    PROJECT PLAN

    MANDELA DAY

    17 and 18 JULY 2012

    1. BACKGROUND

    The Department of Economic Affairs, Tourism and Environmental Affairs (DETEA) in collaboration with the DistrictMunicipality of Lejweleputswa and the Local Municipality of Matjhabeng will commemorate 2012 Mandela Day atVirginia. This years focus will be on primary health care and education. On the 17 th Jully 2012,work will be done atthe Katleho Hospital and Kgothalang and OR Thambo Clinics. On the 18 th July 2012, work will be done at MamelloHigh School, Reatlehile High School and Tikwe Primary School.

    The Department will also design and landscape a house on stand 2396 in Bronville Welkom. The house belongs to a

    106 years old pensioner. She is the 1st

    time home owner who has been allocated her first house by the Free StateGovernment recently. The department will also assist with the feeding in Vulindlela Public School and the cleaningwhere the school will receive donation of computers from a sponsor.

    COMMUNICATION & ICT

    34 Bojanala Building Private Bag X 20801 Tel +27 (0)51 400 9542Markgraaf Street Bloemfontein Fax +27 (0)51 400 9541

    Bloemfontein 9300 e-mail: [email protected]

  • 7/31/2019 Mandela Day Project Plan DETEA

    2/6

    AREA OF

    PLANNING

    DESCRIPTION OF ACTIVITY PROGRESS DUE DATE PERSONRESPONSIBLE

    2

  • 7/31/2019 Mandela Day Project Plan DETEA

    3/6

    COORDINATION & OVERALLMANAGEMENT

    Meeting was held on the2nd July 2012 with officeof the MEC for the brieffrom the Premiers office

    for Mandela DayActivities

    A team was dispatched toVirginia to ascertain the needsat the identified sites

    12 July 2012 Ms K Ntshala

    COMMUNICATIONS ANDBRANDING

    Concept document Developedfrom Presidency and only oneMessage to be issued to themedia

    Communication to handled allcommunication and ensure thatthe central message is adheredto.

    The Theme of the day is ,This day serves to inspireindividuals to make a

    change for the better

    16 July 2012 Kgotso Tau

    PROGRAMME The MEC will champion the twoday programme which willinclude Councillors fromMatjhabeng andLejwelepuptswa

    1st Draft to be made andsubmitted to the HOD andMEC for approval

    Draft programme submitted tomarketing

    13 July 2012 MashomeZondo

    SPEAKERSIdentify and communicate withspeakers, facilitators andprogramme director

    o MEC and HOD

    Speakers to align themselvesto the central message andmay give a brief outline ofvalues and principles Mandela

    stood for.

    16 July 2012 MashomeZondo

    MEALS, VENUEThe Department will providemeals for the volunteers

    Food will be prepared for 100people for the 17th and 18th.Cooking will be done at KatlehoHospital and at Mamello High

    17 &18/07/12

    L van Rensburg

    3

  • 7/31/2019 Mandela Day Project Plan DETEA

    4/6

    School and will be transportedto other venues.

    TECHNICALEQUIPMENT

    All required resources shouldbe secured by Monday

    All material, save has beensourced

    16th July 2012 Nono/Xoliswaand Supply

    Chain

    VOLUNTEERSDETEA will work incollaboration with theMunicipality to identi fyvolunteers in Virginia

    200 volunteers and the stafffrom DETEA will do the workand ensure that all work iscompleted. The work will bedivided and officials andvolunteers will work in Group,each group will have a leaderwho will allocate the materialand equipment to be used, a

    register will be kept for materialsissued. The group leader willshow his or her group the areathat they need to work at.

    The performing group Allayenfrom Bloemfontein and theartists from UFS have alsovolunteered to join theDepartment. All volunteers willbe provided with transport to the

    area.

    Mashome

    AREAWORK TO BE DONE

    MATERIAL TO BEUSED

    GROUPLEADER

    KATLEHOHOSPITAL

    Painting of the Walls in Childrensward. Art on the Walls. Mattresses

    Paint and brushes Kefiloe andTotta

    4

  • 7/31/2019 Mandela Day Project Plan DETEA

    5/6

    (17/07/2012)and toys will be delivered later.

    Art paint and brushes Xoliswa

    KGOTHALANG CLINIC

    17/07/2012)

    Painting of the walls of TB WardPaint , brushes and polyfiller. Protective clothing

    for volunteers

    Banzie andVincent

    OR THAMBOCLINIC(17/07/12)

    Cleaning and painting of the clinicPaint and all necessaryrequirements

    Mashome

    MAMELLOHIGHSCHOOL9(18/07/12

    Vegetable Garden and Paving of theAssembly Area and handing over ofLaptops

    Garden tools, Top Soiland Seeds

    Vincent and Zia

    TIKWEPRIMARY.18/07/12

    A. Painting of four classrooms. Paint, Vanish andBrushes

    K Ntshala

    REATLEHILESECONDARYSCHOOL.18/07/12

    Painting and cleaning of the school Same as aboveMashome

    VULINDLELAPUBLIC

    SCHOOL(18/07/12

    Detea assist with provision of gamemeat and cooking plus refuse bags

    for cleaning

    Game meet and refusebags

    K Khoza

    BOITUMELOHIGHSCHOOLFICKSBURG

    DETEA will provide food forvolunteers doing work at the school

    Game meatL van Rensburg

    5

  • 7/31/2019 Mandela Day Project Plan DETEA

    6/6

    2. CONCLUSSION

    An operation centre will be set up at all sites to coordinate all activities including communications and any medialiaison that need to be done. All sites will be branded in order to make the presence of the Free State ProvincialGovernment visible in the area.

    Two hundred volunteers will be on site on both days to lend a hand in this noble activity. Most of the volunteershave been secured from Virginia with the help of the Municipality with few coming from the Department, UFS and aperforming group in Bloemfontein. DETEA will provide transport for volunteers from Bloemfontein and aroundVirginia where it is necessary.

    Allocation of the workforce will be done in such a way that all volunteers find the opportunity to do meaningful work

    and are rotated in such a way that they get to work in all areas that need to be attended to. Every effort will bemade to ensure that all material is used on site and wastage is minimized.