CBOD TSS - p1cdn4static.civiclive.com

32
ENVIRONMENTAL COMPLIANCE & SAFETY DEPARTMENT STATUS REPORT FEBRUARY, 2021 BOD TSS Faulkner Lake 7.3 mg/L (30 Max.) 3.5 mg/L (30 Max.) Maumelle 27.0 mg/L (30Max.) 20.9 mg/L (30 Max.) CBOD TSS Five Mile 10.7 mg/L (25 Max.) 6.4 mg/L (90 Max.) White Oak 16.0 mg/L (25 Max.) 15.8 mg/L (90 max.) Jaime Marrow Office Assistant II

Transcript of CBOD TSS - p1cdn4static.civiclive.com

Page 1: CBOD TSS - p1cdn4static.civiclive.com

ENVIRONMENTAL COMPLIANCE & SAFETY DEPARTMENT STATUS REPORT

FEBRUARY, 2021

BOD TSS Faulkner Lake 7.3 mg/L (30 Max.) 3.5 mg/L (30 Max.) Maumelle 27.0 mg/L (30Max.) 20.9 mg/L (30 Max.) CBOD TSS

Five Mile 10.7 mg/L (25 Max.) 6.4 mg/L (90 Max.) White Oak 16.0 mg/L (25 Max.) 15.8 mg/L (90 max.) Jaime Marrow Office Assistant II

Page 2: CBOD TSS - p1cdn4static.civiclive.com

NORTH LITTLE ROCK WASTEWATER UTILITY

7400 BAUCUM PIKE PHONE (501) 945-7186 P.O. BOX 17898 FAX (501) 945-3716 NORTH LITTLE ROCK, AR 72117-0898

Memorandum

TO: Michael Clayton

FROM: Scott Kerby

DATE: 3/4/2021

RE: Engineering Department Major Projects Status

South Levy Indian Hills Pipe Bursting 2017 Rehabilitation Project: The Contractor has completed all of the line segments on the project for a total of 45,053 linear feet rehabilitated. Punch-list items and other restoration issues are still outstanding.

South Levy Indian Hills CIPP 2017 Rehabilitation Project: The Contractor has completed approximately 97% of the project and the last set of line segments are large diameter pipes in Maumelle. Approximately 51,526 linear feet of pipe has been replaced with Cured In-Place Pipe.

Lakewood Pipe Bursting 2019 Rehabilitation Project: The project is substantially complete. The Contractor has completed approximately 24,877 linear feet of pipe bursting.

Lakewood CIPP 2019 Rehabilitation Project: The project is substantially complete. The Contractor has completed approximately 21,401 linear feet of Cured In-place Pipe replacement.

Dark Hollow Interceptor 2019 CIPP Rehabilitation: The project bid opening is on March 25, 2021. Goshen Avenue Sanitary Sewer Relocation Project: Easements have been secured. The project bid opening is on March 25, 2021. Upper Riverside Interceptor MSI, Phase II: Plans and specifications are being prepared to bid the project to perform multi-sensor inspection of approximately 5,485 LF of 30” reinforced concrete pipe to assess the condition of the interceptor.

Page 3: CBOD TSS - p1cdn4static.civiclive.com

NORTH LITTLE ROCK WASTEWATER UTILITY

Memorandum

TO: Michael Clayton

FROM: Lyle Leubner

DATE: 03/03/21

RE: Treatment Status Report

White Oak Influent Generator Project NLR staff and local diesel mechanic are working through logistics of transferring fuel from auxiliary tank to the onboard tank. Mechanic set system up to shut off based on pressure. NLR staff determined it would be best to shut off system based on level, in the event the system develops a leak. Liftstation Projects Seminole East – Awaiting repair of spare pump. New Bedford – New pump #2 has been installed. SCADA technician is still working through a major liftstation control program update. Once it is debugged, it will be downloaded at all liftstations. Faulkner Lake Belt Press Conveyor manufacturer is scheduled to complete drawing revisions for conveyor #2 on 3/13/21. After NLRWU staff review the drawings, it should go to manufacturing. A roller failed on belt press #1 and has been removed and sent to a local machine shop for repair. Maumelle Plant Effluent VFD#1 has been installed. Faulkner Lake Plant Chlorine induction pump #2 has failed. It currently sits at a local shop for repair. Freeze Damages Five Mile main rpz was damaged and began venting water. Parts have been ordered for repair. Shorter College Lift Station and Burns Park East Lift Station had busted and leaking rpzs. Units have been replaced, tested, and put in service. Maumelle plant had a water line freeze and bust in the training building. This was repaired by in house staff. Faulkner Lake has a water line at the influent pump station and in the ground behind the lawn maintenance building. Influent pump station repair is complete and staff is currently looking into the leak in the ground.

7400 BAUCUM PIKE PHONE (501) 945-7186 P.O. BOX 17898 FAX (501) 945-3716 NORTH LITTLE ROCK, AR 72117-0898

Page 4: CBOD TSS - p1cdn4static.civiclive.com

NORTH LITTLE ROCK WASTEWATER UTILITY

7400 BAUCUM PIKE PHONE (501) 945-7186 P.O. BOX 17898 FAX (501) 945-2367 NORTH LITTLE ROCK, AR 72117-0898

Memorandum

TO: Michael Clayton

FROM: Marybeth Eggleston

DATE: 03/02/2021

RE: Environmental Compliance & Safety Status Report

First quarter water, sludge, and biomonitoring sampling for all four treatment plants has been completed. The February safety meeting on “First Aid” was conducted via online activity. The video was posted, and an email was sent to all staff with instructions on how to access and the timeline within which to watch and send back the signed acknowledgement.

Page 5: CBOD TSS - p1cdn4static.civiclive.com

Jan

Fe

bM

ar

Ap

rM

ay

Ju

nJ

ul

Au

gS

ep

Oc

tN

ov

De

cY

TD

Ser

vic

e R

equ

ests

To

tal

Req

ues

ts10

499

203

Tro

ub

le C

rew

Cal

ls60

6212

2

Pri

vat

e L

ine

Issu

e28

3664

NL

RW

Mai

n o

r M

anh

ole

Iss

ue

1214

26

NL

RW

Forc

e M

ain

Iss

ue

00

0

Oth

er21

1637

Co

nst

ruct

ion

Poin

t R

epai

r45

1762

Op

en C

ut

(LF

)0

6060

Man

hole

- R

epai

r4

812

Man

hole

- R

ehab

910

19

Man

hole

- N

ew I

nst

alla

tion

04

4

Tap

- N

ew I

nst

alla

tio

n0

1010

Tap

- D

isco

nn

ect

01

1

Ma

inte

na

nce

Pip

elin

e C

lean

ing (

LF

)10

6,93

9

66

,052

172,

991

Pip

elin

e C

CT

V (

LF

)49

,846

24,2

41

74

,087

Ser

vic

e L

ines

Ass

ista

nce

Pro

gra

m0

00

Insp

ecti

on

s -

New

3028

58

Insp

ecti

on

s -

Rep

lace

men

t12

618

NL

RW

Co

llec

tio

ns

Sy

stem

Dep

art

men

t

20

21

Yea

r-T

o-D

ate

Wo

rk R

eca

p R

epo

rt

Page 6: CBOD TSS - p1cdn4static.civiclive.com

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2018

518

24

26

27

33

35

38

44

52

53

59

2019

714

19

24

29

29

30

32

33

38

43

46

2020

25

69

14

17

17

19

20

22

23

25

2021

14

1

4

0

10

20

30

40

50

60

70

SSOC

um

ula

tive

SSO

YTD

vs

Last

3 Y

ear

s

Page 7: CBOD TSS - p1cdn4static.civiclive.com

AGENDA FOR

NORTH LITTLE ROCK WASTEWATER TREATMENT COMMITTEE MEETING

RE: Committee Meeting

PLACE: Faulkner Lake Treatment Plant Collection Systems Training Room

7400 Baucum Pike, North Little Rock, Arkansas 72117

DATE: March 9, 2021

TIME: 12:15 PM

(1) ROLL CALL OF THE COMMITTEE MEMBERS

(2) APPROVAL OF THE MINUTES OF THE FEBRUARY 9, 2021 MEETING

(3) CASH DISBURSEMENTS FOR FEBRUARY 2021

(4) FINANCIAL REPORT FOR FEBRUARY 2021

(5) ANNUAL GRAVEL AND STONE BID

Page 8: CBOD TSS - p1cdn4static.civiclive.com

#1

(1)

ROLL CALL of the COMMITTEE MEMBERS

Page 9: CBOD TSS - p1cdn4static.civiclive.com

(2)

NEW BUSINESS

ACTION REQUESTED:

Approval of the Minutes of the February 9, 2021 Committee Meeting

Page 10: CBOD TSS - p1cdn4static.civiclive.com

NORTH LITTLE ROCKWASTEWATER TREATMENT COMMITTEE

MlNurns oF A MEETTNG HELD Tunsrav, FnnnuARy g, 2021

A meeting of the North Little Rock Wastewater Treatment Committee washeld on Tuesday, February 9, 202L at the administrative offices located at theFaulkner Lake Treatment Plant.

The meeting was called to order by Chairman Matthews at approximately12:15 p.m. The roll was called and a quorum was present. Those in attendance atthe meeting were Mr. K.W. Matthews, Mr. Ed Nelson, Ms. Karen Bryant and Mr.Gabe Stephens. AIso in attendance were Mr. Michael Clayton, Director, Ms. GinaBriley, Mr. BilI Halter and Ms. Carrie Kyhl with Scenic Hill Solar, LLC, Mr. SamHilburn and Mr. Scott Hilburn with Hilburn & Harper, Ltd. and Dawn Harmon.

Chairman Matthews then asked the representatives with Scenic Hill Solar,LLC to give an update on the solar project. Before Mr. Halter's update, DirectorClayton presented a drone video taken by a Utility employee of the solar site. Mr.Halter then advised that most of the panels have been installed and once theswitch gears were in place, the transformer would be installed by Entergy in 3 to 4weeks. With that being said, by the middle of March the system should be "placedin service" and conducting electricity. After a few more steps, the system will be atfinal completion.

The Committee reviewed the minutes of its January 12, 2O2I meeting. Therebeing no questions or comments, a motion was made by Mr. Nelson, seconded byMr. Stephens, to approve the minutes of its January L2, 202L meeting. The motioncarried unanimously.

Next, the Committee reviewed the cash disbursements for the month ofJanuary 202L. A motion was made by Mr. Stephens, seconded by Ms. Bryant, toapprove the cash disbursements for January 202I reflecting total cashdisbursements of $2,04L,455.66 and fund transfers between accounts of$1,882,400.00. The motion carried unanimously.

Director Clayton then updated the Committee on the email breach at theUtility. Director Clayton informed the Committee that the following actions havebeen taken:

new checks and balances for transfer of funds have been put in place;

Page 11: CBOD TSS - p1cdn4static.civiclive.com

EGP, PLLC has been contacted to suggest further protocols;security has been beefed up by implementing a 2-fold method ofauthentication on the IT side; andthe incident has been reported to the proper authorities.

The Committee will be advised of any additional security changes.

Upon motion made by Mr. Nelson, seconded by Ms. Bryant, the Committeeunanimously approved the Financial Statement for January 202I.

Mr. Clayton then advised the Committee that the Utility received invoicesfrom the Arkansas Municipal League for the property and vehicle insurance for2.0L202I to I.3I.2022 in the amount of $107,089.25. The amount which wasbudgeted is $110,800.00. The table below shows the property insurance premiumsfor the last two years:

2OL9 APERMA$ 117,999

2O2O AML $ 107,584

2O2I AML $107,089

It was noted that the last assessment paid to APERMA was in October 2020.After further discussion, a motion was made by Ms. Bryant, seconded by Mr.Nelson, to authorize payment to the Arkansas Municipal League in the amount of$107,089.25. The motion carried unanimously.

The Committee then reviewed the annual dues payment received formembership to the Pulaski Area Geographic Information System (PActs). Theamount is $39,705.00 and has been the same for the past ten (10) years. This itemis included in the 2021budget for $40,900.00. A motion was made by Mr. Stephens,seconded by Ms. Bryant, to authorize annual dues payment to PActs in the amountof $39,705.00. The motion carried unanimously.

A motion was made by Nelson, seconded by Ms. Bryant, to excuse theabsence of Mr. Smith from the meeting. The motion carried unanimously.

Mr. Nelson then asked about the Maumelle Plant being out of compliancewhich was reflected on the Environmental Compliance & Safety Department StatusReport. Director Clayton stated the plant was Non Compliant for a very shortperiod of time but everything was back in order.

Page 12: CBOD TSS - p1cdn4static.civiclive.com

There being no further action to come before the Committee, a motion was

made by Mr. Nelson to adjourn the meeting. The motion carried unanimously, and

the meeting was adjourned at approximately 12:56 p'm.

APPROVED AS TO FORM: RESPE CTFULLY SUBMITTED,

K. W. MATTHEWS, CHAIRMAN SYLVESTER SMITH,VICE - CHAIRMAN/SE CRETARY

Page 13: CBOD TSS - p1cdn4static.civiclive.com

(3)

CASH DISBURSEMENTS FOR FEBRUARY 2021

ACTION REQUESTED:

Approval of the Cash Disbursements for February 2021 showing total

Cash Disbursements of $2,347,362.86 and

Fund Transfers between accounts of $1,969,100.00.

Page 14: CBOD TSS - p1cdn4static.civiclive.com

CK

CH

EC

K

#P

AY

AB

LE

TO

A

MO

UN

TD

ES

CR

IPT

ION

51

59

0O

CS

E C

leari

ngho

use S

DU

56

9.5

0$

Child

Suppo

rt O

blig

ation -

3 E

mplo

yees

51

59

1M

id-S

outh

Adju

stm

ent C

o.

$

12

.78

C

ase N

o. C

V-2

020

-0296

4 P

aym

ent #

3 M

cP

hers

on

51

59

2N

LR

Com

munity C

ente

r $

4.9

3

Em

plo

yee P

aid

Fitness M

em

bers

hip

Pay P

erio

d E

ndin

g 1

.31.2

021

51

59

3H

eart

of

Ark

ansas U

nited W

ay

$

53

.00

E

mplo

yee C

ha

rita

ble

Contr

ibutions P

ay P

erio

d E

ndin

g 1

.31.2

021

AF

-03

Ark

ansas F

edera

l C

redit U

nio

n $

4,0

36

.31

Em

plo

yee D

ep

osits -

Pay P

erio

d E

ndin

g 1

/31/2

021

NA

T-0

3N

ationw

ide R

etire

ment S

olu

tions

$

2

,71

8.0

0

Retire

ment C

ontr

ibutions -

Pay P

erio

d E

ndin

g 1

/31/2

021

PR

-03

Payro

ll T

ax D

eposit

$

60

,22

3.8

4 P

ayro

ll T

axes -

Pay P

erio

d E

ndin

g 1

/31/2

021

51

59

4S

teve L

anders

Colli

sio

n C

en

ter

$

11

,22

5.7

2

Colli

sio

n R

ep

air

Unit 1

46

/Ins C

laim

#21

-0002

2-0

01

51

59

5A

ce P

ipe C

leanin

g, In

c.

$

35

,92

4.2

5

Work

Perf

orm

ed 1

1/2

020 -

12/2

020 D

ark

Hollo

w P

hase 2

(C

om

mitte

e A

ppro

ved

10

/20

20

)

51

59

6A

dvanced F

luid

Technolo

gie

s $

5,7

43

.28

7

.5 h

p F

ran

klin

Pu

mp

/Ne

w B

ed

ford

PS

51

59

7A

merican C

om

posting, In

c.

$

5

06

.24

S

and/D

irt/S

ludge

Haulin

g

51

59

8A

rkansas D

em

ocra

t G

azette

$

3

51

.68

Lega

l A

d -

Dark

Hollo

w Inte

rcepto

r

51

59

9A

T&

T $

1,2

70

.34

M

onth

ly P

hone

Serv

ice F

LT

P 1

/11

/202

1 -

2/1

0/2

021

51

60

0V

OID

$

-

P

rinte

r E

rror

51

60

1A

T&

T M

obili

ty $

2,2

30

.60

Janua

ry M

obile

Serv

ice S

CA

DA

51

60

2B

attery

Outf

itte

rs $

23

6.1

2

Batteri

es f

or

Units 8

5 &

115

51

60

3B

lue T

arp

Cre

dit S

erv

ices

$

2

46

.81

G

rom

mets

, S

hop L

ight, C

able

Tie

s, F

ace S

hie

lds

51

60

4C

am

pbell

Sheet

Meta

l, Inc.

$

3

17

.55

A

lum

inum

Bra

ckets

& p

art

s

51

60

5C

ente

rpoin

t E

nerg

y $

14

5.7

7

Gas B

ills: M

aum

elle

Valle

y P

S, N

orf

olk

PS

, O

sage H

ills G

en, C

C B

F G

en,

Sem

inole

E G

en, N

ew

Bedfo

rd G

en, S

em

inole

W G

en

51

60

6C

entr

al A

rkansas T

ruck &

Tra

iler

$

1

50

.56

R

epair

on U

nit 1

23

- T

raced a

nd f

ixed L

oose C

onn

ection

51

60

7C

inta

s $

2,2

28

.84

B

i-w

eekly

Mat S

erv

ice, U

ltra

Cle

an S

anitiz

e C

S&

E, U

niform

s

51

60

8C

inta

s $

55

2.2

9

First A

id C

abin

et R

efills

- C

olle

ctions, Lab

, P

um

p M

ain

t, O

ps

51

60

9C

ore

& M

ain

, LP

$

4

,35

0.0

5

Sew

er

Wye, C

Plg

s, S

oil

Pip

e, M

anho

le L

ids, R

ings

51

61

0C

um

min

s M

id-S

outh

LL

C $

10

3.9

8

Hoses -

Sili

cone R

ubbe

r (G

enera

tors

)

51

61

1D

igital P

rint &

Im

agin

g o

f LR

$

47

.69

B

usin

ess C

ard

s 5

00

- N

ew

Engin

eer

Kru

pp

51

61

2E

lliott E

lectr

ic S

upply

, In

c.

$

6

48

.49

T

FF

N S

TR

, P

VC

Condu

it, P

VC

Elb

ow

s, R

igid

Ele

ctr

o S

trap, 1

-Hole

Rig

id S

trap

51

61

3E

nte

rgy

$

26

,50

5.0

8

Ele

ctr

ic B

ills: M

urp

hy D

r, M

TP

Tra

inin

g, H

igh S

chool, M

TP

Main

, M

TP

#2,#

3,

MT

P E

q, S

urg

e, M

TP

#4,

Rid

gela

nd,

Rid

gela

nd/O

dom

, D

iam

ond P

t, D

ura

ngo,

Law

rence, M

aste

rs P

l, T

ow

n C

tr, P

alis

ades, N

orf

olk

, R

iver

Run, M

aum

elle

#2

,

Bouri

es, M

ara

nes, C

C B

F, C

ts M

assie

#2

, C

ts M

assie

, C

olli

ns Ind

51

61

4F

irst E

lectr

ic C

oope

rative

$

1

74

.14

E

lectr

ic B

ill -

Gap C

reek

51

61

5F

leet T

ire S

erv

ice

$

3

39

.90

T

raile

r #9 2

Tires

51

61

6F

ulle

r &

Son M

aum

elle

$

1

35

.74

G

ear

Wre

nch, F

ull

Meta

l C

oate

d S

cis

sor,

Key S

trap, C

rescent 1

28 P

c M

ech S

et

51

61

7G

ibbs S

erv

ice C

o., I

nc.

$

6

,22

5.5

9

Sem

i A

nnua

l B

ill L

ab

HV

AC

Main

ten

ance A

gre

em

ent 2

/1/2

021 -

7/3

1/2

021

NO

RT

H L

ITT

LE

RO

CK

WA

ST

EW

AT

ER

CA

SH

DIS

BU

RS

EM

EN

TS

Fe

bru

ary

28,

202

1

Page 1

Page 15: CBOD TSS - p1cdn4static.civiclive.com

CK

CH

EC

K

#P

AY

AB

LE

TO

A

MO

UN

TD

ES

CR

IPT

ION

NO

RT

H L

ITT

LE

RO

CK

WA

ST

EW

AT

ER

CA

SH

DIS

BU

RS

EM

EN

TS

Fe

bru

ary

28,

202

1

51

61

8G

oodsell

Tru

ck A

ccessorie

s $

38

7.7

7

Tool B

ox Insta

lled -

Unit 1

17

51

61

9G

ranite M

ounta

in Q

uarr

ies

$

8

59

.89

C

lass 7

& B

alla

st (G

ravel &

Sto

ne

)

51

62

0H

aynes P

um

p &

Pro

cess

$

2

09

.86

C

hlo

rin

e Inje

cto

r P

art

s -

FLT

P, W

OT

P, 5-M

i T

P

51

62

1H

um

's H

ard

ware

$

1

,82

5.0

4

Bypass L

op

per,

Rakes, T

renchin

g S

hovel, D

rill

Bit, N

uts

, B

undlin

g W

rap,

Bushin

g, C

arh

art

Jacket, W

all

Heate

r, S

ignag

e, G

as H

eate

r &

Conne

ctions, P

ool

Tro

wels

, O

range

Safe

ty F

ence, T

yro

lit, H

ole

Saw

, H

ole

Saw

Arb

or,

Fuses, B

room

,

Padlo

ck, K

ey, B

ale

s o

f S

traw

, W

edge

Anchors

, A

ir lin

e N

ipple

s, B

it C

ore

s, S

pra

y

Pain

t, T

hre

ad S

eala

nt, L

ockin

g P

ins, P

ain

t R

olle

rs, B

rushes, T

ray, H

alo

gen

Bulb

,

Bell

Reducer

51

62

2H

um

's R

enta

l $

4,0

01

.05

C

hip

pin

g H

am

mer/

Excavato

r/W

ard

2; E

xcavato

r/W

ard

1; T

rencher/

Ops; C

ut O

ff

Saw

/FL W

ashw

ate

r P

um

ps; C

ore

Drill

Exte

nsio

n/B

ack G

ate

s F

L

51

62

3In

situfo

rm T

echnolo

gie

s, LLC

$

47

,94

6.5

1

Lakew

ood

CIP

P-E

stim

ate

7 &

8

51

62

4Jim

my D

on W

addle

s H

aulin

g, In

c.

$

3

,68

0.0

0

Bio

solid

s H

aulin

g f

rom

MT

P to T

wo P

ines L

an

dfill

16 L

oads 1

/26

- 1

/29

/202

1

51

62

5L&

L M

unic

ipal S

upplie

s &

Tools

$

4

43

.48

T

hro

waw

ay G

loves, H

ip B

oots

51

62

6Lib

ert

y T

raile

r C

o., Inc.

$

1

38

.84

S

traps w

/Wire H

ooks, Lig

ht &

Wire K

it &

Jack B

olt o

n S

wiv

el

51

62

7Logo

wear

Em

bro

idery

$

91

.71

T

-Shir

ts f

or

new

em

plo

yee

51

62

8Lou's

Glo

ves

$

1

,69

0.0

0

Pow

der

free n

itri

le g

loves v

ario

us s

izes -

Lab

Sto

ck

51

62

9Low

e's

$

41

.58

3-P

iece F

iskars

, P

ost H

ole

Dig

ger

- 5-M

ile

51

63

0P

ete

rson C

on

cre

te S

eptic T

ank

$

6

29

.42

R

iser,

Cone, N

LR

Rin

g &

Cover/

Ward

1

51

63

1P

ettus O

ffic

e P

roducts

$

1

86

.53

C

opy P

aper,

Batteri

es, C

off

ee, C

ream

er,

Tab D

ivid

ers

, D

aily

Busin

ess D

iary

51

63

2P

ost O

ak A

cre

s, In

c.

$

35

.00

D

irt W

ard

1

51

63

3R

azorb

ack C

oncre

te C

om

pany

$

4

70

.00

F

low

able

Fill

- W

ard

0

51

63

4R

iver

Valle

y T

racto

r $

1,9

67

.89

F

uel C

ap/B

ackhoe;

Serv

ice &

Repair

KX

080 T

rackhoe

51

63

5S

cott A

uto

motive C

ente

r $

13

2.4

1

Unit 1

17

- R

epla

ce F

uel P

um

p R

ela

y M

odule

51

63

6S

herw

in-W

illia

ms

$

3

46

.24

Pain

t, R

olle

rs, R

olle

r F

ram

e -

Tre

atm

ent D

ept. D

oo

rs &

Hand R

ails

51

63

7S

pa C

he

mic

als

, In

c.

$

2

98

.90

Dis

infe

cta

nt/

Deodo

rant, P

op U

p T

ow

els

51

63

8S

tanle

y H

ard

ware

$

18

.59

B

olts &

Isola

tors

/Ward

2 (

for

cut off

saw

)

51

63

9S

un H

og

Sola

r, L

LC

$

2

72

,76

5.8

6

5-M

ile S

ola

r P

roje

ct -

App

lication #

6

51

64

0S

uperi

or

Concre

te,

Inc.

$

2

,60

0.0

0

Str

eet a

nd C

urb

Repair

s -

Ward

2

51

64

1U

BS

$

7

29

.79

W

ate

r B

ills: S

hill

cutt, 5

-Mi, O

akbro

ok, S

hort

er

Coll,

Delta L

aw

n, W

hite O

ak

51

64

2W

ade C

om

pany, In

c.

$

2

,28

4.1

7

Sem

i A

nnua

l B

ill L

ab

HV

AC

Main

ten

ance A

gre

em

ent 2

/1/2

021 -

7/3

1/2

021

51

64

3W

aste

Manag

em

ent

$

13

,85

7.2

2

Bio

solid

s D

isposal fr

om

MT

P to T

wo P

ines L

an

dfill

1/1

5 -

1/2

9/2

021

51

64

4W

hole

sale

Ele

ctr

ic S

upply

$

3

50

.74

3 A

rea L

ights

for

FLT

P

51

64

5Low

e's

$

41

.91

Concre

te S

eala

nt, R

ough

Scru

b B

rush, T

herm

om

ete

rs -

5-M

ile T

P

51

64

6D

igi-

Key E

lectr

onic

s 3

05

8463

$

8

18

.14

H

eat S

hrin

k a

nd

Surg

e S

uppre

ssors

- L

ift S

tation F

loat P

roje

ct &

PLC

51

64

7E

nvironm

enta

l E

xpre

ss, In

c.

$

1

,32

2.5

8

Bottle

s a

nd

Caps f

or

Sam

plin

g -

All

Pla

nts

& Indu

str

ies

51

64

8A

-1 R

ecovery

$

1

02

.13

U

nit 1

17

- T

ow

ed to S

cott A

uto

motive

Page 2

Page 16: CBOD TSS - p1cdn4static.civiclive.com

CK

CH

EC

K

#P

AY

AB

LE

TO

A

MO

UN

TD

ES

CR

IPT

ION

NO

RT

H L

ITT

LE

RO

CK

WA

ST

EW

AT

ER

CA

SH

DIS

BU

RS

EM

EN

TS

Fe

bru

ary

28,

202

1

51

64

9A

dvanta

ge S

erv

ice C

om

pany

$

1

44

.74

S

erv

ice C

all

- A

dm

in B

ldg. H

VA

C

51

65

0A

llegra

Print &

Im

agin

g $

62

1.4

9

Gre

ase C

an L

ids/E

ducation

51

65

1A

rkansas F

ilter,

Inc.

$

2

32

.58

F

oam

Filt

ers

- F

L Infl V

FD

51

65

2A

rkansas M

unic

ipal Lea

gue

$

1

07

,08

9.2

5

Vehic

le/E

quip

ment In

s 2

/1/2

1 -

1/3

1/2

2

51

65

3A

rkansas S

od &

Turf

Farm

, In

c.

$

4

73

.61

S

od a

nd G

rass R

epair

s -

Ward

s 4

, 2

, 1

51

65

4B

&B

Mate

rial C

om

panie

s $

5

0.0

0

Masonry

Sand -

5-M

iTP

51

65

5B

osto

n M

utu

al Life Insura

nce C

o., I

nc.

$

3

97

.04

E

mplo

yee P

aid

Supple

menta

l In

sura

nce

51

65

6C

hang

e C

ente

r fo

r H

ealth

$

3

,25

1.5

0

Welln

ess C

ente

r -

Marc

h

51

65

7C

ity o

f M

aum

elle

$

11

,63

2.3

0

Fra

nchis

e T

ax -

Janua

ry 2

02

1

51

65

8C

ity o

f N

ort

h L

ittle R

ock

$

79

,66

5.9

3

Fra

nchis

e T

ax -

Janua

ry 2

02

1

51

65

9C

N A

Sure

ty $

20

0.0

0

Bond R

enew

al C

ity o

f S

herw

ood, C

ity o

f M

aum

elle

51

66

0C

onsolid

ate

d P

ipe &

Supply

$

1

,77

7.0

6

NLR

Manho

le C

overs

, S

wg C

kv, G

alv

Nip

ple

s, F

ern

co

51

66

1C

ore

& M

ain

, LP

$

1

71

.56

W

ashw

ate

r P

um

p P

art

s -

FLT

P

51

66

2C

ranfo

rd C

onstr

uction C

o.

79

6.2

3$

Asphalt R

epa

irs -

Ward

4, 2

51

66

3D

ata

max

$

1

21

.06

M

onth

ly M

ain

ten

ance &

Overa

ge A

dm

in C

opie

r

51

66

4D

ept o

f F

inance a

nd A

dm

inis

tration

$

17

,73

8.6

1

Sta

te W

ithho

ldin

g -

Janua

ry

51

66

5D

iscountC

ell,

Inc.

$

2

,15

8.2

5

1-Y

r. R

ene

wal of

Net C

loud E

ssentials

- S

CA

DA

51

66

6D

oork

ing, In

c.

$

51

.95

G

ate

Ce

ll P

hone

Month

ly

51

66

7E

agle

Fence D

istr

ibuting

$

7

08

.49

T

ransfo

rmer,

Mem

ory

, P

ow

er

Sup

ply

- 5

-Mi and

FLT

P G

ate

s

51

66

8E

co-T

ech, In

c.

$

4

72

.34

S

odiu

m H

ydro

xid

e -

FLT

P

51

66

9E

nte

rgy

$

7

21

.78

E

lectr

ic B

ills: C

rysta

l B

ay, M

aum

elle

Woods, B

ridgew

ay #

2,

Hw

y 3

65

51

67

0E

ure

ka G

ard

ens F

acili

ties B

oard

$

3

,45

0.0

0

Debt F

ee C

olle

cte

d J

an. C

ycle

4

51

67

1F

isher

Scie

ntific

$

7

73

.48

pH

Pro

bes, P

etr

i D

ishes -

Lab

51

67

2F

leet T

ire S

erv

ice

$

2

42

.61

U

nit 1

00

- 1

Tire; #1

0 T

raile

r F

lat R

ep

air

51

67

3F

rank F

letc

her

Dodge

$

1

26

.48

U

nit 1

30

- R

epla

cem

ent K

ey

51

67

4G

rain

ger

$

1

02

.55

G

enera

l P

urp

ose R

ela

ys -

8 P

in

51

67

5G

ravel R

idge S

ew

er

Dis

tric

t $

2

0,1

69

.24

B

illed A

ccounts

Jan C

ycle

4

51

67

6H

arc

ros C

hem

icals

$

1

,30

8.3

6

2 x

Ton C

onta

iners

of

Chlo

rin

e -

FLT

P

51

67

7H

enard

Utilit

y P

roducts

$

8

,50

4.3

9

Cues C

able

Assem

blie

s, 4-P

in C

able

Part

s

51

67

8H

om

e D

epo

t C

redit S

erv

ices

$

9

33

.09

Q

uik

rete

, P

art

s to In

sta

ll G

as H

eate

r, 6

-Port

Com

pre

ss

51

67

9Jack T

yle

r E

ng

ineeri

ng C

o.

$

1

,05

4.5

0

Case, Im

pelle

r, C

utter

Rota

ting, S

tationary

Cutter

51

68

0Jim

my a

nd

Mary

Law

rence

$

1

,00

0.0

0

Easem

ent fo

r G

oshen R

oad P

roje

ct

51

68

1Jim

my D

on W

addle

s H

aulin

g, In

c.

$

2

,30

0.0

0

Bio

solid

s H

aulin

g f

rom

MT

P to T

wo P

ines L

an

dfill

10 L

oads 2

/2-

2/8

/2021

51

68

2Joe's

Gara

ge &

Wre

cker

Serv

ice

$

1

,46

1.3

7

Unit 1

34

- E

lectr

icia

n's

Van R

ep

air

s

51

68

3L&

L M

unic

ipal S

upplie

s &

Tools

$

1

,91

4.6

2

Work

Glo

ves, 12V

LE

D L

ights

, M

ed T

apers

; B

lue S

teel S

ew

er

Roda

51

68

4O

'Reill

y A

uto

motive S

tore

s $

14

9.3

1

Wip

er

Flu

id, W

ipes, C

ar

Duste

r, D

eta

il B

rush U

nit 1

47

; U

nit 1

08

Antifr

eeze, O

il,

Filt

ers

, H

ex K

ey S

et

Page 3

Page 17: CBOD TSS - p1cdn4static.civiclive.com

CK

CH

EC

K

#P

AY

AB

LE

TO

A

MO

UN

TD

ES

CR

IPT

ION

NO

RT

H L

ITT

LE

RO

CK

WA

ST

EW

AT

ER

CA

SH

DIS

BU

RS

EM

EN

TS

Fe

bru

ary

28,

202

1

51

68

5P

AG

is $

3

9,7

05

.00

A

nnua

l D

ues -

Com

mitte

e A

ppro

ved

51

68

6P

ete

rson C

on

cre

te S

eptic T

ank

$

1

,75

6.5

5

Ris

er,

Cone, N

LR

Rin

g &

Cover/

Ward

1

51

68

7P

ettus O

ffic

e P

roducts

$

2

98

.62

F

ile F

old

ers

, copy P

aper,

Coff

ee, S

tirr

ers

, T

hum

b D

rives, P

aper

Tow

els

, K

leene

x,

Org

aniz

er,

HR

Fold

ers

51

68

8P

ipe &

Tube S

upply

$

7

99

.35

A

lum

inum

Bar

Gra

te -

Washw

ate

r P

um

p

51

68

9P

ow

ers

Tru

ck &

Equip

ment

$

94

.83

P

ark

er

Fittings, P

ark

er

Hose #

144

51

69

0P

rofe

ssio

nal F

orm

s &

Supplie

s $

13

4.0

7

A/P

Checks

51

69

1R

GA

$

42

.13

T

iger

Tail

Cla

mps #

14

3

51

69

2S

cott A

uto

motive C

ente

r $

5

4.5

6

Unit 1

47

Oil

Chang

e

51

69

3S

ew

er

Dis

tric

t #21

1 $

1,5

58

.75

B

illed R

un

yan A

cre

s A

ccount

Jan C

ycle

1 &

4

51

69

4S

onny F

ulm

er

Tru

ckin

g $

2,8

89

.40

H

aulin

g S

tone

& G

ravel to

FLT

P, 29th

St, M

aum

ell

51

69

5S

pa C

he

mic

als

, In

c.

$

1

86

.12

G

erm

Aw

ay W

ipes -

Ops

51

69

6S

un H

og

Sola

r, L

LC

$

2

91

,80

4.2

1

5-M

ile S

ola

r P

roje

ct -

App

lication #

7

51

69

7T

erm

inix

Pro

cessin

g C

en

ter

$

1

39

.07

M

onth

ly P

est S

erv

ice A

dm

in

51

69

8U

SA

Blu

ebo

ok

$

1

,28

8.3

7

Filt

ers

, C

aps, pH

10

, S

heet

Pro

tecto

rs, Z

iplo

c D

ocum

ent H

old

ers

, G

lass P

ipets

,

Sili

cone P

um

p T

ubin

g, M

eth

anol

51

69

9U

BS

$

1

,65

7.2

0

Wate

r B

ills: M

urp

hy D

r, L

ab

, F

LT

P, M

TP

51

70

0W

aste

Manag

em

ent

$

27

,12

1.7

3

Bio

solid

s R

em

oval F

LT

P J

anua

ry

51

70

1W

eb L

ubri

cations, In

c./Jiffy

Lub

e $

7

9.2

9

Unit 1

24

Oil

Chang

e

51

70

2W

els

co

$

45

.87

C

ylin

der

Renta

l

51

70

3X

pert

Dia

gno

stics, In

c.

$

45

.00

P

ost A

ccid

ent

Dru

g/A

lcohol T

esting

EL

EC

PY

MT

- 3

AF

LA

C Insura

nce

$

1

,51

9.4

8

Em

plo

yee P

aid

Supple

menta

l In

sura

nce

51

70

4O

CS

E C

leari

ngho

use S

DU

56

9.5

0$

Child

Suppo

rt O

blig

ation -

3 E

mplo

yees p

ayro

ll end

ing 2

/14/2

1

51

70

5H

eart

of

Ark

ansas U

nited W

ay

$

53

.00

E

mplo

yee C

ha

rita

ble

Contr

ibutions P

ay P

erio

d E

ndin

g 2

.14.2

021

51

70

6N

LR

Com

munity C

ente

r $

4.9

3

Em

plo

yee P

aid

Fitness M

em

bers

hip

Pay P

erio

d E

ndin

g 2

.14.2

021

AF

-04

Ark

ansas F

edera

l C

redit U

nio

n $

4,0

36

.31

Em

plo

yee D

ep

osits -

Pay P

erio

d E

ndin

g 2

/14/2

021

NA

T-0

4N

ationw

ide R

etire

ment S

olu

tions

$

2

,75

8.0

0

Retire

ment C

ontr

ibutions -

Pay P

erio

d E

ndin

g 2

/14/2

021

PR

-04

Payro

ll T

ax D

eposit

$

68

,56

0.5

9 P

ayro

ll T

axes -

Pay P

erio

d E

ndin

g 2

/14/2

021

51

70

7A

-1 R

ecovery

$

2

73

.75

T

ow

- U

nit 1

42

51

70

8A

DE

Q/W

WL

$

1

00

.00

1 E

mplo

yee O

pera

tor

Lic

ense R

ene

wal F

ee #

005

572

51

70

9A

FLA

C

$

1

,51

9.4

8

Em

plo

yee P

aid

Supple

menta

l In

sura

nce

51

71

0A

llied S

upply

, In

c.

$

4

94

.36

S

lotted

Str

uts

, S

trut C

lam

ps, B

andsaw

Bla

des, P

VC

Snip

pers

, B

olt &

Gasket

Sets

, F

ull

Face R

ubb

er

Gaskets

51

71

1A

rkansas D

em

ocra

t G

azette

$

1

57

.00

Lega

l A

d -

Request fo

r S

tate

ments

of

Qualif

ications f

or

Pro

f S

vcs -

2 S

unda

ys

51

71

2A

rkansas M

idla

nd R

ailr

oad

$

90

.00

P

ipelin

e C

rossin

g L

ease 3

/1/2

1 -

2/2

9/2

4

51

71

3A

rkansas O

ne-C

all

Syste

m, In

c.

$

4

16

.40

Jan 2

021 C

all

Fee/ F

eb M

em

ber

Fee

51

71

4A

rkansas S

ign &

Barr

icade,

Inc.

$

2

80

.00

Lane

Clo

sure

& A

dditio

nal R

enta

l W

ard

1

51

71

5A

T&

T $

30

1.0

0

Dis

trib

ute

d D

enia

l of

Serv

ice (

Security

) 2/5

- 3

/4/2

021

Page 4

Page 18: CBOD TSS - p1cdn4static.civiclive.com

CK

CH

EC

K

#P

AY

AB

LE

TO

A

MO

UN

TD

ES

CR

IPT

ION

NO

RT

H L

ITT

LE

RO

CK

WA

ST

EW

AT

ER

CA

SH

DIS

BU

RS

EM

EN

TS

Fe

bru

ary

28,

202

1

51

71

6A

T&

T M

obili

ty $

2,2

32

.40

M

obile

Serv

ice S

CA

DA

51

71

7A

uto

mationD

irect.C

om

, In

c.

$

2

,07

5.0

3

HO

A S

witches a

nd

Leg

end P

late

s; 2 x

Echopa

d U

ltra

sonic

for

FL B

eltpre

ss

Poly

mer

51

71

8B

right S

yste

ms, In

c.

$

3

,41

9.2

9

Vario

us L

icenses f

or

Cis

co M

era

ki D

evic

es

51

71

9C

ente

rpoin

t E

nerg

y $

4,3

43

.73

G

as B

ills: L

ab, F

LT

P, A

ustin L

akes G

en, G

ap C

reek G

en, E

ure

ka G

rdn G

en,

Cla

yto

n C

hapel G

en, D

ixie

Gen

51

72

0C

entr

al A

rkansas W

ate

r $

4

4,6

83

.85

W

aste

wate

r B

illin

g F

ees f

or

Dec 2

02

0/E

xpense B

ooked in J

an

51

72

1C

olo

nia

l Life

$

2

19

.42

E

mplo

yee P

aid

Supple

menta

l In

sura

nce

51

72

2C

ore

& M

ain

, LP

$

27

.27

C

I/P

VC

Cplg

- W

ard

2

51

72

3C

rist E

ngin

eers

, In

c.

$

19

,65

0.0

0

Infr

astr

uctu

re Im

pro

vem

ents

- Invoic

e P

erio

d D

ec 2

7,

2020

- J

an 2

7, 20

21

Maum

elle

Div

ers

ion to

White O

ak (E

xecute

d 2

/8/2

018

)

51

72

4In

land P

ipe R

eh

abili

tation

$

2

50

.00

R

efu

nd o

f P

lan S

et F

ee -

Dark

Hollo

w/R

eis

sue o

f V

oid

ed C

k#186

6

51

72

5D

arr

ell

R. S

ansom

$

4

,87

5.0

0 N

etw

ork

Consultin

g -

Feb 2

021 (

Budge

t Item

)

51

72

6D

ata

max

$

1

63

.66

Month

ly M

ain

ten

ance &

Overa

ge C

S&

E C

opie

r

51

72

7D

igi-

Key E

lectr

onic

s 3

05

8463

$

8

96

.27

C

able

s, C

able

Tie

Hold

ers

, S

olid

Sta

te R

ela

ys -

Lifts

tations

51

72

8D

igital P

rint &

Im

agin

g o

f LR

$

2

46

.28

P

rinting -

En

gin

eeri

ng P

ads, B

usin

ess C

ard

s/C

layto

n

51

72

9E

agle

Fence D

istr

ibuting

$

1

,07

1.0

8 8

x G

ate

Ro

llers

- W

hite O

ak

51

73

0E

nte

rgy

$

37

,48

8.0

8 E

lectr

ic B

ills: W

O S

tructu

re, B

ars

cre

en,

Lag

oons, W

OT

P, C

layto

n C

hapel, A

ustin

Lakes, 5-M

i In

fl, M

arc

he',

Tra

mm

ell

Esta

tes, 5-M

i #1,

5-M

i S

, G

ate

, M

idS

tate

,

McA

lmont, F

rontier

Dr,

Rix

ie/H

wy 1

61

, C

hap

el R

idge,

Hill

lake, Q

uapa

w, E

ure

ka

Grd

Rd, 4

6th

, Judy

51

73

1E

ure

ka G

ard

ens F

acili

ties B

oard

$

4

50

.00

D

ebt F

ee C

olle

cte

d J

an. C

ycle

7

51

73

2S

herw

ood E

xpre

ss O

il $

5

4.1

0

Oil

Chang

e U

nit 1

49

51

73

3F

edE

x $

7

8.5

4

Ship

Cam

era

to C

ues G

round

; P

riority

Overn

ight L

etter

to Insitufo

rm

51

73

4F

leet T

ire S

erv

ice

$

24

.64

F

ix F

lat T

raile

r #12

51

73

5F

uelm

an

$

8

,63

1.6

3

Month

of

Janua

ry F

leet V

ehic

les G

asolin

e &

Die

sel

51

73

6G

rain

ger

$

7

79

.36

E

fflu

ent

Pum

p -

MT

P R

AS

Pit

51

73

7G

ravel R

idge S

ew

er

Dis

tric

t $

1

7,7

46

.92

B

illed A

ccounts

Jan C

ycle

s 7

,9 &

EO

M

51

73

8G

reen &

Chapm

an, In

c.

$

4

56

.41

55 G

al of

15W

-40 O

il fo

r E

qu

ipm

ent

51

73

9H

ach C

om

pany

$

1

,23

7.3

5 L

BO

D P

robe -

lab

51

74

0H

eri

tage

Environm

enta

l S

vcs, LLC

$

1

,75

8.1

7

CO

D V

ial R

ecyclin

g/W

aste

Dis

posal

51

74

1H

ilburn

, C

alh

oon

, H

arp

er,

Pru

nis

ki &

Calh

oun

et a

l $

1,4

24

.50

Lega

l R

eta

iner

and S

pecia

l P

roje

cts

Janua

ry B

illin

g

51

74

2In

situfo

rm T

echnolo

gie

s, LLC

$

72

,14

0.7

0

Estim

ate

#9 L

akew

ood

CIP

P /C

om

mitte

e A

ppro

ved

51

74

3Jim

my D

on W

addle

s H

aulin

g, In

c.

$

1

,38

0.0

0

Bio

solid

s H

aulin

g f

rom

MT

P to T

wo P

ines L

an

dfill

6 L

oads 2

/9-

2/1

0/2

021

51

74

4L&

L M

unic

ipal S

upplie

s &

Tools

$

5

51

.88

Y

ello

w P

VC

Sew

er

Glo

ves

51

74

5Lega

l S

hie

ld8

9.7

0$

Em

plo

yee P

repaid

Le

gal S

erv

ices

51

74

6M

etr

o-R

epro

, In

c.

$

90

.65

P

aper

for

Eng

ineeri

ng P

lotter

51

74

7M

illim

an, In

c.

$

2

,80

0.0

0

24 M

onth

Tota

l A

ccess to G

AS

B 7

4 &

75 f

or

Sm

alle

r G

ov't

Entities (

Audit R

eq)

Page 5

Page 19: CBOD TSS - p1cdn4static.civiclive.com

CK

CH

EC

K

#P

AY

AB

LE

TO

A

MO

UN

TD

ES

CR

IPT

ION

NO

RT

H L

ITT

LE

RO

CK

WA

ST

EW

AT

ER

CA

SH

DIS

BU

RS

EM

EN

TS

Fe

bru

ary

28,

202

1

51

74

8N

ort

h L

ittle R

ock E

lectr

ic $

3

4,1

40

.82

E

lectr

ic B

ills: W

ilcox, Lab

, C

S&

E, I-

440 Ind

Pk, M

ary

land P

lace, M

ary

land E

,

Oakbro

ok, F

LT

P, S

hill

cutt, F

L B

low

er

51

74

9N

ort

hsid

e S

ale

s C

o.

$

7

45

.29

R

ubbe

r B

oots

, P

op-U

p W

ipes, R

em

ote

Mounting K

it f

or

SO

2 D

ete

cto

r

51

75

0O

.J.'s

Serv

ice T

wo, In

c.

$

1

,02

9.3

0

Month

ly J

anitori

al S

erv

ice Incl. C

leanin

g S

how

ers

in C

S&

E

51

75

1O

ffic

e D

epo

t $

26

2.7

9

Tri-P

od P

roje

cto

r S

cre

en f

or

Tra

inin

g R

oo

m

51

75

2P

ettus O

ffic

e P

roducts

$

1

,80

3.7

1

Coff

ee, C

ups, P

ens, K

eyboard

, M

anila

Fold

ers

, 2-P

ocket F

old

er

Walle

ts,

Mechanic

al P

encils

, T

issue, P

aper,

Lead

, C

leansin

g W

ipes, S

weete

ner,

Coff

ee

Filt

ers

, N

ote

book, B

atteri

es, C

ream

er,

Pri

nte

r In

k, Lam

inating P

ouches, H

and

Sanitiz

er,

Cup L

ids, S

olo

Cups

51

75

3P

oly

tec, In

c.

$

7

,11

7.5

9

Poly

mer

- F

L B

elt P

ress

51

75

4P

ost O

ak A

cre

s, In

c.

$

35

.00

D

irt W

ard

2

51

75

5U

S P

osta

l S

erv

ice

$

3

88

.00

P

O B

ox 1

78

98 R

en

tal -

3/2

021 -

2/2

02

2

51

75

6P

ow

ers

Tru

ck &

Equip

ment

$

1

,92

5.4

8

Repair

Backhoe 5

55-D

5 (

Gra

vel Y

ard

)

51

75

7R

JN

Gro

up,

Inc.

$

47

,99

4.0

8

2020

SS

ES

- thro

ugh 1

/22/2

021

51

75

8S

ew

er

Dis

tric

t #21

1 $

6

2,9

37

.22

B

illed R

un

yan A

cre

s A

ccount

Jan C

ycle

s 7

,9 &

EO

M

51

75

9S

pa C

he

mic

als

, In

c.

$

7

48

.86

D

egre

aser

and P

op-U

p T

ow

els

51

76

0V

erizon C

on

nect F

leet U

SA

, LLC

$

7

35

.00

M

onth

ly T

rackin

g S

erv

ice 2

1 U

nits -

FE

B

51

76

1V

erizon W

irele

ss

$

2

,49

1.6

9

Month

ly M

obile

Serv

ice C

ell

Phone

s &

iP

ads

51

76

2W

ashin

gto

n N

ational In

sura

nce C

o.

$

1

,10

5.3

9

Em

plo

yee P

aid

Supple

menta

l In

sura

nce

51

76

3W

aste

Manag

em

ent

$

7

,36

8.3

4

Month

ly D

um

pste

rs/F

LT

P, V

acC

ons, S

hill

cutt, W

OT

P, M

TP

, 5-M

i; D

isposal of

Bio

solid

s M

TP

to T

wo P

ines L

an

dfill

(2/1

- 2

/15/2

021

)

EL

EC

PY

MT

- 4

Cente

nnia

l B

ank C

redit C

ard

$

1

,16

0.5

2

Cable

La

bels

, R

etire

ment C

ookie

s, D

ec. In

deed J

ob P

ostings, K

eypad &

Cable

Gate

1 F

L, H

ydra

ulic

Data

Book, Jan C

om

mitte

e L

unch, C

op

y o

f A

ccid

ent

Report

,

Flo

rist/E

mplo

yee F

ath

er

Funera

l; E

mplo

yee B

aby

EL

EC

PY

MT

- 5

Purc

hase P

ow

er

$

8

06

.50

P

osta

ge

Mete

r R

efill

EL

EC

PY

MT

- 6

Pula

ski C

ounty

Cle

rk $

5

0.0

0

Record

ing F

ee -

2 E

asem

ents

51

76

4N

ort

h L

ittle R

ock E

lectr

ic $

3,0

10

.28

E

lectr

ic B

ills: H

wy 1

07

, F

L P

lant M

ain

t, A

dm

in, D

elta L

aw

n, G

allo

way/M

aybelli

ne,

Dix

ie, La

nsbro

ok/H

olt, F

aulk

ner

Xin

g, S

hort

er

Colle

ge,

Cypre

ss X

ing, H

arr

is

Indu

str

ial, B

aucum

Indu

st, L

akew

ood

, P

inetr

ee P

t, W

O G

ate

, F

L S

ludge

Lag

oon,

3804

B N

ona,

381

2B

Nona,

382

4B

Nona

TO

TA

L U

TIL

ITY

CA

SH

DIS

BU

RS

EM

EN

TS

1,6

57

,54

3.7

8$

Pay P

erio

d E

ndin

g 1

/31/2

11

53

,63

2.0

5$

Pay P

erio

d E

ndin

g 2

/14/2

11

57

,58

9.5

7$

Page 6

Page 20: CBOD TSS - p1cdn4static.civiclive.com

CK

CH

EC

K

#P

AY

AB

LE

TO

A

MO

UN

TD

ES

CR

IPT

ION

NO

RT

H L

ITT

LE

RO

CK

WA

ST

EW

AT

ER

CA

SH

DIS

BU

RS

EM

EN

TS

Fe

bru

ary

28,

202

1

AD

FA

Dra

ws

37

8,5

44

.01

$

Annua

l S

afe

Depo

sit B

ox R

enta

l2

5.0

0$

Month

ly C

leare

nt F

ee

28

.45

$

Serie

s 2

01

6 C

hecks

-$

2,3

47

,36

2.8

6$

Page 7

Page 21: CBOD TSS - p1cdn4static.civiclive.com

CK

CH

EC

K

#P

AY

AB

LE

TO

A

MO

UN

TD

ES

CR

IPT

ION

-$

NO

RT

H L

ITT

LE

RO

CK

WA

ST

EW

AT

ER

CA

SH

DIS

BU

RS

EM

EN

TS

20

16

CO

NS

TR

UC

TIO

N F

UN

D

Fe

bru

ary

28

, 2

02

1

Page 22: CBOD TSS - p1cdn4static.civiclive.com

DA

TE

AM

OU

NT

TO

FR

OM

2/1

/2021

153,6

00.0

0$

Opera

tions-P

ayr

oll

Sew

er

Tra

nsfe

r fo

r P

ay P

eriod E

nded 1

/31/2

1, P

aid

to E

mplo

yees o

n 2

/2/2

1

2/4

/2021

500.0

0$

Opera

tions-P

ayr

oll

Sew

er

Tra

nsfe

r to

Incre

ase P

ayr

oll

Account B

ala

nce

2/5

/2021

527,4

00.0

0$

Opera

tions

Sew

er

Tra

nsfe

r fo

r A

ccounts

Paya

ble

Checks P

aid

2/1

-2/5

2/1

0/2

021

643,3

00.0

0$

Opera

tions

Sew

er

Tra

nsfe

r fo

r A

ccounts

Paya

ble

Checks P

aid

2/1

0

2/1

2/2

021

157,5

00.0

0$

Opera

tions-P

ayr

oll

Sew

er

Tra

nsfe

r fo

r P

ay P

eriod E

nded 2

/14/2

1, P

aid

to E

mplo

yees o

n 2

/16/2

1

2/1

9/2

021

76,0

00.0

0$

O

pera

tions

Sew

er

Tra

nsfe

r fo

r A

ccounts

Paya

ble

Checks P

aid

2/1

6

2/2

4/2

021

410,8

00.0

0$

Opera

tions

Sew

er

Tra

nsfe

r fo

r A

ccounts

Paya

ble

Checks P

aid

2/2

4

1,9

69,1

00.0

0$

NO

RT

H L

ITT

LE

RO

CK

WA

ST

EW

AT

ER

FU

ND

TR

AN

SF

ER

S

Fe

bru

ary

28

, 2

02

1

DE

SC

RIP

TIO

N

Page 1

Page 23: CBOD TSS - p1cdn4static.civiclive.com

(4)

FINANCIAL STATEMENTS FOR FEBRUARY 2021

ACTION REQUESTED:

Approve the Financial Statements for February 2021.

Page 24: CBOD TSS - p1cdn4static.civiclive.com
Page 25: CBOD TSS - p1cdn4static.civiclive.com
Page 26: CBOD TSS - p1cdn4static.civiclive.com
Page 27: CBOD TSS - p1cdn4static.civiclive.com
Page 28: CBOD TSS - p1cdn4static.civiclive.com
Page 29: CBOD TSS - p1cdn4static.civiclive.com
Page 30: CBOD TSS - p1cdn4static.civiclive.com
Page 31: CBOD TSS - p1cdn4static.civiclive.com
Page 32: CBOD TSS - p1cdn4static.civiclive.com

(5)

ANNUAL GRAVEL AND STONE BID

Bids for the procurement of gravel, stone, riprap and other backfill or aggregate materials for

calendar year 2021, were received on February 23, 2021. The low bidder is Granite

Mountain Quarries of North Little Rock, Arkansas. The total base bid cost for NLRW using

estimated quantities from 2020 is $28,699.50.

ACTION REQUESTED:

Authorize staff to utilize Granite Mountain Quarries of North Little Rock as the supplier for

gravel, stone, riprap and other backfill or aggregate materials for calendar year 2021.