Interoperable Portal Services Marlon Pierce Community Grids Lab Indiana University.
Magnet Lab User Portal August 2010.
-
Upload
hector-fox -
Category
Documents
-
view
217 -
download
0
Transcript of Magnet Lab User Portal August 2010.
![Page 1: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/1.jpg)
Magnet Lab User Portal
https://users.magnet.fsu.edu/
August 2010
![Page 2: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/2.jpg)
User Proposal Portal
Proposal: Science/Technology Description Demographics CV/Resume Funding Sources ‘Excluded Reviewer’ List
Assignment of Magnet Time - Link to Reviews
- Link to User Program Head - Link to Site-Specific Training
- Request for Feedback
Links to all User Program Policies
Labwide Proposal Review and Demographics Database
Experiment 1: User Program Specific Experiment Description Magnet Time Request
Denial of Magnet Time - Link to Reviews - Link to User Program Head - Link to Appeals Process - Information/Advice on Resubmission - Request for Feedback (Process clear ?, Rationale clear ?)
Web-based Review - Two External Reviewers - Internal Staff Scientists
A single proposal can support multiple experiments. The number of experiments and period of time over which a proposal remains in effect will be determined by each individual user program.
External reviewers will only have access to the proposal submission, not the description of a specific experiment. In particular, information such as details about a proprietary experimental technique will not be made available to external reviewers.
If external review(s) are late…
If users are new users…
…the MagLab may award magnet time based on internal reviews alone…
…and require the User Committee to provide external review of the proposal at its next meeting.
Annual User Committee meeting will assume additional responsibility of ensuring external review of every proposal.
If user requests Rapid Access permission from the MagLab director (or designee), then experiments will be considered for provision of magnet time until the next batch proposal call or annual User Committee meeting provides an opportunity for a formal review of the proposal.
Decision on Magnet Time - Internal Technical Experts - Specific to User Program - Specific to Experiment
![Page 3: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/3.jpg)
August 2010
NHMFLHome Page:
magnet.fsu.edu
![Page 4: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/4.jpg)
Unified User Portal users.magnet.fsu.edu
• One policy governs all 7 user programs
• One point of entry for all users
![Page 5: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/5.jpg)
![Page 6: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/6.jpg)
Submitter view – Getting Started: People info
Demographics
Discipline
User Type
![Page 7: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/7.jpg)
Proposal Submission, Management & Review Processes~~ Implementing Good Practice and Policies ~~
Submitter view – Getting Started: Proposal informationProposals are externally reviewed!
![Page 8: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/8.jpg)
Submitter view: Proposal “Home Page”. “Actions” & info collected uniform across all 7 user programs
Proposal File:• 1-3 page describing Scientific or Technical development including broader impacts.
• 1 page description of prior relevant work• 2 page biographical sketch
![Page 9: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/9.jpg)
Submitter view: Experiment “Home Page” “Actions” are standard; follow-on questions & data collected are tailored to operational needs of each facility
![Page 10: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/10.jpg)
Submitter view (Experiment) – Magnet systems for Pulsed Field Facility
![Page 11: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/11.jpg)
Submitter view (Experiment) – Sample and safety info for Pulsed FieldFacility
![Page 12: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/12.jpg)
Submitter view (Experiment) – Scheduling for Pulsed Field Facility
![Page 13: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/13.jpg)
Submitter view (Proposal & Experiment ) – “Review & Submit” Same for all facilities
![Page 14: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/14.jpg)
Facility Manager view
![Page 15: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/15.jpg)
Facility Manager view:
Each Facility has its own standing User Proposal Review Committee (UPRC)
According to User Policy: minimum 7 members; more external members than internal
![Page 16: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/16.jpg)
Reviewer view
![Page 17: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/17.jpg)
Many management reports already online
![Page 18: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/18.jpg)
Each user facility reviews, ranks, schedules and
manages its own time according to
established protocols.
Common reporting, user feedback and
surveys, and publication records
NEW ONLINE USER PROGRAM MODULE:Unified User Access, Proposal Handling,
Feedback and Reporting
![Page 19: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/19.jpg)
System Managers &
User Proposal Review Committee (UPRC)
Members(confidential)
![Page 20: Magnet Lab User Portal August 2010.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649e7b5503460f94b7be07/html5/thumbnails/20.jpg)
System Managers&
User Proposal Review Committee (UPRC)
Members(confidential)
continued