MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration -...
Transcript of MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration -...
© think project! thinkproject.com
MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO PRODUCTION
Sven-Eric Schapke, Director BIM/PLM
© think project! think project! // cross-enterprise collaboration Page 2
1
2
3
4
5
think project! Collaboration
Maturity of Collaboration
Document and Drawing Management
Model Managment and Coordination
Quality Management
TOPICS
© think project! think project! // cross-enterprise collaboration Page 3
THINK PROJECT!GROUP
› think project! Group
• Since 2000 in Munich, Berlin
• 300 employees
• Projects from <1 mil. to > 2 bil. Euro
• 10,000 projects, in over 50 countries
• 120,000 users worldwide
• No.1 in Germany and Europe
› Locations
• CEMAR, Gloucester, UK
• EPLASS, Würzburg, Germany
• planConnect, Dresden, Germany
• think project!
Austria / BeNeLux / France /
Germany (Munich, Berlin, Cologne) /
Iberia / Polska CEE / Switzerland (partner)
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 4
PORTFOLIOSOFTWARE / SERVICE
STRATEGICCONSULTING
PROJECTCONSULTING
BEST FITSOFTWARESOLUTIONS
PROJECT SERVICES ON DEMAND
TECHNOLOGY & DEVELOPMENT
SERVICE & SUPPORT
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5
COMMON DATA ENVIRONMENTSERVICES / MODULES / APPLICATIONS
Open API
AutoCAD
BCF API
MS Desktop
MS Excel
MS Outlook
MS Sharepoint
MS Word
Relatics
SAP
Se
rvic
es
Viewer2D / 3D
BIM Data Management
CrystalReports
SingleSign-On
OCR
Adobe PDF
BCFManagement
Co
re
DrawingManagement
RFI, RFC
PhotoSite Diary
BIMManagement
BIMReview Board
Fotodoku-mentation
…yourModule
DefectManagement
DocumentManagement
Mo
du
les
think project! Photo
think project!
think project! Quality
Ap
pli
ca
tio
ns
© think project! think project! // cross-enterprise collaboration Page 7
BIM-PROJECTSEXCERPT
› Adidas World of Sports, Herzogenaurach
› Albvorlandtunnel, Wendlingen-Ulm
› Alexanderquartier Berlin
› Aquapark Erweiterung, Oberhausen
› Axel Springer Berlin
› Eventcenters, Attendorn
› DB Station&Service AG, various
› Flare of Frankfurt, Frankfurt
› Frankfurter Volksbank, Berger Straße
› Gauchachtalrücke, Döggingen
› Gewerbezentrum, Zug
› Klebl, various
› Marina Gardens, Offenbach
› Neubau Soka, Welfenhof Wiesbaden
› Sanierung & Neubau Klinikum BS
› Siemens Office, Zug
› Springer Quartier, Berlin
› Stuttgarter Tor, Reutlingen
› Viega Eventcenters, Attendorn
› Wüstenroth Campus, Ludwigsburg
© think project! think project! // cross-enterprise collaboration Page 8
BIM LEVELS OF MATURITYUK & SWITZERLAND
Source: UK BIM Task Group 2008, Bauen Digital Schweiz & buildingSMART Schweiz
Status Quo Model-based design
Communicating systems
Model-based design
Document-basedcollaboration
Model-based design
Manual, container-basedcollaboration
Model-based design
Integrated, automated model-based collaboration
© think project! think project! // cross-enterprise collaboration Page 9
POINT OF ADOPTIONBIM FRAMEWORK.INFO
› Level of Data Integration 1
› Level of Business Adoption 2
Quellen: BIM Capability Stages & BIM Maturity Index, cf. Succar, B. and Kassem, M. (2016), Building Information Modelling: Point of Adoption, CIB World Congress, Tampere Finland, 2016 or https://bimexcellence.org
localmodels
sharedmodels
connectedelement
information
integratedelement &
contextinformation
no BIM
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 10
ADOPTION IN APPLICATION AREASHAMBURG PORT AUTHORITY
BIM Level 1modelling
design, construction
BIM level 1modelling
as-built
BIM level 2model coordination
and review
BIM level 2-3decision processes
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 12
› More participants and organisations
› More applications project phases
› Increase level of automation
• In each application area
• Integrating application areas
MATURITY OF COLLABORATIONON EACH LEVEL
PROZESSE
Linked dataand processes
Integrated systems
Workflow automation
Sharedinformation
Structured communication
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 13
Data container
Classification / coding
Versioning / audit trail
Access / rights
Archive
MATURITY OF COLLABORATIONDOCUMENTS / DRAWINGS
PROZESSE PROZESSEPROZESSE
Distribution lists
Tasks / responsibilities
Status / approvals
Rule-based distribution
Schedule controlling
Conditional approvals
Drawing packages
Repro jobs
Review mark-ups and tickets
Follow-up processes (changes, billings, etc.)
Dashboard / Reports
Metadata / QR printing
Mobile Version Check
2D Viewing
Sharedinformation
Linked dataand processes
Structured communication
Integrated systems
Workflow automation
© think project! think project! // cross-enterprise collaboration Page 14
Coded drawings
DOCUMENT / DRAWING MANAGEMENT DB STATION&SERVICE
Classified documents
© think project! think project! // cross-enterprise collaboration Page 15
DRAWING / DESIGN MANAGEMENT SAAONE
Planning and Controlling
Primavera P6
Relatics via think project! connector
Design progress monitoring
Review and Approval
Synchronised models with mark-ups
Digital signature printing
QR Codes and Mobile Version Check
Workflows
Drawing approval workflow
with 5 level and up to 26 reviewers
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 16
Workflow automation
Data container
Classification / coding
Versioning / audit trail
Access / rights
Archive
MATURITY OF COLLABORATIONMODEL MANAGEMENT / COORDINATION
PROZESSE PROZESSEPROZESSE
Distribution lists
Tasks / responsibilities
Status / approvals
Rule-based distribution
Schedule controlling
Conditional approvals
Coordination models
Review mark-ups and tickets
Linked drawings / documents
3D Viewing
Model checking
BCF integration
BCF reports
Sharedinformation
Linked dataand processes
Structured communication
Integrated systems
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 17
BIM INFORMATIONBIM LEVEL 2 COLLABORATION
Source: based on VDI 2552 Part 5
RFI
© think project! think project! // cross-enterprise collaboration Page 18
BIM COORDINATION AND REVIEWIN COORDINATION MODELS
Revision +1
Revision +1
Revision +1
Revision +1
Revision +1
© think project! think project! // cross-enterprise collaboration Page 19
BIM COORDINATION AND REVIEWLINKED MODELS AND 3D MARKER
Modelldaten IB&T
© think project! think project! // cross-enterprise collaboration Page 20
BIM COORDINATION AND REVIEWLINKED MODELS AND 3D MARKER
Modelldaten IB&T
© think project! think project! // cross-enterprise collaboration Page 22
BIM COORDINATION AND REVIEWREVIEWS / TASKS
Modelldaten IB&T
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 23
MODEL COORDINATION AND APPROVAL PROCESSHAMBURG PORT AUTHORITY
Source: Design for model coordination and approcal process at Hamburg Port Authority
design and revise
De
sig
n A
design and revise
De
sig
n B
request, coordinate, approve
Co
ord
ina
tio
n
shared informationcommunication
thin
k p
roje
ct!
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 24
MODEL COORDINATION AND APPROVAL PROCESSHAMBURG PORT AUTHORITY
Source: Design for model coordination and approcal process at Hamburg Port Authority
Re
qu
ire
me
nts
Ap
pro
va
l
Model check w/o BCF Model coordination w/o BCF
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 25
Versioning / audit trail
Access / rights
Archive
MATURITY OF COLLABORATIONQUALITY MANAGEMENT
PROZESSE PROZESSEPROZESSE
Conformant issue forms
Access / editing rights
Responsibilities / deadlines
Status / comments / approvals
Rule-based assignment
Conditional approvals
Issue monitoring
Paper forms
Referenced 3D marker
Referenced design documentation(drawing, contract, model)
Mobile Photo app
Mobile Quality app
QR code print/scan
Sharedinformation
Linked dataand processes
Structured communication
Integrated systems
Workflow automation
© think project! think project! // cross-enterprise collaboration Page 26
DEFECT AND WARRANTY MANAGEMENT SIEDLUNGSWERK
Project manager
Reporting, controlling
Construction manager
Coordination
Contractor
Resolution, reporting
Max MustermannBeispielweg 100
12345 Musterstadt
20082 – PROJEKTNAME
Bob der Baumeister089 / 12 34 56 089 / 87 65 43 [email protected]
01.01.215
© think project! think project! // cross-enterprise collaboration Page 27
QUALITY MANAGEMENTMARKGRAF
Wohngebäude Haydnstraße, München Bürogebäude Imtech-Haus, Planegg
Forms / Workflows
› Request for information
› Request for change
› Constructability concerns
› Hold-up notifications
› Progress reporting
› Photo documentation
› Conformity Management
› Rebar inspection
› Fire protection records
› Defect management
› Warranty Management
› … many more
© think project! think project! // cross-enterprise collaboration Page 28
QUALITY MANAGEMENTMARKGRAF
Forms / Workflows
› Request for information
› Request for change
› Constructability concerns
› Hold-up notifications
› Progress reporting
› Photo documentation
› Conformity Management
› Rebar inspection
› Fire protection records
› Defect management
› Warranty Management
› … many more
© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 29
› Build up collaboration expertise
• Document and drawing management
• Model management and coordination
• Quality managment
› Approach BIM Level 3
• Model information
• querying and extraction
• Element linking
• drawing, reports,
• specifications,
• photos, processses
MATURITY OF COLLABORATIONNEXT LEVEL
© think project! thinkproject.com