COMMISSION BRIEFING SLIDES/EXHIBITS

BRIEFING ON DIGITAL INSTRUMENTATION AND CONTROL

JULY 18, 2007

Page 2: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

I

Digital I&C- Industry Per

July 18, 2O

Amir Shahkarami

Sr. VP Engineering,& Technical SehExelon Corporation.

N U C l E A R

I N S T IR T ( U T

I

Page 3: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Topics

* Objective

* Communication

* Project Plan

~*C••onclusions

2

Page 4: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Objective

* Safety-focused application of digital technology

Design certification

- Current operating plants

- New plants

S facilities

-Stable, predictable and timely licensing process

aguianceEnrc aTety availability and reliability

3

Page 5: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Communication

* NEI Digital I&C and Human Factors

Working Group

- Reports to industry Chief Nuclear Officers

-Participate on the Digital I&C Steering Committee

- Coordinate with NEI New Plant Working Group

aj-r•vendor participation

ntfecrated, focused attention to ensure safety-

f se tabe and predictable licensing process

4

Page 6: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Project Plan

* Disciplined Framework

- Issue scope and definition

- Deliverables

- Milestones

-Accountability

tegr~ate d approaches to resolution

jdiidne~n~ta'I tool for management oversight

5

Page 7: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Conclusions

* Progress has been made

* Project plan provides a framework going

forward- Integrate lessons learned and other improvements

* ~tntairin focused management attention

kui?1A, th e lonrer term

1

6

Page 8: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

ELECTRIC POWERRESEARCH INSTITUTE

Digital Instrumentation &Control - EPRI Role

July 18, 2007

Chuck. WeltyTechnical Executive

Electric Power Research Institute

Page 9: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

AcronymsEPRII&CR&DMCRPRAHFEANTSERPLCASICFPGACCF

- Electric Power Research Institute- instrumentation and control- research and development- main control room- probabilistic risk assessment- human factors engineering- advanced nuclear technology- safety evaluation report- programmable logic controller- application specific integrated circuit- field programmable gate array- common-cause failure

n.lrhrsvLECTRIC POWER

c. All rights reserved. 2 II S*ARCHI4NSTITUTE© 2007 Electric Power Research Institute, In

Page 10: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

EPRI Digital I&C R&D

*Substantial past/ongoing activities.on digital I&C,MCR, risk and human factors

° Guided by extensive utility advisory structure- Expertise - I&C, PRA, HFE and ANT

° Several products with SERs* Basis for industry technical positions*Areas of information exchange and interactionwith NRC

EPRI has substantial, expertise and proven capabilities•....... ....... ...... • I

'RESCTRIC POWERer2ii RI MARCH INSTITUTE

© 2007 Electric Power Research Institute, Inc, All rights reserved. 3

Page 11: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

EPRI R&D on Digital I&C

* Licensing digital upgrades* Verification & validation* Electromagnetic interference

° Commercial devices - PLCs,ASICs, FPGAs, wireless, etc.

" Control room/human factors" Defense-in-depth and diversity" Applying risk methods

1111

992-2004

992-1998992-993-

2001-2002-2002-

ELECTRIC POWERRESEARC INTTT© 2007 Electric Power Research Institute, Inc. All rights reserved.

Page 12: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Current EPRI Support

" Defense-in-depth and ,diversity

-Use design and diversity for CCF protection

" Risk-informed methods

Existing methods provide insights to focusdesign and review efforts

• Human factors

- Bases for minimum inventory of interfaces,computerized procedures, graded HFE designapproach

* Ongoing evaluation of operating experience

© 2007 Electric Power Research Institute, Inc..All rights reserved. 5 RESEARCH NI s U

Page 13: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Future EPRI Activities

* Interaction with NRC Research has not been asextensive as it could be - we want to helpimprove this

* Interim Staff Guidance documents are only astart - our advisors expect us to continue to workwith NRC to resolve the issues completely

2007 Electric Power Research Institute, Inc. All rights reserved. RESEARCH INSTITUTE

Page 14: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

invensys. I-

Process Systems

Digital Modernization Hurdlesand Solutions

7- 18-07

Ken Brown

Vice President Invensys

1

Page 15: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

NkREG(1 -

nvensysoProcess Systems C-2

About InvensysInvensys'PLC- 30,000 employees, in 60countries

-I nvensys. Process Systems (IPS)Comprised of Foxboro, Triconex,Wonderware, Simsci-Esscor, Avantis,Validation Technologies

• IPS is presently providing input to theindustry -working groups and the NRC

2

Page 16: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

,nvensys®Process Systems

,ýNkREG~j

4, 0

Digital Instrumentation and ControlIssues in the Nuclear Industry

e Diversity, Defense in Depth - D3

* Risk Informed Digital I&C

" -Operator Training

* Cyber Security

* Lessons Learned from other Industries

3

Page 17: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

NcFt,•1 REGjj,

nvensys r tProcess Systems Co.

Diversity, Defense in Depth" IPS - install a highly available, highly

reliable Triple Modular Redundant (TMR)controller for Reactor Protection andESFAS with a diverse digital controller I/Aseries

" Use technology to solve this issue- notchallenge the license base or operationposition

4

Page 18: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

inverProcess Sy

r,,\P REGQ•

isys®•fstems 0

Diversity, Defense. in Depth" Invensys and our customers need a

workable and understandable position onissues of concern - causing. confusion anddelays

" Common Cause Failure - extensivediagnostics and a highly developedplatform substantially reduce this risk

5

Page 19: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

t' 1REG&4

invensAys..Process Systems C

Risk Informed Digital I&C" Consultative teaming relationship" TMR technology - deployed on safety,

mission critical, and life critical systems* This technology currently supports High

Probabilistic Reliability Analysis numbers* Need to evaluate and take credit for

.methodologies used in other countries andindustries

6

Page 20: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

NtREGI/ -,

!nvensys ,5o

Process Systems 00

Operator Training

° TMR, Fault Tolerant, High Diagnosticsystems allow for minimal training forOperations

* Can be used on Important To Safety andSafety Related applications minimizingtraining

7

Page 21: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

invensys®Process Systems ~"p' SIV0

Cyber Security

* Invensys is committed to industry leadingcyber security initiatives

* Utilize Wurldtech Securities AchillesLevel 1 assessment testSecurity benchmark

as Cyber

8

Page 22: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

* Nft RE04/4

'4,o

Invensys®• •Process Systems

Lessons Learned from otherIndustries

e Triconex is by far the most trusted safety systemin the continuous process industries

9 Make obsolescence "Obsolete* Provide Digital Commercial Off The Shelf

Technology (COTS) Solutions under a I OCFRAppendix B program

* IPS safety platform meets safety criteria forHydro Carbon Industry and Rail SignalingIndustry

9

Page 23: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

ý,pkREGU4

invensys®Process Systems

Conclusion* We are pleased with the progress being

made by the recent working groups* Facilitate technology transfer from other

Mission Critical / High Reliability industries

* Staff should continue to developconsultative relationships with keytechnology providers

10

Page 24: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

_\v,ýV REG&j4

nvensys °Process Systems -

Conclusion* IPS encourages the staff to engage I&C

design early in COL phase for new builds

* IPS is committed to the industry, to helpresolve I&C issues, on existing and newplant designs to accelerate therenaissance of nuclear power

11

Page 25: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

API 000

Digital Instrumentation and

Control

July 18, 2007Cynthia McGinnis

Westinghouse Electric Company*GWestinghouseAPIOOO

1

Page 26: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

AP1000 DesignCertification Finality* Functional Design* Applicable codes and

standards-* Basic architecture* Diversity/Defense-in-

Depth

* Minimum Inventory" Diverse Actuation

Functions* Design Acceptance

Criteria

2

Page 27: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

APIO00 I&C Design andLicensing Efforts* Plant Simplicity Drives I&C SafetySystem Simplicity-One-time component actuation

* Common Q Platform*"Simple" digital I&C

implementation" Technical Reports* Existing requirements and

Guidance remain applicable

3

Page 28: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Fundamentals the Same asOperating Plants

* Functional Basis Simplistic andTransparent

* Architecture Basis- Divisional Independence- Safety/Non-Safety Separation

Isolation* Communications and Architecturedriven from operating plant design and

experience* Analog to Digital Implementation does

not impact Fundamental Philosophy

4

Page 29: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

AP1000 I&C Evolutions •ooo

* Diverse Actuation FunctionsFunctionality resolved in DesignCertificationSeparate sensors/actuators from,those used by the Safety'SystemNew Plant (clean sheet) flexibilities

" Priority for safety system actuation* Cyber Security Issues

API000 Technical ReportConsistent with NEI-04-04

5

Page 30: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

APIOOO Licensing Efforts

* Design Certification resolved many I&Cissues for the APIOOO Design

* Technical Reports/DCD Revision 16 toresolve I&C DAC

* NRC interactions to establish sufficientinformation for reasonable assurance

* Simplistic digital I&C application resultsin acceptable use of existing regulatoryrequirements and guidance

6

Page 31: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

AP1 000 Licensing Efforts

" Development of Cyber Security PlanTR is developed and submittedContinued work with Industry andStaff to resolve the issues/concerns

- Consistent with NEI-04-04" Westinghouse-proposed schedule for

resolution by Spring 2008

7

Page 32: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Conclusions/Comments9 Design Certification resolved many I&C issues

for API 000* Existing NRC regulatory requirements and

guidance sufficient to evaluate AP1000 I&Csafety. system

" Licensing basis for I&C in the designcertification rule

" Propose to resolve I&C DAC in DCDamendment currently under NRC staff review

* Result in elimination of the DAC from theAP1000 Design Certification Rule uponsuccessful NRC reasonable assuranceconclusion

e Operating plant upgrade issues different

8

Page 33: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

U

DIGITAL I&C

Grid Operations

July 1 8 th 2007Tom Bowe

PJM Interconnectionbowet@pjm .,c,om

Page 34: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

pAPjm PJM's MISSION

* Maintain the safety, adequacy,reliability and security of the bulkpower system

" Create and operate a robust,competitive, and non-discriminatoryelectric power market

• Ensure that no Member or groupof Members has undue influence

RTO = Regional Transmission Operator

2

Page 35: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

PJM's Area of Operations

V I1 '7

PJM RTO (Post-intearatlons)

Generating UnitsGeneration CapacityPeak LoadAnnual EnergyTransmission MilesArea (Square Miles)CustomersPopulation ServedStates (+ D.C.)

1,400170,807 MW144,000 MW648,000 GWh55,000186,00021 Million50+ Million13 states + D.C.

I

r w - ~f

/

/

PJrM 66m flde. t;J©2003 PJM3v

Page 36: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Generation Svstem Operator

4

Page 37: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

I Transmission System Operations

5@2003 PJM

Page 38: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

*pJ m Back-Up Capability

* We Must Maintain Situational Awareness& a Wide Area View- Y2K- September 11 th 2001-August 14th 2003

* PJM exists on its data streams- Multiple and Diverse Communication Paths

* Digital I&C Provides for Greater Visibilityand Flexibility

* Creative Training

6

Page 39: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

9pj*,lj m1 Cyber Security

9 Starts with Defining - "What is Critical?"

9 If everything is critical than nothing is a 0

" Must also define the "Electronic Perimeter"- Defense in Depth

- Network Segmentation

" Conduct Independent VulnerabilityAssessments

" NERC Critical Infrastructure ProtectionStandards (CIP 002-009) and/or ISO 17799

7

Page 40: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

44pjmII PJM's Advanced Control Center Concepts

" Visualization with a focus on human factorsand role vs. function based displays

" The evolution of intelligent event processingand intelligent agents

" Improvements in control through advancedalgorithms, improved visualization, advancedlook ahead, modeling of heuristics.

" Synchronized control centers for rapidrecovery

8

Page 41: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

COMPUTING SUBSYSTEMS(Safety and Reliability Challenges)

July 18, 2007

Homayoon Dezfuli, Ph.D.,Manager, System Safety

Office of Safety. and Mission AssuranceNASA Headquarters

Page 42: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Role of Computing Subsystems -I

Perform safety-critical and mission-criticalfunctions- Power management- Telemetry

Data and information handlingCommunicationHardware'automation and control

* Have contributed to several spacecraftaccidents- Software data specification errors- Software design specification errors

2

Page 43: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

'd

What is NASA Doing? U

* Improving system engineering (SE)processes to better handlehardware/software, software/human andsoftware/software interfaces and designtrade studies

" Improving software assurance processes

" Exploring the applicability of riskassessment techniques to risk-inform the SEand software assurance processes

3

Page 44: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

01

Challenges for Risk-informingSoftware Safety

" Need: Ability to predict (or bound) with agiven level of. confidence the likelihood ofmission failure due to latent softwaredefects to support

- Risk management decisions (e.g., designing SWtesting regimes for risk significantconfigurations)Risk acceptability decisions (e.g., showing that aprobabilistic safety criterion is being met)

" Based on results to-date, it appears that acombination of techniques is needed tosatisfy this need

4

Page 45: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

.• I . I

Exploratory Ideas

Risk management decisions- Application of scenario-based accident modeling

techniques to identify system-critical configurations, flightmode changes, and flight transients

- Risk-informed testing regimes

* Risk acceptability decisions- Assignment of initial reliability levels (ranges) based on

* attributes such as design complexity, and SW quality V&Vprocess considerations (risk classification of softwareelements)

- Adjustment of reliability levels based on V&V and risk-informed test process findings (updating of initial reliabilitylevels)

* Continue focused research- Beneficial to work with NRC

15

Page 46: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

UNITED STATES NUCLEAR REGULATORY COMMISSION

Protecting People and the Environment

Briefing on Digital Instrumentationand Controls

Update on New ReactorsUpdate on Digital Research Platform

July 18, 2007Luis Reyes

Executive Director for Operations

Page 47: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Acronyms

ABWRACRSAPWRBWRCOLD3DCDOEEISEPREPREPUESPESBWRFPGAFPLFYGDCI&CINPOITLLTF

Advanced Boiling Water ReactorAdvisory Committee on Reactor SafeguardsAdvanced Pressurized Water ReactorBoiling Water ReactorCombined LicenseDiversity and Defense-in-DepthDesign CertificationDepartment of EnergyEnvironmental Impact StatementEvolutionary Power ReactorEvolutionary Power ReactorExtended Power UprateEarly Site PermitEconomic Simplified Boiling Water ReactorField-Programmable Gate ArrayFlorida Power & Light CompanyFiscal YearGeneral Design CriteriaInstrumentation and ControlInstitute for Nuclear Power OperationsInformation TechnologyLessons Learned Task Force

NFPANMSSNRCNRONRRNSIRNUREGOGCPRAPWRRAIRESRGRISSRMSRPSWPTVATXUSERSGITWG

National Fire Protection AssociationOffice of Nuclear Material Safety and SafeguardsNuclear Regulatory CommissionOffice of New ReactorsOffice of Nuclear Reactor RegulationOffice of Nuclear Security and Incident Responsetechnical report (Nuclear Regulatory Commission)Office of General CounselProbabilistic Risk AssessmentPressurized Water ReactorRequest for Additional InformationOffice of Nuclear Regulatory ResearchRegulatory GuideRegulatory Issue SummaryStaff Requirements MemorandumStandard Review PlanStrategic Workforce PlanningTennessee Valley AuthorityTexas Utilities Energy CorporationSafety Evaluation ReportSafeguards InformationTask Working Group

2

Page 48: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Agenda

IntroductionReadiness for New Reactors

Digital I&C Research Platform

Digital I&C Steering Committee

Diversity and Defense-in-Depth

Highly-Integrated Control Room

Digital Risk Assessment

L. Reyes

W. BorchardtR. CroteauJ. GrobeM. MayfieldM. CunninghamM. Cunningham

3

Page 49: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

~U.S.NRCUNITED STATES NUCLEAR REGULATORY COMMISSION

Protecting People and the Environment

Readiness for NewReactors

William BorchardtOffice of New Reactors

Page 50: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

New Reactor Licensing ApplicationsAn estimated schedule by Fiscal Year

U Y I I I I

2005 12006 2007 2008 12009 2010 1 2011 2012 12013 12014 IU 4

APIOOO Fqrogram R~view- U I -,

I w I

LU~arb~>Dei-n I Prnrjrpq-,; Fnprnv - H:;rricz INM

FI 'Fer-~

* Schedules depicted forfuture activities representnominal assumed reviewdurations based on submittaltime frames in letters of intentfrom prospective applicants.Actual schedules will bedetermined when applicationsare docketed.

~EU , W~k....LL~.g.LiLi~ -

S.-

I Hearina>I + - 4,.I--.

ESBWR Rrogram R~viewI-

.U

iiI~Ir

ndGUý2SP~ HeaijIH-earibd:-

-n-I H~~rinnI Hearinuj

Legend:

OM .r - .

Hearin ost SEREISHearing (other hear ng activitiesoccur during ESPIC )L safetyande vironmental eviews)

III

EPR Program Revi w F

- ~ .. -

Hear[oq,ý*,'>

rJea

HeaEl! r7---- I-.-

4 4 4- 4-I t"I

IABWR Poogram Reiew UI LLLW- II

4 I 1- 4 4 .- 1-I

USAPWF Program Review

I I

U nspeci~ied M H~a~Hearia I 625/0

7FHearing 6/25/07

Page 51: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

New Reactor Infrastructure

e Approved Rulemakings: Part 52and Limited Work Authorizations

* Finalized Regulatory Guide 1.206"Combined License Applicationsfor Nuclear Power Plants"

6

Page 52: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

New Reactor Infrastructure

* Completed final wave of stafftransfers from NRR

• Populating Licensing ProgramPlan

* Developed Combined Licenseapplication acceptance reviewguidance

7

Page 53: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Pre-application Activities

" Pre-Combined License interactionsand site visits, and applicationreadiness assessment visits

" Public outreach* Design Centered Working Group

meetings* International interactions" Orders imposing safeguards

information protection requirements

8

Page 54: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

US.N NRCUNITED STATES NUCLEAR REGULATORY COMMISSION

Protecting People and the Environment

Research Platform

Rick CroteauOffice of Nuclear Regulatory Research

Page 55: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Test Facility

" Develop a defined set of concepts- Input from interested stakeholders

Investigating other similar facilities" Conduct a public workshop

- September 6 & 7 - technical issues- September 11 - non-technical issues

i Prepare Commission paper- Results of workshop- Recommendations on path forward

10.

Page 56: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

UNITED STATES NUCLEAR REGULATORY COMMISSION

Protecting People and the Environment

Digital Instrumentationand Controls Steering

Committee

Jack GrobeOffice of Nuclear Reactor Regulation

Page 57: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Background

• November 8, 2006, Commissionbriefing

* December 6, 2006, StaffRequirements Memorandum

• January 12, 2007, memorandumestablished the Digital I&CSteering Committee

12

Page 58: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Key Challenges

* Assuring predictability throughrefined Regulatory Guidance

* Anticipating future needs

- Evolving technology

- Industry priorities

* Improving stakeholder interactions

* Expanding domestic andinternational interactions

13

Page 59: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Digital l&CFuture Workload

* Operating reactor modifications" Design Certification* Combined License" Fuel-cycle facilities

14

Page 60: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Steering Committee

[NRC Line Organizations

4" - " Industry Contacts

rnteractiort with NRC Line Organtzations

Public Interaction with Industry Contacts

15

Page 61: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Structure of Project Plan

" Defined problem statements undereach Task Working Group( Developrn Interim. Staff Guidance.(near-'term)

" Interactive effort with industry* Revise Regulatory Guides and

industry standards (long-term)

16

Page 62: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Stakeholder Interactions

• Conducted 30ipublic meetings withthe industry since November 2006-5 Public Steering Committee

meetings-25 Public Task Working Group

meetings* ACRS interactions* Expanded domestic and

international interactions

17

Page 63: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

~U.S.NRCi UNITED STDATES NUCLEAR REGULATORY COMMISSION

Protecting People and the Environment

Diversity andDefense-i'n-Depth

Michael MayfieldOffice of New Reactors

Page 64: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Diversity and Defense-in-Depth

• Common-cause failures arecredible

* Current guidance has beensuccessfully used

* Staff is working to improveexisting guidance

19

Page 65: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Diversity and Defense-in-Depth

* Seven key issues being addressed:- Adequate diversity- Operator action- Component vs. system level

actuation- Effects of common-cause failures-Common cause failure applicability- Echelons of defense- Single failure

20

Page 66: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Diversity and Defense-in-Depth

* Development of Interim StaffGuidance is well underway-Acceptable diversity and

defense-in-depth criteria-Criteria on remaining issues

under internal review

21

Page 67: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Diversity and Defense-in-Depth

• Path forward

- Issuance of Interim StaffGuidance

-Continued interaction withindustry

-Update Regulatory Guides andStandard Review Plan

22

Page 68: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

S~U.S.NRC.UNITED STATES NUCLEAR REGULATORY COMMISSION

Protecting People and the Environment

Highly Integrated ControlRoom -- Com unications and

Risk Assessment

Mark CunninghamOffice of Nuclear Reactor Regulation

Page 69: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Highly-Integrated ControlRoom Communications

" Communications issues- Between safety divisions- Between safety, and nonsafety

equipment" Staff is working to improve

guidance

24

Page 70: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Highly-Integrated ControlRoom--Communications

• Four key technical areas

- Inter-divisional communications

- Command prioritization

- Multi-divisional control/displaystations

- Network configuration

25

Page 71: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Highly-Integrated ControlRoom--,Co mmunications

• Improved guidance on schedule

- Inter-divisional communications

- Command prioritization

26

Page 72: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Highly-Integrated ControlRoo m--Commun ications

* Continuing interactions- Multi-divisional workstations

* Non-safety workstations forsafety indication and control

- Network configuration

27

Page 73: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Highly-Integrated ControlRoom--Communications

• Path forward

-Issuance of Interim StaffGuidance

-Continued public interaction withindustry

-Update Regulatory Guides andStandard Review Plan

28

Page 74: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Digital Risk Assessment

* Expanding Use

-Risk insights in designcertifications

- Risk-informing regulatorypractices

* Staff is working to developguidance

29

Page 75: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Digital Risk Assessment

* Risk insights- Information sources

* Industry white papers*NRC research* Operating experience

* Path forward-'Continued public interactions

with industry- Develop Interim Staff Guidance

30

Page 76: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Digital Risk Assessment

* Risk-informing regulatorypractices

- State of technology

-Path Forward

- Continued public interactionswith industry

- Develop guidance

31

Page 77: M070718B - Commission Briefing Slides/Exhibits, Briefing ... · Wonderware, Simsci-Esscor, Avantis, Validation Technologies • IPS is presently providing input to the ... " IPS -install

Summary

* Steering committee is fueffectively

* Project plan is in place" Interim Staff Guidance is

developed" Stakeholder interactions" Strong industry support" Staff is on'schedule to c

near-term deliverables

nctioning

being

)mplete

32