:If development team performs modifications due to project requirement changes, testing team reexecute all P0 and selected testcases.

Severity: With respect to functionalityPriority: With respect to customer.

Severity: All defects are not with same severity.Priority: All defects are not with same priority.

Severity: Seriousness of the defect.Priority: Importance of the defect.

Severity: Project functionality point of view important.Priority: Customer point of view important.

Defect Reporting and Tracking:During comprehensive test execution, test engineers are reporting mismatches to development team as defect reports in IEEE format.

Defect Id: A unique number or name.Defect Description: Summary of defect.Build Version Id: Parent build version number.Feature: Module / FunctionalityTestcase name and Description: Failed testcase name with descriptionReproducible: (Yes / No)If yes, attach test procedure.If No, attach snapshots and strong reasonsSeverity: High / Medium / LowPriorityStatus: New / Reopen (after 3 times write new programs)Reported by: Name of the test engineerReported on: Date of SubmissionSuggested fix: optionalAssign to: Name of PMFixed by: PM or Team LeadResolved by: Name of the DeveloperResolved on: Date of solvingResolution type:Approved by: Signature of the PMDefect Age: The time gap between resolved on and reported on.Defect Submission:

Figure: Large Scale OrganizationsDefect Submission:

Figure: Small Scale OrganizationsDefect Status Cycle:

Bug Life Cycle:Resolution Type:There are 12 resolution types such asDuplicate: Rejected due to defect like same as previous reported defect.Enhancement: Rejected due to defect related to future requirement of the customer.H/w Limitation: Raised due to limitations of hardware (Rejected)S/w Limitation: Rejected due to limitation of s/w technology.Functions as design: Rejected due to coding is correct with respect to design documents.Not Applicable: Rejected due to lack of correctness in defect.No plan to fix it: Postponed part timely (Not accepted and rejected)Need for More Information: Developers want more information to fix. (Not accepted and rejected)Not Reproducible: Developer want more information due to the problem is not reproducible. (Not accepted and rejected)User misunderstanding: (Both argues you r thinking wrong) (Extra negotiation between tester and developer)Fixed: Opened a bug to resolve (Accepted)Fixed Indirectly: Differed to resolve (Accepted)Types of Bugs:

UI bugs: (Low severity)Spelling mistake: High PriorityWrong alignment: Low Priority

Input Domain bugs: (Medium severity)Object not taking Expected values: High PriorityObject taking Unexpected values: Low Priority

Error Handling bugs: (Medium severity)Error message is not coming: High PriorityError message is coming but not understandable: Low Priority

Calculation bugs: (High severity)Intermediate Results Failure: High PriorityFinal outputs are Wrong: Low Priority

Service Levels bugs: (High severity)Deadlock: High PriorityImproper order of Services: Low Priority

Load condition bugs: (High severity)Memory leakage under load: High PriorityDoesn't allows customer expected load: Low Priority

Hardware bugs: (High severity)Printer not connecting: High PriorityInvalid printout: Low Priority

Boundary Related Bugs: (Medium Severity)

Id control bugs: (Medium severity) Wrong version no, Logo

Version Control bugs: (Medium severity) Difference between two consecutive versions

Source bugs: (Medium severity) Mismatch in help documents

Test Closure:After completion of all possible testcase execution and their defect reporting and tracking, test lead conduct test execution closure review along with test engineers.

In this review test lead depends on coverage analysis:

BRS based coverageUseCases based coverage (Modules)Data Model based coverage (i/p and op)UI based coverage (Rules and Regulations)TRM based coverage (PM specified tests are covered or not)

Analysis of the differed bugs: Whither deferred bugs are postponable or not.

Testing team try to execute the high priority test cases once again to confirm correctness of master build.

Final Regression Process:Gather requirementsEffort estimation (Person/Hr)Plan RegressionExecute RegressionReport Regression

User Acceptance Testing:After completion of test execution closure review and final regression, our organization concentrates on UAT to collect feed back from customer / customer site like people.There are two approaches:Alpha testingBeta testing

SignOff:After completion of UA and then modifications, test lead creates Test Summary Report (TSR). It is a part of s/w release note. This TSR consists of

Test Strategy / Methodology (what tests)System Test Plan (schedule)Traceability Matrix (mapping requirements and testcases)Automated Test Scripts (TSL + GUI map entries)Final Bug summary ReportBug IdDescriptionFound ByStatus(Closed / Deferred)SeverityModule / FunctionalityComments

Case Study (Schedule for 5 Months):DeliverableResponsibilityCompletion Time

TestCase SelectionTest Engineer20-30 days

TestCase ReviewTest Lead, Test Engineer4-5 days

RVM / RTMTest Lead1 day

Sanity & Test AutomationTest Engineer20-30 days

Test Execution as BatchesTest Engineer40-60 days

Test ReportingTest Engineer & Test LeadOn going during test execution

Communication and Status ReportingEveryone in testing teamWeakly twice

Final Regression Testing & Closer ReviewTest Engineer and Test Lead4-5 days

User Acceptance TestingCustomer Site People ( Involvement of Testing Team)5-10 days

Test Summary Report(Sign Off)Test Lead1-2 days

Auditing:During testing and maintenance, testing team conducts audit meetings to estimate status and required improvements. In this auditing process they can use three types of measurements and metrics.

Quality Measurement Metrics:These measurements are used by QA or PM to estimate achievement of quality in current project testing [monthly once]Product Stability:

Sufficiency: Requirements Coverage Type Trigger Analysis (Mapping between covered requirements and applied tests)

Defect Severity Distribution Organization trend limit check: Organisation trend limit check

Test Management Measurements:These measurements are used by test lead during test execution of current project [weakly twice]

Test Status Executed tests In progress Yet to execute

Delays in Delivery Defect Arrival Rate Defect Resolution Rate Defect AgingTest Effort Cost of finding a defect (Ex: 4 defects / person day)Process Capability Measurements:These measurements are used by quality analyst and test management to improve the capability of testing process for upcoming projects testing. (It depends on old projects maintenance level feedback)

Test Efficiency Type-Trigger Analysis Requirements Coverage

Defect Escapes Type-Phase analysis.(What type of defects my testing team missed in which phase of testing)Test Effort Cost of finding a defect (Ex: 4 defects / person day)This topic looks at Static Testing techniques. These techniques are referred to as "static" because the software is not executed; rather the specifications, documentation and source code that comprise the software are examined in varying degrees of detail.There are two basic types of static testing. One of these is people-based and the other is tool-based. People-based techniques are generally known as reviews but there are a variety of different ways in which reviews can be performed. The tool-based techniques examine source code and are known as "static analysis". Both of these basic types are described in separate sections below.

What are Reviews?Reviews is the generic name given to people-based static techniques. More or less any activity that involves one or more people examining something could be called a review. There are a variety of different ways in which reviews are carried out across different organisations and in many cases within a single organisation. Some are very formal, some are very informal, and many lie somewhere between the two. The chances are that you have been involved in reviews of one form another.One person can perform a review of his or her own work or of someone elses work. However, it is generally recognised that reviews performed by only one person are not as effective as reviews conducted by a group of people all examining the same document (or whatever it is that is being reviewed).

Review techniques for individualsDesk checking and proof reading are two techniques that can be used by individuals to review a document such as a specification or a piece of source code. They are basically the same processes: the reviewer double-checks the document or source code on their own. Data stepping is a slightly different process for reviewing source code: the reviewer follows a set of data values through the source code to ensure that the values are correct at each step of the processing.

Review techniques for groupsThe static techniques that involve groups of people are generically referred to as reviews. Reviews can vary a lot from very informal to highly formal, as will be discussed in more detail shortly. Two examples of types of review are walkthroughs and Inspection. A walkthrough is a form of review that is typically used to educate a group of people about a technical document. Typically the author "walks" the group through the ideas to explain them and so that the attendees understand the content. Inspection is the most formal of all the formal review techniques. Its main focus during the process is to find faults, and it is the most effective review technique in finding them (although the other types of review also find some faults). Inspection is discussed in more detail below.Reviews and the test process

Benefits of reviewsThere are many benefits from reviews in general. They can improve software development productivity and reduce development timescales. They can also reduce testing time and cost. They can lead to lifetime cost reductions throughout the maintenance of a system over its useful life. All this is achieved (where it is achieved) by finding and fixing faults in the products of development phases before they are used in subsequent phases. In other words, reviews find faults in specifications and other documents (including source code) which can then be fixed before those specifications are used in the next phase of development.Reviews generally reduce fault levels and lead to increased quality. This can also result in improved customer relations.

Reviews are cost-effectiveThere are a number of published figures to substantiate the cost-effectiveness of reviews. Freedman and Weinberg quote a ten times reduction in faults that come into testing with a 50% to 80% reduction in testing cost. Yourdon in his book on Structured Walkthroughs found that faults were reduced by a factor of ten. Gilb and Graham give a number of documented benefits for software Inspection, including 25% reduction in schedules, a 28 times reduction in maintenance cost, and finding 80% of defects in a single pass (with a mature Inspection process) and 95% in multiple passes.

What can be Inspected?Anything written down can be Inspected. Many people have the impression that Inspection applies mainly to code (probably because Fagan's original article was on "Design and code inspection"). However, although Inspection can be performed on code, it gives more value if it is performed on more "upstream" documents in the software development process. It can be applied to contracts, budgets, and even marketing material, as well as to policies, strategies, business plans, user manuals, procedures and training material. Inspection also applies to all types of system development documentation, such as requirements, feasibility studies and designs. It is also very appropriate to apply to all types of test documentation such as test plans, test designs and test cases. In fact even with Fagan's original method, it was found to be very effective applied to testware.

What can be reviewed?Anything that can be Inspected can also be reviewed, but reviews can apply to more things than just those ideas that are written down. Reviews can be done on visions, strategic plans and "big picture" ideas. Project progress can be reviewed to assess whether work is proceeding according to the plans. A review is also the place where major decisions may be made, for example about whether or not to develop a given feature.Reviews and Inspections are complementary. Inspection excludes discussion and solution optimising, but these activities are often very important. Any type of review that tries to combine more than one objective tends not to work as well as those with a single focus. It works better to use Inspection to find faults and to use reviews to discuss, come to a consensus and make decisions.

What to review / Inspect?Looking at the V life cycle diagram that was discussed in Session 2, reviews and Inspections apply to everything on the left-hand side of the V-model. Note that the reviews apply not only to the products of development but also to the test documentation that is produced early in the life cycle. We have found that reviewing the business needs alongside the Acceptance Tests works really well. It clarifies issues that might otherwise have been overlooked. This is yet another way to find faults as early as possible in the life cycle so that they can be removed at the least cost.

Costs of reviewsYou cannot gain the benefits of reviews without investing in doing them, and this does have a cost. As a rough guide, something between 5% and 15% of project effort would typically be spent on reviews. If Inspections are being introduced into an organisation, then 15% is a recommended guideline. Once the Inspection process is mature, this may go down to around 5%. Note that 10% is half a day a week.Remember that the cost of reviews always needs to be balanced against the cost of not doing them, and finding the faults (which are already there) much later when it will be much more expensive to fix them.The costs of reviews are mainly in people's time, i.e. it is an effort cost, but the cost varies depending on the type of review. The leader or moderator of the review may need to spend time in planning the review (this would not be done for an informal review, but is required for Inspection). The studying of the documents to be reviewed by each participant on their own is normally the main cost (although in practice this may not be done as thoroughly as it should). If a meeting is held, the cost is the length of the meeting times the number of people present. The fixing of any faults found or the resolution of issues found may or may not be followed up by the leader. In the more formal review techniques, metrics or statistics are recorded and analysed to ensure the continued effectiveness and efficiency of the review process. Process improvement should also be a part of any review process, so that lessons learned in a review can be folded back into development and testing processes. (Inspection formally includes process improvement; most other forms of review do not.)

Types of reviewWe have now established that reviews are an important part of software testing. Testers should be involved in reviewing the development documents that tests are based on, and should also review their own test documentation.In this section, we will look at different types of reviews, and the activities that are done to a greater or lesser extent in all of them. We will also look at the Inspection process in a bit more detail, as it is the most effective of all review types.

Characteristics of different review typesInformal reviewAs its name implies, this is very much an ad hoc process. Normally it simply consists of someone giving their document to someone else and asking them to look it over. A document may be distributed to a number of people, and the author of the document would hope to receive back some helpful comments. It is a very cheap form of review because there is no monitoring of metrics, no meeting and no follow--up. It is generally perceived to be useful, and compared to not doing any reviews at all, it is. However, it is probably the least effective form of review (although no one can prove that since no measurements are ever done!)

Technical review or Peer reviewA technical review may have varying degrees of formality. This type of review does focus on technical issues and technical documents. A peer review would exclude managers from the review. The success of this type of review typically depends on the individuals involved - they can be very effective and useful, but sometimes they are very wasteful (especially if the meetings are not well disciplined), and can be rather subjective. Often this level of review will have some documentation, even if just a list of issues raised. Sometimes metrics will be kept. This type of review can find important faults, but can also be used to resolve difficult technical problems, for example deciding on the best way to implement a design.Decision-making reviewThis type of review is closely related to the previous one (in fact the syllabus does not distinguish them). In this type of review, which may be technical or managerial, the focus is on discussing the issues, coming to a consensus and making decisions, for example about whether a given feature should be included in the next release or not.

WalkthroughA walkthrough is typically led by the author of a document, for the purpose of educating the participants about the content so that everyone understands the same thing. A walkthrough may include "dry runs" of business scenarios to show how the system would handle certain specific situations. For technical documents, it is often a peer group technique.

InspectionAn Inspection is the most formal of the formal review techniques. There are strict entry and exit criteria to the Inspection process, it is led by a trained Leader or moderator (not the author), there are defined roles for searching for faults based on defined rules and checklists. Metrics are a required part of the process.Characteristics of reviews in general

Objectives and goalsThe objectives and goals of reviews in general normally include the verification and validation of documents against specifications and standards.Some types of review also have an objective of achieving a consensus among the attendees (but not Inspection).Some types of review have process improvement as a goal (this is formally included in Inspection).

ActivitiesThere are a number of activities that may take place for any review.The planning stage is part of all except informal reviews.In Inspection (and possibly other reviews), an overview or kickoff meeting is held to put everyone "in the picture" about what is to be reviewed and how the review is to be conducted. This pre-meeting may be a walkthrough in its own right.

The preparation or individual checking is usually where the greatest value is gained from a review process. Each person spends time on the review document (and related documents), becoming familiar with it and/or looking for faults. In some reviews, this part of the process is optional (at least in practice). In Inspection it is required.

Most reviews include a meeting of the reviewers. Informal reviews probably do not, and Inspection does not hold a meeting if it would not add economic value to the process. Sometimes the meeting time is the only time people actually look at the document. Sometimes the meetings run on for hours and discuss trivial issues. The best reviews (of any level of formality) ensure that value is gained from the meeting.The more formal review techniques include follow-up of the faults or issues found to ensure that action has been taken on everything raised (Inspection does, as do some forms of technical or peer review).The more formal review techniques collect metrics on cost (time spent) and benefits achieved.Roles and responsibilities

For any of the formal reviews (i.e. not informal reviews), there is someone responsible for the review of a document (the individual review cycle). This may be the author of the document (walkthrough) or an independent Leader or moderator (formal reviews and Inspection). The responsibility of the Leader is to ensure that the review process works. He or she may distribute documents, choose reviewers, mentor the reviewers, call and lead the meeting, perform follow-up and record relevant metrics.

The author of the document being reviewed or Inspected is generally included in the review, although there are some variants that exclude the author. The author actually has the most to gain from the review in terms of learning how to do their work better (if the review is conducted in the right spirit!).The reviewers or Inspectors are the people who bring the added value to the process by helping the author to improve his or her document. In some types of review, individual checkers are given specific types of fault to look for to make the process more effective.

Managers have an important role to play in reviews. Even if they are excluded from some types of peer review, they can (and should) review management level documents with their peers. They also need to understand the economics of reviews and the value that they bring. They need to ensure that the reviews are done properly, i.e. that adequate time is allowed for reviews in project schedules.There may be other roles in addition to these, for example an organisation-wide co-ordinator who would keep and monitor metrics, or someone to "own" the review process itself - this person would be responsible for updating forms, checklists, etc.Deliverables

The main deliverable from a review is the changes to the document that was reviewed. The author of the document normally edits these. For Inspection, the changes would be limited to faults found as violations of accepted rules. In other types of review, the reviewers suggest improvements to the document itself. Generally the author can either accept or reject the changes suggested.If the author does not have the authority to change a related document (e.g. if the review found that a correct design conflicted with an incorrect requirement specification), then a change request may be raised to change the other document(s).

For Inspection and possibly other types of review, process improvement suggestions are a deliverable. This includes improvements to the review or Inspection process itself and also improvements to the development process that produced the document just reviewed. (Note that these are improvements to processes, not to reviewed documents.)The final deliverable (for the more formal types of review, including Inspection) is the metrics about the costs, faults found, and benefits achieved by the review or Inspection process.

PitfallsReviews are not always successful. They are sometimes not very effective, so faults that could have been found slip through the net. They are sometimes very inefficient, so that people feel that they are wasting their time. Often insufficient thought has gone into the definition of the review process itself - it just evolves over time.

One of the most common causes for poor quality in the review process is lack of training, and this is more critical the more formal the review.Another problem with reviews is having to deal with documents that are of poor quality. Entry criteria to the review or Inspection process can ensure that reviewers' time is not wasted on documents that are not worthy of the review effort.

A lack of management support is a frequent problem. If managers say that they want reviews to take place but don't allow any time in the schedules for the, this is only "lip service" not commitment to quality.Long-term, it can be disheartening to become expert at detecting faults if the same faults keep on being injected into all newly written documents. Process improvements are the key to long-term effectiveness and efficiency.

Static analysisWhat can static analysis do?Static analysis is a form of automated testing. It can check for violations of standards and can find things that may or may not be faults. Static analysis is descended from compiler technology. In fact, many compilers may have static analysis facilities available for developers to use if they wish. There are also a number of stand-alone static analysis tools for various different computer programming languages. Like a compiler, the static analysis tool analyses the code without executing it, and can alert the developer to various things such as unreachable code, undeclared variables, etc.Static analysis tools can also compute various metrics about code such as cyclomatic complexity.

Data flow analysis:Data flow analysis is the study of program variables. A variable is basically a location in the computer's memory that has a name so that the programmer can refer to it more conveniently in the source code. When a value is put into this location, we say that the variable is "defined". When that value is accessed, we say that it is "used".

For example, in the statement "x = y + z", the variables y and z are used because the values that they contain are being accessed and added together. The result of this addition is then put into the memory location called x, so x is defined.The significance of this is that static analysis tools can perform a number of simple checks. One of these checks is to ensure that every variable is defined before it is used. If a variable is not defined before it is used, the value that it contains may be different every time the program is executed and in any case is unlikely to contain the correct value. This is an example of a data flow fault. Another check that a static analysis tool can make is to ensure that every time a variable is defined it is used somewhere later on in the program. If it isnt, then why was defined in the first place? This is known as a data flow anomaly and although can be a perfectly harmless fault, it can also indicate something more serious is at fault.

Control flow analysisControl flow analysis can find infinite loops, inaccessible code, and many other suspicious aspects. However, not all of the things found are necessarily faults; defensive programming may result in code that is technically unreachable.

Cyclomatic complexity:Cyclomatic complexity is related to the number of decisions in a program or control flow graph. The easiest way to compute it is to count the number of decisions (diamond-shaped boxes) on a control flow graph and add 1. Working from code, count the total number of IF's and any loop constructs (DO, FOR, WHILE, REPEAT) and add 1. The cyclomatic complexity does reflect to some extent how complex a code fragment is, but it is not the whole story.

Other static metrics:Lines of code (LOC or KLOC for 1000s of LOC) is a measure of the size of a code module. Operands and operators is a very detailed measurement devised by Halstead, but not much used now. Fan-in is related to the number of modules that call (in to) a given module. Modules with high fan-in are found at the bottom of hierarchies, or in libraries where they are frequently called. Modules with high fan-out are typically at the top of hierarchies, because they call out to many modules (e.g. the main menu). Any module with both high fan-in and high fan-out probably needs re-designing.

Nesting levels relate to how deeply nested statements are within other IF statements. This is a good metric to have in addition to cyclomatic complexity, since highly nested code is harder to understand than linear code, but cyclomatic complexity does not distinguish them.Other metrics include the number of function calls and a number of metrics specific to object-oriented code.

Limitations and advantages:Static analysis has its limitations. It cannot distinguish "fail-safe" code from real faults or anomalies, and may create a lot of spurious failure messages. Static analysis tools do not execute the code, so they are not a substitute for dynamic testing, and they are not related to real operating conditions.

However, static analysis tools can find faults that are difficult to see and they give objective quality information about the code. We feel that all developers should use static analysis tools, since the information they can give can find faults very early when they are very cheap to fix.