Page 1: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

Making the Most of a Retrofit:

Lake Cook, Alexandria, Virginia

Chesapeake Water Environment Association

May 18, 2017

Page 2: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

WHAT’S AHEAD…

– INTRODUCTIONS

– PROJECT DRIVERS

– PROJECT BACKGROUND

– PROJECT GOALS AND OBJECTIVES

– STORMWATER LOCAL ASSISTANCE FUND (SLAF)

– PROJECT DEVELOPMENT

– ANTICIPATED WATER QUALITY IMPROVEMENTS

– PROJECT CHALLENGES

Making the Most of a Retrofit May 18, 2017 Page 2

Page 3: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT DRIVERS

Pollutant Load Pollutant Total (lbs./yr.) Approximate Equivalent Acres

TreatedTN TP TSS

2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 -

Total Pollutant Reductions Required (Phases I-III) 7,597 1,004 861,937 ~ 2,220-2,400

Phase I* (2013-2018) 5% 395 39 43,242 ~ 120-300

Phase II (2018-2023) 35% 2,675 354 302,749 ~ 660

Phase III (2023-2028) 60% 4,585 607 518,999 ~ 1,440

How to Meet These Goals?

• Compliance Analyses and Options Study (2012)

• Recommended retrofit of existing ponds as the first step in meeting goals

Making the Most of a Retrofit May 18, 2017 Page 3

City of Alexandria’s MS4 Permit Obligations

Page 4: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT BACKGROUND: LOCATION

Cameron Run Watershed

City of Alexandria Boundary

Project Location

Making the Most of a Retrofit May 18, 2017 Page 4

Page 5: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT BACKGROUND: LOCATION

Making the Most of a Retrofit May 18, 2017 Page 5

Page 6: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT BACKGROUND: HISTORY

Making the Most of a Retrofit May 18, 2017 Page 6

Page 7: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT BACKGROUND: EXISTING CONDITIONS

Making the Most of a Retrofit May 18, 2017 Page 7

Page 8: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT GOALS AND OBJECTIVES

Making the Most of a Retrofit May 18, 2017 Page 8

• Total Drainage Area: 390.31 ac• Forest/ Open Space: 41.25 ac

• Managed Turf: 221.51 ac• Impervious Cover: 127.54 ac

Page 9: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT GOALS AND OBJECTIVES

Project Goals• Help City Meet Regulatory Requirements (MS4 and

Chesapeake Bay TMDL)• Control Algae Growth• Control Excessive Sedimentation• Bacteria Reductions

• Increase Pedestrian Circulation• Increase Views from Eisenhower• Increase Public Amenities / Education• Engage Stakeholders

Making the Most of a Retrofit May 18, 2017 Page 9

Page 10: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

STORMWATER LOCAL ASSISTANCE FUND (SLAF)

• VDEQ grant program to help municipalities fund stormwater projects

(50/50 cost match grant)

• In December 2013, City applied for and was awarded a $1.2M grant

for Lake Cook retrofit

• Cost effectiveness is a major consideration in awards. Only

applications with costs below $50,000 per pound of Total

Phosphorous were authorized for funding.

Making the Most of a Retrofit May 18, 2017 Page 10

Page 11: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT DEVELOPMENT (FINAL DESIGN)

Making the Most of a Retrofit May 18, 2017 Page 11

• Single Cell Wet Pond - Level 1• Upflow Filter• Open Space• Landscaping & Native Plants• Preserved Specimen Trees• Redeveloped Fishing Pier• Boardwalk• Bird Watching• Pedestrian Pathways • Educational Signage• Public Art• Redesigned Overlook Area

Page 12: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT DEVELOPMENT (FINAL DESIGN)

Making the Most of a Retrofit May 18, 2017 Page 12

Page 13: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT DEVELOPMENT (FINAL DESIGN)

Making the Most of a Retrofit May 18, 2017 Page 13

Page 14: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT DEVELOPMENT (FINAL DESIGN)

Making the Most of a Retrofit May 18, 2017 Page 14

Page 15: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT DEVELOPMENT (FINAL DESIGN)

Making the Most of a Retrofit May 18, 2017 Page 15

Page 16: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PUBLIC ART

• Artist David Hess

• Interactive artwork

• Will capture and carry sound created by

the surrounding environment

Making the Most of a Retrofit May 18, 2017 Page 16

Page 17: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

ANTICIPATED WATER QUALITY IMPROVEMENTS

Expected Pollutant Load Reductions

PollutantsAnnual Pollutant Removal

Rates After Retrofitting (lbs./yr.)

Nitrogen 1,610

Phosphorous 167

Total Suspended Solids

134,140

Making the Most of a Retrofit May 18, 2017 Page 17

Estimated Cost Per Pound of Phosphorous= $24,000/lb.

Page 18: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

PROJECT CHALLENGES

Challenge Approach

Evolving DEQ Regulations for Retrofits Preparation of a Water Quality Technical Memo at Preliminary Design and early coordination with DEQ

Public Input Held public and stakeholder meetings at various intervals of project and incorporated elements of concern into final design

Disposal of Dredge Material (limited on-site space)

Considered various sites within City for storage and alternative uses of dredged material

Construction Phasing Work must be done in the dry, employed proprietary diversion measure for 357 acre drainage through Strawberry Run

Long Term Maintenance Engaged various stakeholders (NOVA Parks Authority and City Dept. of Recreation, Parks and Cultural Activities) at early phases of project to design features such that maintenance of proposed elements was considered in material selection, access, life cycle costs, etc.

Wildlife Protection / Relocation Preparation of a Wildlife Management Plan and coordination with VDGIF to relocate existing fish, suspend restocking and to relocated beavers, turtles, etc.

Making the Most of a Retrofit May 18, 2017 Page 18

Page 19: Making the Most of a Retrofit: Lake Cook, Alexandria, Virginia · TN TP TSS 2009 Pollutant Loads (Baseline) 97,810 7,712 4,704,400 - Total Pollutant Reductions Required (Phases I-III)

Questions?

Contact Info:Umar Shahid, (301) 820-3240, [email protected]

Sara DeGroot, (703) 746-4127, [email protected]