Manoa Stream ImprovementsAt Woodlawn Drive Bridge Public Meeting
May 7, 2018
Noelani Elementary School Cafeteria
![Page 2: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/2.jpg)
ProjectPartners • Department of Land and Natural Resources • City and County of Honolulu
• University of Hawaii
![Page 3: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/3.jpg)
WoodlawnDrive Bridge
![Page 4: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/4.jpg)
NeedfortheProject
![Page 5: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/5.jpg)
ProposedImprovements • Repair the riprap upstream of the bridge by installing a new drop structure;
• Repair the riprap downstream of the bridge to create positive flow downstream;
• Remove sediment under the bridge and approximately 400 lineal feet downstream;
• Tree trimming and removal for construction access at the stream and planting new landscaping.
![Page 6: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/6.jpg)
ProposedImprovements
![Page 7: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/7.jpg)
ProposedImprovements
![Page 8: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/8.jpg)
Contractor’sStagingArea
![Page 9: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/9.jpg)
BenefitsoftheProject • Repair grouted riprap upstream and downstream of
the bridge
• Improve drainage flow characteristics
• Ease of maintenance
![Page 10: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/10.jpg)
ConstructionCostand Schedule
• Construction Cost: $2.5 million
• Contractor: Frank Coluccio Construction Company
• Construction Schedule • Approximate Start Date: Mid May 2018
• Approximate End Date: February 2019
• Work Hours: Mon.-Fri. 8 A.M. to 5 P.M. • Contact Person:
Joseph Hart, Construction Manager (808) 216-4918 (mobile) [email protected]
![Page 11: Manoa Stream Improvements At Woodlawn Drive BridgeMicrosoft PowerPoint - Manoa Stream Impr PP 050718_final.pptx Author: ckimbrj Created Date: 5/9/2018 8:17:19 AM ...](https://reader035.fdocuments.us/reader035/viewer/2022070819/5f1aabd2761fbd7b59659004/html5/thumbnails/11.jpg)
Questions?