Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge...

28
SCOUR

Transcript of Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge...

Page 1: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

SCOUR

Page 2: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Babbling Brook

Page 3: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Just Add Water

Page 4: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Definition of Scour

Scour: Loss of material under a bridge’s foundation

Page 5: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Local Scour at Pier

Page 6: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Pier Scour

Page 7: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Bridge Failure Statistics

Bridge Failure Database by Mike Sullivan NYSDOT

Page 8: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Bridge and Culvert Failures

in Maine

due to Scour

Page 9: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Carrabassett Valley, Brackett Brook Bridge #5347

Hurricane Irene - August 28, 2011

Page 10: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Carrabassett Valley, North Branch Bridge #5346

Hurricane Irene August 28, 2011

Page 11: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Moro Plantation, Tucker Br. #5027

May 1, 2008

8 inch drop at pier

Page 12: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Moro Plantation, Tucker Bridge

Looking upstream

Page 13: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

York, Passaconway Br. # 5176

May 14, 2006 (Mother’s Day Flood)

BEFORE FLOOD AFTER FLOOD

(15 inches of rain in 36 hours)

Page 14: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Ogunquit - Wells, Sherburne Br. #6122

May 14, 2006 (Mother’s Day Flood)

Page 15: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Freeport, Mast Landing Br. #5805

October 11, 1998

Page 16: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Farmington, Fairbanks Br.#2271

April 1, 1987 (April Fool’s Day)

Page 17: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Abbot, Page-Carr Br. #5725

1987

April 1, 1987 flood creates deep scour holes

under pier footings

Installed 1335 cy of riprap as emergency repair

Page 18: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

MaineDOT Maintenance

Grout bag repairs

1987 to 2011

83 undermined bridges repaired

21 using Private Contractors

62 by MDOT Dive Team Before

Under construction Completed

Page 19: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Winslow, Mile Brook Bridge

Pre Dam Removal

Page 20: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Fort Halifax Dam Removal (2008)

Winslow, Mile Brook

Page 21: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Scour Plans of Action (POA)

POA’s include the following:

When to start monitor a bridge during an event

When to close a bridge to traffic

Q10, Q25 or Q50 event

Or other trigger ( USGS gaging station)

When can a bridge can be reopened to traffic

How to reopen a bridge

Recommendations for scour countermeasures

Page 22: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Scour POA Implementation

Pavement cracking

behind bridge

Abutments rotated

Piers tilted

Slumping behind wings

Irregular or misaligned

bridge rail

Water and/or debris

against bridge

What Do I Look For?

Page 23: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Scour Warning Sign Red – Close Bridge

Yellow – Monitor Bridge

Page 24: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Scour Countermeasures

Page 25: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Scour Countermeasure Projects

Item 113 rating is changed from 3 or less to a rating of 7

Need properly design countermeasure

2012-2013 Work Plan 24 Projects

$3,800,000+/- Total Cost

Pre 2012 Prospect – Verona

Portland, Tukey’s Bridge

Waterville, I95 over Messalonskee Stream

Page 26: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Good Rip Rap

Page 27: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Scour Countermeasure Options

Partially Grouted Riprap

Articulate concrete block mat A Jacks

Concrete filled mattress

Page 28: Scour · Scour Plans of Action (POA) POA’s include the following: When to start monitor a bridge during an event When to close a bridge to traffic

Questions/Comments