Amanda Cronauer
Faculty Advisor: Dr. William Bahnfleth14 April 2010
![Page 2: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/2.jpg)
Project BackgroundExisting Mechanical SummaryDesign ObjectivesAlternative DescriptionsGround Source Heat PumpsAir Source Heat PumpsSystem ComparisonFinal Recommendations
Presentation Overview
Amanda Cronauer │ Mechanical Option
Spring 2010
![Page 3: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/3.jpg)
Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Project BackgroundProject Information:
Project Size: 85,355 sfLocation: Havertown, PACost: $21.2 millionStories: Classroom [3], Administration [1]Construction Dates: May 2007-November 2008Delivery Method: Design-Bid-Build
Amanda Cronauer │ Mechanical Option
Spring 2010
Project Team:Owner: Haverford School DistrictArchitect: McKissick Associates ArchitectsGeneral Contractor: John S. McManus, Inc.Structural Engineer: Baker Ingram & Associates, Inc.MEP Engineer: H.F. Lenz Company
![Page 4: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/4.jpg)
Building Layout
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
![Page 5: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/5.jpg)
Building Layout
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
![Page 6: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/6.jpg)
Building Layout
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
![Page 7: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/7.jpg)
Building Layout
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
![Page 8: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/8.jpg)
Building Layout
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
![Page 9: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/9.jpg)
Building Layout
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
![Page 10: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/10.jpg)
Existing Mechanical System
Amanda Cronauer │ Mechanical Option
Spring 2010
Third Floor
Second Floor
First Floor
AHU-1AHU-2
Classroom Wing: [2] Rooftop Variable Air Volume Units Direct Expansion Cooling Hot Water Perimeter Heating Energy Recovery Ventilators [2] Air Cooled Condensing Units
Administration Wing: Rooftop VAV Unit with Energy Recovery Ventilator [AHU-3] [2] Rooftop Constant Volume Units Direct Expansion Cooling Hot Water Heating [3] Air Cooled Condensing Units
AHU-3
AHU-4
AHU-5
Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
![Page 11: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/11.jpg)
Design Objectives
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Improve System PerformanceEnergy ConsumptionEmissionsTotal System Cost
Comparison of Proposed System Performance
![Page 12: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/12.jpg)
Alternatives
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Ground Source Heat Pumps:[+] Decentralized System[+] Higher System Efficiencies[+] Lower Greenhouse Gas Emissions
[-] Increased Construction Costs [-] Impact of Loop on Ecosystem
Air Source Heat Pumps:[+] Decentralized System[+] Higher System Efficiencies[+] Lower Greenhouse Gas Emissions[+] No Extensive Excavation
[-] Utilizes Electricity
Dedicated Outdoor Air:[+] Reduce Load on Heat Pumps[+] Smaller
[-] Utilizes Electricity
![Page 13: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/13.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Systems to be Replaced:
Series Fan Powered Boxes Heat Pump
Rooftop Air Handling Units Dedicated Outdoor Air Unit
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
![Page 14: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/14.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Assumptions:Zoning
Heat Pumps
DOAS Units
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
![Page 15: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/15.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Loop Sizing: Vertical Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
![Page 16: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/16.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Loop Sizing: Vertical Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Entering Water Temperature (°F)
Leaving Water Temperature (°F)
Cooling Load (MBH)
Total Borehole Length (feet)
75 85 1,434 23,959
Cooling Design Information
Entering Water Temperature (°F)
Leaving Water Temperature (°F)
Heating Load (MBH)
Total Borehole Length (feet)
45 35 1,153 25,052
Heating Design Information
![Page 17: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/17.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Loop Sizing: Vertical Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Entering Water Temperature (°F)
Leaving Water Temperature (°F)
Heating Load (MBH)
Total Borehole Length (feet)
45 35 1,153 25,052
Heating Design Information
![Page 18: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/18.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Goals:Meet Mechanical Load
Minimize Construction Cost
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
![Page 19: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/19.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Assumptions: Piping 1” High Density Polyethylene [HDPE]
$0.53 per linear foot 40 foot lengths $4.79 per weld $40.25 per day for welding machine
Grout Constant Price of $5,937 regardless Miscellaneous Site Costs Specified by Number of Boreholes Borehole Driller
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Bore Length Rent Output
(feet) ($/day) (feet/day)
< 225 12190 1800
225 ≤ Lbore ≤ 325 14840 1200
> 325 12190 900
Earth Auger Data
![Page 20: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/20.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Results: Vertical Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
$80,000
$90,000
$100,000
$110,000
$120,000
$130,000
$140,000
$150,000
$160,000
25 45 65 85 105 125 145
A
B
C
![Page 21: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/21.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Results: Vertical Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
$80,000
$90,000
$100,000
$110,000
$120,000
$130,000
$140,000
$150,000
$160,000
25 45 65 85 105 125 145
A
B
C
![Page 22: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/22.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Results:[115] Boreholes[218] feet per borehole$86,889 Total Installed Cost
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
DaysRental Weeks
Cost NumberRental Days
Cost
25,052 115 218 25,070 14 3 $36,570 $13,287 627 2 $3,095 $5,937 $28,000 $86,889
Total Cost
Drill C: Depths Less than 225 feet
Calculated Length
# Boreholes
Length per bore
Actual Length
Dril l ingPipe Cost
Welding Grouting Cost Miscellaneous
Cost
![Page 23: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/23.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
![Page 24: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/24.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
$87,
273
$85,
923
$91,
792
$37,
556
$26,
970
$2,3
57
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
1 2 3
Gas
Electricity
AHSRAE Baseline System Redesigned SystemDesigned System
![Page 25: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/25.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
2,96
6
3,21
1
3,31
9
1,32
0
918
61
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
ASHRAE Baseline As Designed Proposed Redesign
MBH Gas
Electricity
![Page 26: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/26.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
% $ % $
As Designed 9.56 11,936
Redesign 24.58 30,680 19.91 18,744
Savings Over Baseline
Savings Over Designed
System Energy Savings Comparison
CO2 NOX SOXTotal
Redesign Savings
(lbm/year) (lbm/year) (lbm/year) (lbm/year)
ASHRAE Baseline 2.02E+04 3.05E+01 1.64E+03 1.56E+04
As Designed 1.59E+04 2.47E+01 1.15E+03 1.08E+04
Redesign 6.15E+03 1.10E+01 1.03E+02
Greenhouse Gas Emission Data
25% Reduction =
7/19 LEED Points [EA Credit 1]
![Page 27: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/27.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Simple Payback Period:
Redesign:• [67] Heat Pumps= $420,050• [5] DOAS Units= $82,042• Vertical Loop= $86,889• Utility=$94,129
Design: [5] Rooftop AHU’s =$280,000 [5] ACCU’s= $12,000 Utility= $112,893
Simple Payback Period: 10.76 years
![Page 28: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/28.jpg)
Vertical Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Simple Payback Period:
Redesign:• [67] Heat Pumps= $420,050• [5] DOAS Units= $82,042• Vertical Loop= $86,889• Ductwork= $74,531• Utility= $94,129
Design: [5] Rooftop AHU’s =$280,000 [5] ACCU’s= $12,000 Utility= $112,893 Ductwork= $319,850
Simple Payback Period: 1.2 years
![Page 29: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/29.jpg)
Horizontal Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Systems to be Replaced:
Series Fan Powered Boxes Heat Pump
Rooftop Air Handling Units Dedicated Outdoor Air Unit
![Page 30: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/30.jpg)
Horizontal Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Assumptions:Zoning
Heat Pumps
DOAS Units
![Page 31: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/31.jpg)
Horizontal Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Assumptions: Sizing Method Applicable
Horizontal, 6-Pipe Coil
Ground Temperature
![Page 32: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/32.jpg)
Horizontal Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Results:[150] foot per ton loop recommended
[17,925] feet of length required
![Page 33: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/33.jpg)
Horizontal Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
$87,
273
$85,
923
$106
,856
$37,
556
$26,
970
$2,9
08
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
1 2 3
Gas
Electricity
AHSRAE Baseline Redesign SystemDesigned System
![Page 34: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/34.jpg)
Horizontal Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
2,96
6
3,21
1 3,94
5
1,32
0
918 80
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
ASHRAE Baseline As Designed Proposed Redesign
MBH Gas
Electricity
![Page 35: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/35.jpg)
Horizontal Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
% $ % $
As Designed 9.56 11,936
Redesign 12.07 15,065 2.85 3,129
Savings Over Baseline
Savings Over Designed
System Energy Savings Comparison 12% Reduction =
1/19 LEED Point [EA Credit 1]
CO2 NOX SOXTotal
Redesign Savings
(lbm/year) (lbm/year) (lbm/year) (lbm/year)
ASHRAE Baseline 2.02E+04 3.05E+01 1.64E+03 1.43E+04
As Designed 1.59E+04 2.47E+01 1.15E+03 9.55E+03
Redesign 7.40E+03 1.31E+01 1.31E+02
Greenhouse Gas Emission Data
![Page 36: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/36.jpg)
Horizontal Loop Analysis
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Vertical Loop Analysis Systems to be Replaced Assumptions Loop Sizing Loop Optimization
[Construction Management Breadth]
Results Horizontal Loop Analysis
Systems to be Replaced Assumptions Loop Sizing Results
Simple Payback Period:
Redesign:• [67] Heat Pumps= $420,050• [5] DOAS Units= $82,042• Horizontal Loop= $76,898• Ductwork= $74,531• Utility= $109,764
Design: [5] Rooftop AHU’s =$280,000 [5] ACCU’s= $12,000 Utility= $112,893 Ductwork= $319,850
Simple Payback Period: 0.95 years
![Page 37: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/37.jpg)
Air Source Heat Pumps
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Analysis Systems to be Replaced Assumptions Results
Systems to be Replaced:
Series Fan Powered Boxes Heat Pump
Rooftop Air Handling Units Dedicated Outdoor Air Unit
![Page 38: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/38.jpg)
Air Source Heat Pumps
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Analysis Systems to be Replaced Assumptions Results
Assumptions:Zoning
Heat Pumps
DOAS Units
![Page 39: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/39.jpg)
Air Source Heat Pumps
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Analysis Systems to be Replaced Assumptions Results
$87,
273
$85,
923
$83,
442
$37,
556
$26,
970
$19,
942
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
1 2 3
Gas
Electricity
AHSRAE Baseline System Redesign SystemDesigned System
![Page 40: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/40.jpg)
Air Source Heat Pumps
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Analysis Systems to be Replaced Assumptions Results
2,96
6
3,21
1
2,44
0
1,32
0
918
706
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
ASHRAE Baseline As Designed Proposed Redesign
MBH Gas
Electricity
![Page 41: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/41.jpg)
Air Source Heat Pumps
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Analysis Systems to be Replaced Assumptions Results
% $ % $
As Designed 9.56 11,936
Redesign 17.18 21,445 9.20 9,509
Savings Over Baseline
Savings Over Designed
System Energy Savings Comparison17% Reduction =
3/19 LEED Points [EA Credit 1]
CO2 NOX SOXTotal
Redesign Savings
(lbm/year) (lbm/year) (lbm/year) (lbm/year)
ASHRAE Baseline 2.02E+04 3.05E+01 1.64E+03 8.75E+03
As Designed 1.59E+04 2.47E+01 1.15E+03 4.00E+03
Redesign 1.22E+04 1.89E+01 8.82E+02
Greenhouse Gas Emission Data
![Page 42: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/42.jpg)
Air Source Heat Pumps
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Analysis Systems to be Replaced Assumptions Results
Simple Payback Period:
Redesign:• [67] Heat Pumps= $211,403• [5] DOAS Units= $83,042• Ductwork= $74,531• Utility= $103,384
Design: [5] Rooftop AHU’s =$280,000 [5] ACCU’s= $12,000 Utility= $112,893 Ductwork= $319,850
Simple Payback Period: 0.65 years
![Page 43: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/43.jpg)
System Comparison
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
$87,
273
$85,
923
$91,
792
$106
,856
$83,
442
$37,
556
$26,
970
$2,3
57
$2,9
08
$19,
942
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
Baseline As Designed Vertical Loop
Horizontal Loop
Air Source
Gas
Electricity
![Page 44: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/44.jpg)
System Comparison
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
$87,
273
$85,
923
$91,
792
$106
,856
$83,
442
$37,
556
$26,
970
$2,3
57
$2,9
08
$19,
942
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
Baseline As Designed Vertical Loop
Horizontal Loop
Air Source
Gas
Electricity
2,96
6
3,21
1
3,31
9 3,94
5
2,44
0
1,32
0
918
61
80
706
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
ASHRAE Baseline
As Designed Vertical Horizontal Air Source
MBH
Gas
Electricity
![Page 45: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/45.jpg)
System Comparison
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
CO2 NOX SOXTotal
Emissions(lbm/year) (lbm/year) (lbm/year) (lbm/year)
ASHRAE Baseline 2.02E+04 3.05E+01 1.64E+03 2.18E+04
As Designed 1.59E+04 2.47E+01 1.15E+03 1.71E+04
Vertical Loop 6.15E+03 1.10E+01 1.03E+02 6.26E+03
Horizontal Loop 7.40E+03 1.31E+01 1.31E+02 7.54E+03
Air Source 1.22E+04 1.89E+01 8.82E+02 1.31E+04
Greenhouse Gas Emission DataSimple Payback Period:
• Vertical Loop GSHP = [1.2] years
• Horizontal Loop GSHP = [0.95] years
• Air Source Heat Pump= [0.65] years
![Page 46: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/46.jpg)
Final Recommendations
Amanda Cronauer │ Mechanical Option
Spring 2010Project Background
Existing Mechanical Summary
Design Objectives
Alternative Descriptions
Ground Source Heat Pumps
Air Source Heat Pumps
System Comparison
Final Recommendations
Emissions and Fuel Consumption:Vertical Ground Source Heat Pump
Lowest First Cost:Air Source Heat Pump
Fastest Potential Payback:Air Source Heat Pump
LEED Points:Vertical Ground Source Heat Pump
![Page 47: Manoa Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062423/56814bce550346895db8a46b/html5/thumbnails/47.jpg)
QuestionsSpecial Thanks To:• Paul Cronauer, H.F. Lenz Contact• Verne McKissick, McKissick Architects Contact• Dr. Bahnfleth, Faculty Advisor• Penn State Architectural Engineering Mechanical Faculty• Family and Friends for all their support• Fellow AE Students• Jonah, moral support
Amanda Cronauer │ Mechanical Option
Spring 2010