Maine Department of Transportation Full POA · Concurrences on POA (name, title,...
Transcript of Maine Department of Transportation Full POA · Concurrences on POA (name, title,...
Final Recommended Action:DocID_162
Attachment D: Bridge Elevation Summary Showing Existing Streambed and Foundation Depth(s)
The Following Materials Are Being Submitted With This Report:
Attachment G: Plan View Showing Location of Scour Holes, Debris, etc,
Attachment C: Map Showing Detour Route(s)
Attachment E: Boring Logs and/or Other Subsurface Information
Attachment F: Supporting Documentation, Calculations, Estimates, and Conceptual Designs for Scour Countermeasures
Attachment B: Photos
Feature Carried: Route 161
Waterway Crossed: River,rr & Street
Maine Departmentof Transportation
Scour Critical BridgePlan of Action (POA) Report
POA Report
Full POA
Abbreviated POA
Attachment I: Field Verification Card
Bridge Name: Aroostook River
Bridge Number: 5572
Town: Caribou
Attachment H: Post Flood Inspection Documentation
Attachment A: Hydraulic and Hydrologic Summary Page
Attachment J: MaineDOT Underwater Inspection Reports
Attachment K: T.Y. LIN 1995 Bridge Scour Evaluation Report
Attachment L: 2008 USGS Report
Attachment M: Scour / H&H Backup Calculations
Increased Inspection Frequency: Yes No
Hydraulic/Structural Countermeasures: Yes No
Frequency of Flood Monitoring:
Flood Warning Issued by National Weather Service
USGS Gage Station Station#: 1017000
Flood Monitoring:
12 hrs
Closure Trigger:
Interim Reopening Trigger:
SEE SECTION 8 FOR OTHER CLOSURE CONSIDERATIONS
SEE SECTION 9 FOR OTHER REOPENING CONSIDERATIONS
Water Surface Elevation Reaches Low Chord
Water Reaches Closure Elevation:
388.9 ft NGVD29 (10-yr event)
Diving 2yr Cycle
SEE FIELD VERIFICATION CARD
SCOUR CRITICAL BRIDGE − PLAN OF ACTIONCaribou 5572
1. GENERAL INFORMATIONStructure:
Year Built:
Aroostook River
1952
City, County:
Caribou, Aroostook
Feature On:
Route 161
Waterway Crossed:
River,rr & Street
Bridge Number:
5572
Year Reconstruction:
NA
Two-lane, seven-span structure with a concrete deck built in 1952 (plans dated Feb. 1950) comprised of four approach spans of steel multi-beams and three main spans of steel trusses. Both abutments and piers 1, 2, 3, and 5 are concrete with 25 foot long piles. Piers 4 and 6 are concrete founded on spread footings with thicknesses of 6 ft and 3.5 ft respectively. Both abutments and Piers 1, 2, and 3 are set back from the channel. CHA pier 5 is referred to as pier 2 in the diving inspection.
Structure Size and Description:
Foundation Details:
KNOWN
UNKNOWN
Reference Datum:
(Looking Downstream L to R)
Embedment (ft): N/A Exposure (ft): 0
Scour Critical Footing Elevation(s) (ft):
Owner:
State Highway Agency
Left Abutment
Embedment (ft): N/A Exposure (ft): 0Right Abutment
Embedment (ft): (P4)6 Exposure (ft): UNKPier 1
Embedment (ft): (P5)4 Exposure (ft): 2Pier 2
Embedment (ft): P6)11 Exposure (ft): 0Pier 3
(Looking Downstream)
(Looking Downstream)
Left Abutment N/A
Right Abutment N/A
Pier 1: P4-59
Pier 2: P5-57
Pier 3: P6-73
(Looking Downstream)
(Looking Downstream)
NGVD 1929
Pier 4: N/A
Embedment (ft): N/A Exposure (ft): N/APier 4
2. RESPONSIBLE FOR POAAuthor(s) of POA (name, title, agency/organization, telephone, email):
Robert Faulkner P.E., CHA Principal Eng. VI, (603) 357-2445, [email protected]
Concurrences on POA (name, title, agency/organization, telephone, email):
Assistant Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580
Date: 8/30/2011
POA Updated by: Assistant Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580
Date of Update: Items Updated:
POA Updated Every
Next Update:
months by (name, title, agency, organization): Assistant Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580
Signature:
Reason for Update: Inspection Cycle Monitoring Event Post FloodInspection
Date:
months
Text9:8/30/2011 Text9:Scour Critical Bridge - Plan of Action: Caribou 5572 Text9: Page 1 of 5
5. RECOMMENDED ACTION(S)
b. Fixed Monitoring Device(s): Yes No
c. Flood Monitoring Program:
d. Hydraulic/Structural Countermeasures:
Yes No
a. Increased Inspection Frequency: Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Recommended Implemented Date
4. NBI CODING INFORMATION
Item 113
Current Previous
Scour Critical
Item 60 Substructure
Item 61 Channel & Channel Protection
Item 71 Waterway Adequacy
3
6
6
9
3
6
6
9
Date 11/5/2007
6. MONITORING PROGRAM RECOMMENDATION6a. Regular Inspection Cycle
Riverbed Profile Readings - Upstream Face
Items toWatch:
Erosion of riverbanks and changes to embedment at Pier 6. The embedment of Pier 6 is estimated to be 11 ft. Piers 4 and 5, the piers located in water, are the piers to monitor for scour.
Biennial
Underwater Inspection Required Items toWatch:
Scour holes at piers, undermining at piers, or changes to exposure at piers. The 1996 bridge review indicated scour evidence at and near Piers 4 & 5. Active scour conditions require a diving inspection every two years. 2010 Diving @ Pier 5 indicate 2ft of ftg exposure @ downstream end. Remaining embedment along the right side of Pier 4 remains unknown.
4 Year Cycle
2 Year Cycle
1 Year Cycle
Annual
Riverbed Profile Readings - Downstream Face
Surveyed Cross-Section
3. SCOUR VULNERABILITYCurrent Item 113 Code: Other:3 2 1
Source of Scour Critical Code: Observation Assessment Calculation Other:
Scour Evaluation Summary: The primary bed material was estimated as sand and the secondary bed material was estimated as gravel. The bed armoring potential is moderate. Piers 1, 2 and 3 are set back from the stream channel while 4 and 5 are in the channel and appear to be more vulnerable to scour. Pier 6 is set above normal water elevation but within the flood channel. The water was too deep to wade to Piers 4 and 5 during CHA's 2009 visit and drop line readings were not practical due to the height of the structure. T.Y. Lin’s 1996 Bridge Scour Evaluation Summary cited a 5/29/92 inspection (1992 report not available) that reported Pier 4 had partial exposure of the spread footing near the nose. Calculations at Pier 4 predict over 19 feet of scour. That same report also noted a significant scour hole along the right side of Pier 5 with the 1996 bed elevation noted 5 ft below the bottom of the seal. Bedrock appeared visible at left side of Pier 4. Water was too deep to assess the right side of Pier 4 and Pier 5. The Maine State Planning Office flood history for this bridge indicates that the flood of record in 1983 did not damage the bridge, and that there is no potential for pressure flow or overtopping at the bridge. CHA recommended a new underwater inspection of the right side of Pier 4 and the perimeter of Pier 5. An inspection of Pier 5 was performed on July 20, 2010. It cited 2 ft of exposure on the top of the footing at the downstream end of Pier 5. CHA recommends installation of heavy riprap around both Piers 4 and 5 to provide protection against additional scour. Until the countermeasure is installed the bridge should be monitored during and after flood events then inspected for potential scouring or damage.
Scour History: Piers 4 and 5, the piers located in water, are the piers to monitor for scour. The bridge was built in 1952. Based on information included in the City of Caribou FIS (2-1980), the USGS gage in Washburn recorded a flood of 43,100 cfs in April 1973. The Fort Fairfield Road bridge (Caribou 5572) will not restrict flow or increase WSEs.
According to the Maine State Planning Office Report, flooding occurred on the Arroostook River in Fort Fairfield in 1994 due to ice jams.
According to the Maine DOT Bridge Scour Evaluation Report (2009), the April 1983 flood of record did not damage the bridge, and noted that there is no potential for pressure flow or overtopping.
Text9:8/30/2011 Text9:Scour Critical Bridge - Plan of Action: Caribou 5572 Text9: Page 2 of 5
6b. Fixed Monitoring Device(s)
Type of Instrument:
Installation Location(s):
Routine Sample Interval 30 minute 1 hr 6 hrs 12 hrs Other
Frequency of Data Download and Review: Daily Weekly Monthly Other:
Criteria of Termination For Fixed Monitoring:
6c. Flood Monitoring Program
Type:
Discharge
Visual Inspection
Instrument (check all that apply)
Portable Geophysical Sonar Other
(check all that apply)
Flood Monitoring event defined by:
36,000 cfs (10-yr, Located 23 miles US)
Stage (Water Surf. Elev.)
Frequency of Flood Monitoring: Continual 3 hrs 12 hrs
Notified By Public
Flood Warning Issued by NWS
DOT Situation Report
USGS Gage Station Station#: 1017000
Criteria to End Flood Monitoring
Conditions Stable / Water Receding
Recommended Post Flood Inspection
Action(s) Required if Scour Critical Elevation Detected: (See Section 7 and Section 8)
Not Applicable
During Inspection Event, Look For:
Water surface at or above the placard elevation.
Revisit Bridge
Close Bridge (See Section 8)
Criteria of Termination For Event Monitoring
Action(s) Required if Scour Critical Elevation Detected: (See Section 7 and Section 8)
Event Sample Interval: Continual 10 min 30 min 1 hour Other
Frequency of Data Download and Review: Daily Weekly Monthly Other:
Daily
Action(s) Required if Scour Critical Elevation Detected: (See Section 7 and Section 8)
Assess changes in channel/riverbed profiles, possible undermining evidence, and overall stability. Consider closing bridge.
Stage (WSE)
NOAA Gage Station #
Text9:8/30/2011 Text9:Scour Critical Bridge - Plan of Action: Caribou 5572 Text9: Page 3 of 5
7. DETOUR ROUTEDetour Route Description:
25.1 miles: Fort St to US Route 1 to Maine Route 163 to Maine Route 167 to Maine Route 205 to Fort St. (Detour length does not match Attachments A anI.)
Bridges on Detour Route:
Bridge Number Feature UnderLoad Posting (tons)
/ DateItem 113
Traffic Control Equipment and Storage location(s):
Additional Considerations or Critical Issues:
News Release, Other Public Notice Information to be provided and limitations:
Public Information Officer, Office of Communications - (207) 624-3030
Feature On
VerticalClearance
(feet)
WidthRestrictions
(feet)
To be provided by Maine DOT
Agency and Department Responsible for Monitoring:
Maine DOT
Contact Person (name, title, agency/organization, telephone, e-mail):
- Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580- Assistant Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580
Riverbed Profile Readings - Upstream and Downstream face
Items toWatch:
Scour holes at piers, undermining at piers, or changes to exposure at piers. The 1996 bridge review indicated scour evidence at and near Piers 4 & 5. Active scour conditions require a diving inspection every two years. 2010 Diving @ Pier 5 indicate 2ft of ftg exposure @ downstream end. Remaining embedment along the right side of Pier 4 remains unknown.
6d. Post-Flood Inspection Tasks Required
Visual Inspection
Profile at Substructure
Undermining
Underwater Inspection
ProbingDate of Event: Date of Post Flood Inspection:
Text9:8/30/2011 Text9:Scour Critical Bridge - Plan of Action: Caribou 5572 Text9: Page 4 of 5
10. COUNTERMEASURE RECOMMENDATIONS
Basis for the Selection of the Preferred Scour Countermeasure:
(1) Heavy Riprap around Piers 4 & 5
Estimated Cost
$ 430,000
(2) $
(3) $
Additional heavy riprap is feasible and a cost effective option.
Maintenance
Other
Bridge Program
Highway Program
Recommended Countermeasures to be Performed by:
Contact Person:
- Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580- Assistant Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580
(include name, title, telephone, e-mail)
PriorityConceptual Structural / Hydraulic Countermeasures:
Recommended Completion Date:
Yes No
Yes No
Yes No
8. BRIDGE CLOSURE PLAN
Scour Measurement Results / Monitoring Device (See Section 6)
Criteria For Consideration of Bridge Closure:
Observed Structure Movement / Settlement
Water Surface Elevation Reaches Low Chord Overtopping Road or Structure
Other: Debris Accumulation Movement of RipRap / Other Armor ProtectionLoss of Road Embankment
Agency and Department Responsible for Closure:
Contact Person(s) (name, title, telephone, email):
Maine DOT Radio Operations, (207) 624-3339
Check all that apply
Water Reaches Critical Elevation:
DOT Municipality: Other
Ice Jam
388.9 ft NGVD29 (10-yr event)
Discharge
Stage (WSE)USGS Gage Station #
Stage (WSE)NOAA Gage Station #
9. BRIDGE REOPENING PLAN9a. Criteria for Consideration to Complete Interim Bridge Reopening:
Agency and Person Responsible for Re-Opening Bridge After Inspection:
- Region Bridge Manager- Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580- Assistant Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580
Post Flood Inspection Completed
Critical Elevation Marker Is Visible
Reasons for Closure Have Abated
Water Surface Levels Dropping
Diving Inspection Completed within 7 calendar days
Verify Riverbed Elevation (drop line readings)
Streambed Elevation Drops Less than 3 Feet
9b. Criteria for Completing Bridge Reopening Process:
Agency and Person Responsible for Interim Re-Opening Bridge After Inspection:
Straight and Consistant Bridgerails
No Approach Settlement
No Embankment Erosion Endandering Abutment
Abutments and Piers are Plumb and Stable
Assess Riverbed Elevation at Piers (drop line reading)
Text9:8/30/2011 Text9:Scour Critical Bridge - Plan of Action: Caribou 5572 Text9: Page 5 of 5
MaineDOT Scour Investigation East PIN:15631.10Hydraulic and Hydrologic Summary Page (POA Attachment A)
Bridge ID: Date:Caribou 5572 7/29/2009Name: Aroostook River
GENERAL INFORMATION
Town: Caribou
Feature Carried: Route 161
Owner: State Highway Agency
Feature Crossed: River,rr & Street
Major Basin (HU8): Aroostook
Functional Class: 19 - Urban Local
Detour Length: 8 (miles)
Year Built: 1952
Year of
Reconstruction: NA
ADT: 2996 Year of ADT: 2008
Overall Fed Sufficiency Rating: 53.3
Item 60: 6 Item 61: 6 Item 71: 9 Item 113: 3
Current:
HYDRAULIC INFORMATION
FEMA Study:
T.Y. Lin Information
USGS Report:
Tidal Influence: Other Hydrologic & Hydraulic Data:
City of Caribou FIS (2-1980) provides water surface elevation and flow data at the bridge. FEMA Hydraulic back-up data available. NGVD29 = Design Plans + 305.5 ft. Maine DOT flow data superseded by FEMA data. Maine DOT data (1994 sq-mi, Q10=40506 cfs,Q50=52315 cfs,Q100=57024 cfs,Q500=67979 cfs). Gage 1017000 is located approximately 23 miles upstream and has been in operation from Aug 1930 to present. Caribou Dam is located 0.4 miles upstream of the bridge and is operated as a hydropower facility. As such, it has little or no storage potential during larger flood events.
100-Yr Water Velocity (feet per sec): 8
Angle Of Attack 0
Watershed Area (sq. mi): 1994
390.3
435.5
52315
57024
67979
391.1
392.7
395
50 year
Table: Flow (cfs) Elevation (ft)
100 year
500 year
Roadway
Low Chord
(Flood Flow)
BRIDGE INFORMATION Bridge Length (in feet): 907.00
Number of Spans: 3
Plans Available: Borings Available:
Worst Abutment Right Worst Pier 5
Abutment Foundation: EB Piles Pier Foundation: Friction Piles
Flood / Scour History
Comments:
Piers 4 and 5, the piers located in water, are the piers to monitor for scour. The bridge was built in 1952. Based on information included in the City of Caribou FIS (2-1980), the USGS gage in Washburn recorded a flood of 43,100 cfs in April 1973. The Fort Fairfield Road bridge (Caribou 5572) will not restrict flow or increase WSEs.
According to the Maine State Planning Office Report, flooding occurred on the Arroostook River in Fort Fairfield in 1994 due to ice jams.
According to the Maine DOT Bridge Scour Evaluation Report (2009), the April 1983 flood of record did not damage the bridge, and noted that there is no potential for pressure flow or overtopping.
:
Flow Impacting Bridge Flow Overtopping Bridge
Bridge Width (in feet): 37.50
Substructure Channel Stability Hydraulic Adequacy Scour Risk
Capacity 28.1 ,
Bridge Plan File Loc: NO DATA
(scale of 1-9)(worst - best)
Yes
Yes
Yes
No
No
No
(Looking Downstream L to R):(Looking Downstream L to R) :
100-Yr Overtopping Relief: No Overtopping
2/1/1980
Bridge Scour Report
Nov 1995:( )
RECOMMENDATIONS
Agree w/ Item 113 Rating:Field Investigation Rec: Scour POA Recommended:
CHA Recommended POA Choice: Riprap
:(Actual Metric Tons, Signed)
Comp: CHA Rec Item 113 Rating: 3
10 year 40506 388.9 No No
USGS Gage Station: 1017000 USGS Station Prox To Bridge: 23 mi. US from bridge
NOAA Gage Station: NOAA Station Prox To Bridge:
Text9:2/21/2011 Text9:Attachment A: H & H Summary: Caribou 5572 Text9: Page 1 of 1
Bridge: Caribou 5572
Date Taken: 6/10/2009 6:57:57 AM
Description: Upstream channel from bridge
Source: CHA
DocID_141
Bridge: Caribou 5572
Date Taken: 6/8/2009 8:54:32 PM
Description: Upstream elevation
Source: Nobis
DocID_162
Text9:2/21/2011 Text9:Attachment B: Bridge Photos: Caribou 5572 Text9: Page 1 of 2
Bridge: Caribou 5572
Date Taken: 6/10/2009 6:58:12 AM
Description: Pier 4 Looking Downstream
Source: CHA
DocID_142
Bridge: Caribou 5572
Date Taken: 6/8/2009 8:55:10 PM
Description: Elevation From Downstream Right
Source: CHA
DocID_157
Text9:2/21/2011 Text9:Attachment B: Bridge Photos: Caribou 5572 Text9: Page 2 of 2
11 King Court
Keene, NH 03431-4648
Main: (603)-357-2445
Maine Scour Investigation
Caribou 5572
Attachment C: Detour Route
Caribou
5572
IF GOING EAST ON FORT ST, REVERSE DIRECTIONS.
DETOUR MAP
GOING WEST ON FORT ST.
MAINE BRIDGE SCOURINVESTIGATION
CARIBOU 5572
BRIDGE ELEVATION SUMMARY11 King Court, Keene, NH 03431-4648
Main: (603) 357-2445 www.chacompanies.com
DATE: 4/15/10
Drawn By: ML
ATTACHMENT D
CHA File No:18925.2003.1510
11 King CourtKeene, NH 03431-4648Main: (603)-357-2445 Maine Scour Investigation
Caribou 5572Attachment F: Scour Countermeasures
Attachment F:Supporting Documentation, Calculations,
Estimates, and Conceptual Designs for ScourCountermeasures
MAINE DOT PROTECTIVE COUNTERMEASURES
ESTIMATED COST OF PROPOSED COUNTERMEASURES - Heavy and Plain Riprap:
5572 SSU's Protected => Piers 4 & 5Caribou Spans Protected => N/A
907 Approved Countermeasure Type => Heavy Riprap38 Low Flow Water Depth => varies
36 ft Design Flow Water Depth => 23na Pier Width (ft) 10 Riprap Width = 2 times pier widthna Pier Length (ft) 40 Riprap Length is along its center
SSU CM TYPE Length (ft) Width (ft) Depth (ft) No. Items Quantity Unit Unit Price Subtotal
1 1 LS $75,000 $75,0001 1 LS $25,000 $25,0000 0 EA $0
0 0 SY $0 0 0 SY $0
240 20 5 2 1778 CY $120 $213,333Proposed work at Piers: $25,000- Machine placed heavy riprap atop existing stone- no water diversion; no excavation; no blanket $338,333- width = 2 x pier width 25% $84,583
$422,917
$430,000
Assumptions:Environmental impact associated with the proposed work is judged to be: potentially significantGiven the estimated quantities for this item, the unit price is judged to be higher thanaverage unit prices.
Notes:The cost of mitigating or eliminating potential environmental impacts is not included in this estimate. The cost of environmental permit preparation is also not included herein.
Access to work area - temporary causeway from Left bank to Pier 4 with "landing" for barges
SubtotalContingency
Total Estimated Cost
Conceptual Budget
Mobilization
Wing Length (ft)
Item
Barge rental for work at Pier 5
Piers 4 & 5Heavy Riprap
Water Diversion Heavy Riprap - excavationHeavy Riprap - filter Heavy Riprap - place stone
Bridge No.Town
Dist. Between Abutment FacesBridge Width
Max. Vertical OpeningAbutment Length (ft)
8/30/2011
N.T.S.
N.T.S.
FLOW
FIL
E N
AM
E =
DA
TE
/TIM
E =
U
SE
R =
V:\
Proje
cts
\AN
Y\K
\19571\P
art
1 -
Orig
inal
99 B
rid
ge A
ssig
nm
ent\
CA
DD
\MS
TN
\Brid
ge P
OA
Fil
es\C
arib
ou 5
572\1
9571_cpb_pl.
dgn
8/3
0/2
011
32
93
ATTACHMENT
CP-NORMAL
SUBTITLE TEXT SIZE
UPSTREAM ELEVATION
N.T.S.
www.chacompanies.comMain: (603) 357-2445
11 King Court Keene, NH 03431-4648
Drawing Copyright c 2009
RA
P1
LA
ANNOTATION SCALE 200
FOOTING ELEVATION (FT) STREAMBED ELEVATION (FT)
BOTTOM CHA FIELD (2009)
INVESTIGATION
F
MAINE BRIDGE SCOUR
TY LIN (1995)
PLACARD INSTALLATION LOCATION
3.4 FT
vPIER 4 ELEVATIONv
FLOW
2.0 FT
vPIER 5 ELEVATIONv
CARIBOU 5572
10-YEAR FLOOD
ELEVATION 388.9
NGVD29
(SEE NOTE 1)
10-YEAR FLOOD
ELEVATION 388.9
NGVD29
(SEE NOTE 1)
19.4 FT
20.4 FT
DATE: 5/10
NOTES:
1. ELEVATION 388.9 NGVD29 CORRESPONDS TO A 10 YEAR FLOOD EVENT.
2. PLACARD LOCATIONS ARE AT THE UPSTREAM END OF BOTH PIERS.
3. PLACARD LOCATION MEASURED TO LOW CHORD AND TOP OF FOOTING.
4. ALL WORK IS TO BE PERFORMED IN DRY CONDITIONS.
5. SKETCH IS CONCEPTUAL ONLY, NOT FOR CONSTRUCTION, AND NOT TO SCALE.
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 1 of 10
MAINE DOT CHANNEL PROFILE
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
.
*Actual skew, if present, not shown
*All units are in English and in decimal form
Fascia
Location Location/Description
Date: Date: Date:
Upstream Readings
(ft)
Downstream Readings
(ft)
Upstream Readings
(ft)
Downstream Readings
(ft)
Upstream Readings
(ft)
Downstream Readings
(ft)
Sta. 1
Sta. 2
Sta. 3
Sta. 4
Sta. 5
Sta. 6
Sta. 7
Sta. 8
Sta. 9
Sta. 10
Notes: Bridge too high for dropline readings. 2 Year diving inspections for Pier 4 and 5 recommended.
Direction of Flow
Datum Reference
Plan View of Dropline Readings
North
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 2 of 10
MAINE DOT ABUTMENT RIVERBED PROFILE FORM
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
Start of Measurements: ______
Interval of
Measurements: _________ft
**All units are in English and in decimal form
Abutment: Left
W = Distance from Low
Chord to Water Surface = DRY ft
H = Distance from Low
Chord to top of footing = *6.3± ft
Location Location Description
DATE: DATE: DATE:
X (ft) X (ft) X (ft)
0
1
2
3
4
5
6
7
8
9
10
Notes: No footing exposure observed during 2009 site visit. *H distance taken from plans.
Flow
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 3 of 10
MAINE DOT PIER PROFILE FORM
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
**All units are in English and in decimal form
Pier: 1
W = Distance from Low
Chord to Water Surface = DRY ft
H = Distance from Low
Chord to top of footing = 27 ft
Location
Location/Description
Date: Date: Date:
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
0
1
2
3
4
5
6
7
8
9
Notes: No footing exposure observed at Pier 1 during the 2009 site visit.
Flow
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 4 of 10
MAINE DOT PIER PROFILE FORM
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
**All units are in English and in decimal form
Pier: 2
W = Distance from Low
Chord to Water Surface = DRY ft
H = Distance from Low
Chord to top of footing = 31.5* ft
Location
Location/Description
Date: Date: Date:
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
0
1
2
3
4
5
6
7
8
9
Notes: No footing exposure observed at Pier 2 during the 2009 site visit. *H distance taken from plans.
Flow
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 5 of 10
MAINE DOT PIER PROFILE FORM
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
**All units are in English and in decimal form
Pier: 3
W = Distance from Low
Chord to Water Surface = DRY ft
H = Distance from Low
Chord to top of footing = 36* ft
Location
Location/Description
Date: 6/8/2009 Date: Date:
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
0
1
2
3
4
5
6
7
8
9
Notes: No footing exposure observed at Pier 3 during the 2009 site visit. *H distance taken from plans.
Flow
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 6 of 10
MAINE DOT PIER PROFILE FORM
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
**All units are in English and in decimal form
Pier: 4
W = Distance from Low
Chord to Water Surface = UNK. ft
H = Distance from Low
Chord to top of footing = 22.76* ft
Location
Location/Description
Date: 6/8/2009 Date: Date:
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
0
1
2
3
4
5
6
7
8
9
Notes: Top of footing exposed at the upstream right corner of the pier. No vertical measurements taken during the 2009 inspection. *H distance taken from plans. Channel bed elevations should be documented at Pier 4 during biennial inspections if possible and during diving inspections.
Flow
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 7 of 10
MAINE DOT PIER PROFILE FORM
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
**All units are in English and in decimal form
Pier: 5
W = Distance from Low
Chord to Water Surface = UNK. ft
H = Distance from Low
Chord to top of footing = 22.38* ft
Location
Location/Description
Date: Date: Date:
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
0
1
2
3
4
5
6
7
8
9
Notes: The water was too deep to access Pier 5 during the 2009 site visit. *H distance taken from plans. Refer also to diving inspection 7/20/10 – Maximum 2ft of exposure.
Flow
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 8 of 10
MAINE DOT PIER PROFILE FORM
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
**All units are in English and in decimal form
Pier: 6
W = Distance from Low
Chord to Water Surface = DRY ft
H = Distance from Low
Chord to top of footing = 24.08* ft
Location
Location/Description
Date: Date: Date:
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
Left Face (ft)
Right Face (ft)
0
1
2
3
4
5
6
7
8
9
Notes: No footing exposure observed at Pier 6 during the 2009 site visit. *H distance taken from plans.
Flow
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 9 of 10
MAINE DOT ABUTMENT RIVERBED PROFILE FORM
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
Start of Measurements: ______
Interval of
Measurements: _________ft
**All units are in English and in decimal form
Abutment: Right
W = Distance from Low
Chord to Water Surface = DRY ft
H = Distance from Low
Chord to top of footing = 9* ft
Location Location Description
DATE: DATE: DATE:
X (ft) X (ft) X (ft)
0
1
2
3
4
5
6
7
8
9
10
Notes: No footing exposure observed during 2009 site visit. *H distance taken from plans.
Flow
ATTACHMENT H: POST FLOOD INSPECTION DOCUMENTATION 10 of 10
MAINE DOT UNDERMINING FORM
Bridge Information
Town/Bridge No. Caribou 5572
Feature Carried ME Route 161 Date of Inspection 6/8/2009
Feature Crossed River, RR & Street Inspector KJH
Owner MEDOT
Location
Date: Date: Date: Date:
Vertical (ft)
Horizontal (ft)
Vertical (ft)
Horizontal (ft)
Vertical (ft)
Horizontal (ft)
Vertical (ft)
Horizontal (ft)
0
1
2
3
4
5
6
7
8
9
10
Notes: No undermining found during 2009 site visit at any substructure unit. (No inspection of Piers 4 and 5, water too deep to wade.)
**All units are in English and in decimal form
SSU:
FACE:
Start Of Measurement
Interval of Measurement:
Flow
Structure: Aroostook River
Detour (miles): Last ADT:
Foundation Details:
KNOWN
UNKNOWN Worst Abutment: Right
Worst Pier: 5(Looking Downstream L to R)
Embedment (feet): 3+ Exposure: None
Embedment (feet): 4 Exposure: Pile Cap Exposed
Diving Insp Reports: 5/29/1992 7/20/2010
FIELD VERIFICATION CARD (POA Attachment I)
Owner: State Highway Agency Feature On: Route 161
Waterway Crossed: River,rr & StreetCity, County: Caribou - Aroostook
Contact Person: - Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580- Assistant Bridge Maintenance Engineer, Maine DOT Bridge Maintenance Division - (207) 624-3580
BRIDGE INFORMATION
Superstructure Type: Truss-Deck
Superstructure Material: Steel
Scour Critical Feature: Piers 4 and 5 Footings
Placard Location: Placards located at the upstream end of Pier 4 and Pier 5.
Number of Spans: 3
USGS Gage Station: 1017000 USGS Station Prox To Bridge: 23 mi. US from bridge
GENERAL INFORMATION
CRITERIA FOR CONSIDERATION OF BRIDGE CLOSURE
Date/Time Notified:Completed Proper Notification
Close BridgeRevisit BridgePost-Flood Inspection Recommendations
POST-FIELD VERIFICATION
ACTION TAKEN
Dates:
Agency:
Items to Watch: Scour holes at piers, undermining at piers, or changes to exposure at piers. The 1996 bridge review indicated scour evidence at and near Piers 4 & 5. Active scour conditions require a diving inspection every two years. 2010 Diving @ Pier 5 indicate 2ft of ftg exposure @ downstream end. Remaining embedment along the right side of Pier 4 remains unknown.
Bridge Number: 5572
Scour Measurement Results / Monitoring Device (See Section 6)
Observed Structure Movement / Settlement
Water Surface Elevation Reaches Low Chord
Overtopping Road or Structure
Debris Accumulation
Movement of RipRap / Other Armor Protection
Loss of Road Embankment
Water Reaches Closure Elevation
Ice Jam
REFERENCE PHOTOS (Left to Right Convention Looking Downstream)
CRITERIA FOR CONSIDERATION TO COMPLETE INTERIM BRIDGE REOPENING:
Agency and Person Responsible for Interim Re-Opening Bridge After Inspection:
Interim Reopening Date:Interim Reopening Approved By: Time:
INTERIM REOPENING COMMENTS
388.9 ft NGVD29 (10-yr event)
DischargeStage (WSE)USGS Gage Station #
Stage (WSE)NOAA Gage Station #
No Approach Settlement
No Embankments Erosion Endandering Abutment
Abutments and Piers are Plumb and Stable
Assess Riverbed Elevation at Piers (drop line readings)
Water Surface Levels Dropping
Critical Elevation Marker Is Visible
Reasons for Closure Have Abated
Straight and Consistant Bridgerails
8 20082996 Year:Total:
Text9:8/30/2011 Text9:Attachment I: Field Verification Card: Aroostook River Text9: Page 1 of 2
Upstream Low Water
DocID_1413.jpg
Upstream Elevation of Bridge at Low Water
DocID_1628_NOBI
Scour Critical Feature at Low Water
DocID_1426.jpg
Text9:8/30/2011 Text9:Attachment I: Field Verification Card: Aroostook River Text9: Page 2 of 2
CHA File No:
18925.2003.1510
11 King Court
Keene, NH 03431-4648
Main: (603)-357-2445
Maine Scour Investigation
Caribou 5572 Attachment J: MaineDOT Underwater
Inspection Reports
Attachment J: MaineDOT Underwater Inspection
Reports
CHA File No:18925.2003.1510
11 King CourtKeene, NH 03431-4648Main: (603)-357-2445 Maine Scour Investigation
Caribou 5572Attachment K: T.Y. Lin 1995 Bridge
Scour Evaluation Report
Attachment K: T.Y. Lin 1995 Bridge ScourEvaluation Report
CHA File No:18925.2003.1510
11 King CourtKeene, NH 03431-4648Main: (603)-357-2445 Maine Scour Investigation
Caribou 5572Attachment M: Scour/H&H Backup
Calculations
Attachment M: Scour/H&H Backup Calculations
CO
MPL
ETED
BY
DW
CD
ATE
CH
ECKE
D B
YSV
EPR
OJ.
NO
.
PRO
J. N
AME
& LO
CAT
ION
Car
ibou
557
2SU
BJEC
TSc
our C
alcs
PIE
R S
CO
UR
CA
LC
Pie
r 4Va
vg (f
ps)
7.8
Aver
age
brid
ge o
peni
ng v
eloc
ity
Ave
rage
Brid
ge o
peni
ng v
eloc
ity fr
om F
EM
A FI
SV 1
(fps
) 9.
4Ve
loci
ty a
t pie
r (V
avg
x M
ultip
lier (
1.2)
)M
ultip
lier v
arie
s fro
m 0
.9 to
1.7
, see
des
crip
tion
belo
w.*
Y 1 (f
t)23
.239
2.7
- 369
.5 (1
00-y
r WS
E e
stim
ate
- Avg
bed
at p
ier 4
nos
e)FE
MA
FIS
/ D
esig
n Pl
ans
θ (d
eg)
0An
gle
of A
ttack
Fiel
d E
stim
ate
h 1 (f
t)0
369.
5 - 3
69.5
(Top
of f
ootin
g - A
vg b
ed a
t pie
r 4 n
ose)
Des
ign
Plan
sa
(ft)
9.9
Pier
Wid
thD
esig
n Pl
ans
L (ft
)36
.3P
ier L
engt
h (B
otto
m)
Des
ign
Plan
sf (
ft)1.
5D
ista
nce
betw
een
the
front
edg
e of
the
foot
ing
and
pier
Des
ign
Plan
sa p
c (ft
)16
Wid
th o
f foo
ting
Des
ign
Plan
sL p
c (ft)
41.3
Leng
th o
f foo
ting
Des
ign
Plan
sT o
pc (f
t)6
Thic
knes
s of
foot
ing
Des
ign
Plan
s
Und
erly
ing
Stre
ambe
dD
95 (f
t)0.
003
Silty
san
d-gr
avel
bed
Fiel
d E
stim
ate
D50
(ft)
0.00
06S
ilty
sand
-gra
vel b
edFi
eld
Est
imat
e
Arm
orin
g La
yer
D95
(ft)
N/A
D50
(ft)
N/A
* Ve
loci
ty m
ultip
lier v
arie
s fro
m 0
.9 fo
r a p
ier n
ear t
he b
ank
in a
stra
ight
uni
form
reac
h to
1.7
for a
pie
r in
the
mai
n cu
rrent
of f
low
on
a sh
arp
bend
.
NO
TES
5/10
/201
0
1957
1
VAR
IABL
ESO
UR
CE
CA
LC /
NO
TES
5/10
/201
0Pa
ge 1
of 2
Atta
chm
ent M
K4:
AR
MO
RIN
G C
OEF
FIC
IEN
TC
OM
PLEX
PIE
R S
CO
UR
CO
MPU
TATI
ON
S C
ASE
2R
efer
ence
for m
etho
dolo
gy:
HEC
-18
Four
th E
ditio
nC
arib
ou 5
572
(100
-Yea
r Eve
nt)
K4:
PIE
R C
OM
PON
ENT
Pier
#4
D95
(ft)
=0.
0030
<---
Fiel
d Es
timat
eD
50 (f
t) =
0.00
06<-
--Fi
eld
Estim
ate
CO
MPL
EX P
IER
S SC
OU
R A
NA
LYSI
S V 1
: APP
RO
ACH
VEL
OC
ITY
(ft/s
) =
9.36
y: D
EPTH
(ft)
=23
.20
Ref
eren
ce fo
r met
hodo
logy
: H
EC-1
8 4t
h Ed
ition
Cha
pter
6a:
PIE
R W
IDTH
(ft)
=9.
90K u
=
11.1
7PI
ER C
OM
PON
ENT
Yes
Vc95
: CR
ITIC
AL V
ELO
CIT
Y FO
R D
95 (f
t/s)
=2.
72B
ent N
umbe
rPi
er #
4Vc
50: C
RIT
ICAL
VEL
OC
ITY
FOR
D50
(ft/s
) =
1.59
V 1: V
ELO
CIT
Y (fp
s)9.
36V i
C95
: IN
ITIA
L SC
OU
R V
ELO
CIT
Y FO
R D
95 (f
t/s)
=1.
14Y 1
: DEP
TH (f
t)23
.2V i
C50
: IN
ITIA
L SC
OU
R V
ELO
CIT
Y FO
R D
50 (f
t/s)
=0.
61
ATTA
CK
ANG
LE, D
egre
es0
V R: V
ELO
CIT
Y R
ATIO
(ft/s
) =
19.4
9h 1
: PI
ER S
TEM
HEI
GH
T AB
OVE
BED
(ft)
0.00
K4 =
1.00
IND
IVID
UA
L PI
ER W
IDTH
(ft)
9.90
a: P
IER
WID
TH (f
t)9.
90K
4: F
OO
TIN
G C
OM
PON
ENT
L: P
IER
LEN
GTH
(ft)
36.3
0Pi
er #
4f:
PIER
SET
BAC
K FR
OM
ED
GE
OF
PILE
CAP
(ft)
1.50
D95
(ft)
=0.
0030
PIER
SH
APE
(S=S
QU
ARE,
C =
CIR
CU
LAR
, SN
= S
HAR
P N
OSE
)sn
D50
(ft)
=0.
0006
K 1: S
HAP
E C
OEF
FIC
IEN
T0.
90V 1
: APP
RO
ACH
VEL
OC
ITY
(ft/s
) =
8.19
K 2: A
NG
LE C
OEF
FIC
IEN
T1.
00y:
DEP
TH (f
t) =
26.5
0K 3
: BED
CO
ND
. CO
EFFI
CIE
NT
1.10
a: C
AP W
IDTH
(ft)
=16
.00
K 4: B
ED A
MO
RIN
G C
OEF
FIC
IEN
T1.
00K u
=
11.1
7K h
pier:
WEI
GH
TIN
G F
ACTO
R F
OR
PIE
R S
CO
UR
0.40
Vc95
: CR
ITIC
AL V
ELO
CIT
Y FO
R D
95 (f
t/s)
=2.
78g:
gra
vita
tiona
l con
stan
t (ft/
s2 )32
.20
Vc50
: CR
ITIC
AL V
ELO
CIT
Y FO
R D
50 ft
/s)
=1.
63
FRO
UD
E N
UM
BER
, Fr
0.34
V iC
95: I
NIT
IAL
SCO
UR
VEL
OC
ITY
FOR
D95
(ft/s
) =
1.14
LOC
AL
SCO
UR
DEP
TH (f
t), Y
s pie
r6.
6V i
C50
: IN
ITIA
L SC
OU
R V
ELO
CIT
Y FO
R D
50 (f
t/s)
=0.
61V R
: VEL
OC
ITY
RAT
IO (f
t/s)
=15
.53
FOO
TIN
G C
OM
PON
ENT
Yes
K4 =
1.00
Ben
t Num
ber
Pier
#4
V 2: V
ELO
CIT
Y (fp
s)8.
19N
ote:
If D
50 <
0.0
07 ft
or D
95 <
0.0
66 ft
, the
n K
4=1
Y 2: D
EPTH
(ft)
26.5
0AT
TAC
K AN
GLE
, Deg
rees
0h o
pc: P
RE-
SCO
UR
PIL
E C
AP B
OTT
OM
HEI
GH
T AB
OVE
BED
(ft)
-6.0
0D
50 (f
t)0.
0006
Ks (f
t)0.
0009
Ku c
ritic
al v
eloc
ity tr
ansp
ort c
oeffi
cien
t11
.17
Vc c
ritic
al tr
ansp
ort v
eloc
ity (f
ps)
1.63
Y f:
dist
ance
from
bed
to to
p of
foot
ing
(ft)
3.30
V f :
Aver
age
velo
city
in th
e flo
w z
one
abov
e th
e to
p of
foot
ing
(fps)
6.85
a pc:
PILE
CAP
WID
TH (f
t)16
.00
L pc:
PILE
CAP
LEN
GTH
(ft)
41.3
0T o
pc:
PILE
CAP
TH
ICKN
ESS
(ft)
6.00
CAP
SH
APE
(S=S
QU
ARE,
C =
CIR
CU
LAR
)S
Y 2m
ax =
3.5
*apc
(ft)
56.0
0K 1
: SH
APE
CO
EFFI
CIE
NT
1.10
K 2: A
NG
LE C
OEF
FIC
IEN
T1.
00K 3
: BED
CO
ND
. CO
EFFI
CIE
NT
1.10
K 4: B
ED A
MO
RIN
G C
OEF
FIC
IEN
T1.
00K w
: W
IDE
PIER
AD
JUST
MEN
T FA
CTO
R1.
00FR
OU
DE
NU
MBE
R, F
r0.
28LO
CA
L SC
OU
R D
EPTH
(ft),
Ysf
c12
.9
TOTA
L SC
OU
R D
EPTH
= Y
spie
r + Y
sfc
19.5
Cal
c. B
y:D
WC
Dat
e:5/
10/2
010
Che
ck B
y:SV
ED
ate:
5/10
/201
0
Silty
san
d-gr
avel
bed
5/10
/201
0 P
age
2 of
2A
ttach
men
t M