M. statment lines cable instal & testing

45
TP M 1. Sa M Pr P/TCD/QP06 M Method s . 132kV afety Aspe Safety Tools All eq The c requir First A Ensur Ensur Safety Machine/ M 5 Ton Drum Manu Roller Nylon Comm re require 1. Appro 2. Area, 3. Ensur 4. Suffic 5. Ensur 6. Ensur 7. Single 8. Ensur 9. Ensur 6/CAB/MS ethod s tatemen V Cable P ects y officer sha box talk wi quipment / m cable drum red wherev Aid box sha re sufficient re sufficient y measures Materials Winch Ma m Lifting Jack ufacturer ap rs such as, B n rope. munication ements & oved cable P where the re detailed m cient capacit re cleanlines re that 10cm e rollers will re proper be re all rollers stateme nt for 132 Pulling W all be availa ill be perfor machineries ms / cable r ver the cable ll be availab t drinking w t trained ma & PPE for p to be use chine with s k & accesso pproved Lub Bend Roller, Instrument Cable Pul Pulling Tens cable drum manufactur ty, lifting Cr ss and tidin m Sand bed l be placed end roller / s are free fro 01 ent for 1 2kV cabl Works able accordi rmed before s need to b route area e route is n ble at site water shall b anpower sh peoples to b ed: sling length ries. bricant. , Bell Mouth ts (WalkieT lling Proce sion calcula ms to be plac rer name pl rane shall b ness in the e ding will be at 2M inter V rollers w om rust & c 132kV ca e Installa ing to critica e starting an e calibrated shall be b ear to the r be provided hall be used be checked h of 950 to 1 h, Special ty Talkie & Wir edure: ation shall b ced, shall be ate is availa e available entire cable e done for th rval through ill be placed corrosion. able Ins ation al site cond ny activity. d. barricaded road. during wor . by safety o 1000 Meter ype Step ro red telepho be available e leveled an able on the at site to lif route. hat section. hout the sec d at require stallatio ition / DEW and Road rk to preven officer. rs. llers, V rolle nes) at site. nd compact cable drum ft cable dru . ction for th ed locations on & Tes WA witness r Barrier (Tra nt dehydrat ers & Pulley ted. m. ms. e straight li s. sting requiremen affic cones tion. ys. ne. nt. ) are Page 1 of 57

Transcript of M. statment lines cable instal & testing

Page 1: M. statment lines   cable instal & testing

TP

M1.

Sa

M

Pr

P/TCD/QP‐06

M

Method s. 132kV

afety Aspe Safety

Tools

All eq

The crequir

First A

Ensur

Ensur

Safety

Machine/ M 5 Ton

Drum

Manu

Roller

Nylon

Comm

re require1. Appro

2. Area,

3. Ensur

4. Suffic

5. Ensur

6. Ensur

7. Single

8. Ensur

9. Ensur

6/CAB/MS ‐

ethod s

tatemenV Cable P

ects y officer sha

box talk wi

quipment / m

cable drumred wherev

Aid box sha

re sufficient

re sufficient

y measures

Materials Winch Ma

m Lifting Jack

ufacturer ap

rs such as, B

n rope.

munication

ements & oved cable P

where the

re detailed m

cient capacit

re cleanlines

re that 10cm

e rollers will

re proper be

re all rollers

stateme

nt for 132Pulling W

all be availa

ill be perfor

machineries

ms / cable rver the cable

ll be availab

t drinking w

t trained ma

& PPE for p

to be usechine with s

k & accesso

pproved Lub

Bend Roller,

Instrument

Cable PulPulling Tens

cable drum

manufactur

ty, lifting Cr

ss and tidin

m Sand bed

l be placed

end roller /

s are free fro

01

ent for 1

2kV cablWorks

able accordi

rmed before

s need to b

route area e route is n

ble at site

water shall b

anpower sh

peoples to b

ed: sling length

ries.

bricant.

, Bell Mouth

ts (Walkie‐T

lling Procesion calcula

ms to be plac

rer name pl

rane shall b

ness in the e

ding will be

at 2M inter

V rollers w

om rust & c

132kV ca

le Installa

ing to critica

e starting an

e calibrated

shall be bear to the r

be provided

hall be used

be checked

h of 950 to 1

h, Special ty

Talkie & Wir

edure: ation shall b

ced, shall be

ate is availa

e available

entire cable

e done for th

rval through

ill be placed

corrosion.

able Ins

ation

al site cond

ny activity.

d.

barricaded road.

during wor

.

by safety o

1000 Meter

ype Step ro

red telepho

be available

e leveled an

able on the

at site to lif

route.

hat section.

hout the sec

d at require

stallatio

ition / DEW

and Road

rk to preven

officer.

rs.

llers, V rolle

nes)

at site.

nd compact

cable drum

ft cable dru

.

ction for th

ed locations

on & Tes

WA witness r

Barrier (Tra

nt dehydrat

ers & Pulley

ted.

m.

ms.

e straight li

s.

sting

requiremen

affic cones

tion.

ys.

ne.

nt.

) are

Page 1 of 57

Page 2: M. statment lines   cable instal & testing

TPP/TCD/QP‐06

10. Ensurcalcul

11. Ensu12. Ensur13. Ensur14. The ca15. The ca16. Visua17. Ensur

18. Ensur

19. Ensur

20. Cable21. Manu22. Ensur23. Cable24. Exper25. Cable26. Pullin

27. Cable

28. Ensur29. Prope

30. Cablephase

31. After

32. Cable

33. The se

34. After

35. Ensur

36. CableConfir

37. For seearth

38. IR tes39. After

6/CAB/MS ‐

re that the clation.

re that Toore that DEWre TCD instaable drumsable drumsl Check to cre pulling en

re cable leng

re the end c

e Sheath heaual Brake Syre that Maxe pulling tenrienced stafe lubricant (g eye and w

e pulling end

re that cableer communi

e pulling to e third or as

completion

e at Duct en

econd grou

Completion

re that cable

e Phase & rmation cheection withing diagramst to be condIR test the

0

cable drum

l Box Talk wWA’s TED civallation stag to be place to be openconfirm thatnd of the ca

gth is suffic

caps sealing

althiness toystem will bimum cablension to be mff shall be dePoly water)winch M/c s

d to be brin

e pulling wiication thro

be performs per approv

n of 1st grou

try & exit sh

p / set cabl

n of cable la

e both ends

Group idenecklist. h single poim. ducted aftesection sha

01

and Winch

will be condvil stage chege checklist ed accordinned in preset there is noable is fixed

cient as per

g are intact t

o be ensurede used to coe pulling tenmonitored /eputed for ) will be usesling to be c

g down thr

ll start slowough Walkie

med in sequeved pulling

up / set cabl

hall be posi

e pulling to

aying, cable

s are cut & s

ntification s

int Bonding

er FO cable ll be releas

h M/c are p

ucted beforeck list is cleto be carrieg to the puence of Mano damages with pullin

approved b

to prevent f

d by conducontrol the dnsion / spee/ recorded all duct ented, where thconnected t

ough step r

wly at specife‐Talkie or f

ence such asequence (

les all cable

tioned in th

o be carried

e to be tied a

sealed with

shall be m

g system EC

laying (if aned for soft s

laced at rig

re cable puleared. ed out and clling directinufacturer /or abnormag eye.

bonding sys

from water

cting DRUMdrum rotatied limits arethroughouttry & exit pohe cable enthrough swi

rollers up to

fied speed.flags availab

as Yellow pin Trefoil fo

es to be brin

he center (n

out same a

at the inter

h End Cap an

arked over

CC cable to

ny). sand filling.

ght position

lling at site.

cleared. on. / DEWA Engalities in the

tem & leng

r ingress.

M TEST as peon while pue set into Wt the pullingoints. ntry in to duvel.

o ground lev

ble througho

hase first, Bormation).

ng in the fin

not resting a

as above.

rval of 1.2M

nd cover wi

r the cable

o be laid a

as per app

.

gineer. e cable drum

th embossi

er DEWA prulling. Winch M/c. g.

ucts

vel by manu

out pulling

Blue phase

al position.

at the botto

M.

th heat shr

at both e

s per appr

roved draw

m.

ng mark.

rocedures.

ually.

duration.

second and

om of the du

inkable slee

ends as per

oved Schem

wing /

d Red

uct)

eve.

r Bay

matic

Page 2 of 57

Page 3: M. statment lines   cable instal & testing

TP

2.

Sa

Pr

P/TCD/QP‐06

. 132kV

afety Aspe Safety

Tools

All eq

The Jo

First A

Ensur

Ensur

Fire e QHSE Safety

re require1. Sheat

repor2. HVDC3. Group

appro4. Clean5. Powe6. All joi7. DEWA

displa8. Fitting9. Bondi10. The a

with b11. Insure

length12. Insure13. Insure

make14. DEWA

6/CAB/MS ‐

V Cable Jo

ects y officer sha

box talk wi

quipment / m

oint bay are

Aid box sha

re sufficient

re sufficient

extinguisher checklist rey measures

ements: th healthinert to be avaiC test is comp & Phaseoved bay co, tidy, dust r to caravannting equipA approvedayed in the g Instructioing system pproval of tbonding cabe that the h. e that the joe that the c. A’s TED civil

ointing W

all be availa

ill be perfor

machineries

ea shall be b

ll be availab

t drinking w

t trained ma

r & fire blanequirement & PPE for p

ess to be enilable at sitempleted as p confirmatonfirmation proof and an shall be fepments, tood installationcaravan. n shall be ato be confirthe locationble inner / ocables are

oint bay troconfiguratio

l check list i

02

Works

able accordi

rmed before

s need to b

barricaded a

ble at site

water shall b

anpower sh

nket shall bet shall be copeoples to b

nsured by se). per DEWA aion (Throuchecklist. air conditioeed from a ols and apprn drawing,

available at rmed (Innern of the linkouter configlaid inside

ough height on of differe

is cleared an

ing to critica

e starting an

e calibrated

and Road B

be provided

hall be used

e provided iomplied. be checked

sheath test

approved mgh conduc

ned Joint bagenerator.roved jointeschematic

site as per Dr & Outer) pk box (if appguration. e the joint

is suitable fent makes o

nd TCD inst

al site cond

ny activity.

d.

arrier to be

during wor

.

n the joint

by safety o

as per DEW

ethod statector) will b

ay caravan

ers are availdiagram an

DEWA requprior to the plicable) to

bay trough

for the typeof cables is

tallation che

ition / DEW

e provided w

rk to preven

bay.

officer.

WA approve

ement for sbe ensured

will be plac

lable at sitend bay conf

uirement / Ijointing wobe available

hs in trefoi

e of joint thapproved a

ecklist to be

WA witness r

wherever ne

nt dehydrat

ed method

hut down joat joint b

ced.

e. firmation c

nstruction. orks. e at site an

l formation

at will be inand suitable

e carried ou

requiremen

ecessary.

tion.

statement

oints. bay with D

hecklist sha

d shall be in

n with suffi

nstalled. e with the j

ut and cleare

nt.

(Test

DEWA

all be

n line

cient

joints

ed.

Page 3 of 57

Page 4: M. statment lines   cable instal & testing

TP

In

P/TCD/QP‐06

nstallation Joints

proce Graph Conta Stage Serial Comp

manu Bondi Jointi

like joname

Remo Cable After

a) Joint

1. Jo2. Tr3. Li

bo4. Li

re5. Sh

DE6. Bo

bo

b) Straig

1. Th2. Tr

(O3. Bo

as4. Af

cr5. Co

re

Jointi

6/CAB/MS ‐

n Method:s will be iedure. hite removaact resistanc wise jointin numbers opound fillinufacturer pring cable wng identificoint make, e will be proove the conte length meacompound

Bay with Li

oint bay earrough covernk box will ox as per DEnk box enequirementshield break EWA approonding cabloth groups

ght through

he bonding rough coverOne or two tonding cabls per DEWAfter complerimped, labeomplete thequirements

ng area bac

:‐ nstalled by

al on the cace of the crng photograof stress cong to be doocedure. ill be dressecation feruljointer na

ovided. tainer and aasurementssettlement

ink Box.

thing systemrs to be placbe installedEWA approvnclosure to s. test will beved methodles phase idand enclosu

h Joint Bay.

cables to brs to be platroughs mae end will b

A approved etion of joeled and sehe trough s.

ck filling to

02

y DEWA a

ble will be eimped feruaphs to be tnes to be reone after p

ed up propees and Joinme, installa

all unwantes to be donet, back fill th

m to be ensced as per Dd as per theved methodbe backfi

e performed statemendentificationure labels to

e laid insideaced as per ax.) be preparedmethod staint shield baled propercover pla

be comple

pproved jo

ensured by le to be metaken for eaegistered foplacing the

erly and kepnts identification date,

ed material e along withhe joint bay

sured as peDEWA reque approval ad statemenilled with

d after cont. n ferules (Ro be provid

e the troughDEWA requ

d for shield atement. break test, rly. acement ov

ted and joi

ointer as p

using insulaeasured andach joint. r each phasjoints in a

pt protectedcation labelcontract n

from the joh DEWA wity up to trou

r DEWA reqirements. and bondint. sands up

nnecting the

YB), Inner aed as per D

hs in paralleuirements e

break test

inner and

ver the b

nt marker f

per DEWA

ation testerd recorded.

se to be suba proper h

d after coms containinnumber, Co

ointing locattness. gh cover lev

quirements.

g cables wi

to the ma

e bonding c

and outer feDEWA appro

el to the 13except abov

and shield

outer of t

onding cab

fixing as pe

approved

r.

bmitted for orizontal le

mpletion of jg the relevontractor na

tion.

vel with fine

.

ll be termin

arked level

cable in the

erules, link oved metho

2 kV cablesve the bond

break test t

the bondin

bles ends

r DEWA pro

manufactu

DEWA. evel and as

ointing. vant informame and c

e dune sand

nated at the

as per D

e link box a

boxes labeod statemen

. ding cables

to be condu

ng cable wi

as per D

ocedure.

urer’s

s per

ation ircuit

ds.

e link

DEWA

s per

ls for nt.

ends

ucted

ill be

DEWA

Page 4 of 57

Page 5: M. statment lines   cable instal & testing

TP

3.

Sa

Pr

P/TCD/QP‐06

. 132kV

afety Aspe Safety

Tools

All eq

First A

Ensur

Ensur

Fire e QHSE Safety

WorkPTW t

Neces

Specia

re require1. DEWA

statem

2. Grouptermi

3. Ensur

4. All tesite.

5. DEWAthe su

6. Fitting

7. The a

8. The a

9. Entry

10. Inform

11. Outag

12. DEWA13. Cable

6/CAB/MS ‐

V Cable T

ects y officer sha

box talk wi

quipment / m

Aid box sha

re sufficient

re sufficient

extinguisher checklist rey measures

to be carrito be enter

ssary protec

al precautio

ements: A’s Sheath ment (Test

p & phase nation bay

re cleanlines

rmination &

A approvedubstation w

g Instructio

pproval of t

pproval of t

permit/wo

m DEWA Pr

ge to be tak

A’s TED civile dressing an

0

Terminati

all be availa

ill be perfor

machineries

ll be availab

t drinking w

t trained ma

r & fire blanequirement & PPE for p

ed out unded into S/S.

ction to be

on to be tak

healthinesreport to be

confirmatiowith DEWA

ss and tidin

& GIS equip

installationwall.

n to be ava

the location

the Baseme

ork permits t

ojects & Co

ken for the f

l check list ind necessar

03

ion Work

able accordi

rmed before

s need to b

ble at site

water shall b

anpower sh

nket shall bet shall be copeoples to b

er the supe.

given to the

ken for LHS

ss to be ee available

on (ThrougA approved

ness in the w

pment’s, to

n drawing,

ilable at sit

n of the link

ent drawing

to be obtain

ommissionin

feeder bay.

is cleared anry supportin

ks

ing to critica

e starting an

e calibrated

be provided

hall be used

e provided iomplied. be checked

ervision of D

e existing ca

cables in th

ensured by at site).

h conductobay confirm

work place.

ols and app

schematic d

e as per DE

k box to be a

g to be avail

ned for term

ng Dept. pri

nd TCD instng works sh

al site cond

ny activity.

d.

during wor

.

n the work

by safety o

DEWA staff

ables.

he basemen

sheath te

or/Sheath) wmation chec

proved join

diagram an

WA require

approved b

able at site

mination wo

or to the st

tallation chehall complet

ition / DEW

rk to preven

area.

officer.

persons wh

nt

est as per

will be enscklist

ters & GIS

d bay confi

ement / Inst

by DEWA.

.

ork.

tart of work

ecklist to bete as per ap

WA witness r

nt dehydrat

hose names

DEWA ap

sured at su

supervisor

irmation to

truction.

k.

e carried oupproved dra

requiremen

tion.

s are availab

proved me

bstation fo

are availab

o be display

ut and cleareawing.

nt.

ble in

ethod

r the

ble at

ed in

ed.

Page 5 of 57

Page 6: M. statment lines   cable instal & testing

TP

In

P/TCD/QP‐06

14. All thcleanstart o

15. DILO

nstallation1. Name

2. Termilimita

3. Cable

4. Termi

5. DEWAinstal

6. Cable

7. Graph

8. Conta9. Avail

10. Phase

11. Condu

12. All the

13. Degas

14. DockiDEWA

15. Neces

16. At rem

17. For HV

18. Vacuu

19. Gas pcarrie

20. All the

6/CAB/MS ‐

e GIS interfing agent, eof terminatM/c and Ca

n Method:e as PTW lis

inations woation of base

e to be posit

inations to

A approvedled as per t

e minimum

hite remova

act resistancthe GIS bay

e checking t

uctor resist

e GIS relate

ssing of GIS

ng in the cA & GIS spe

ssary suppo

mote end su

V injection

uming & gas

pressure to ed out.

e above Ga

0

face materietc) and antion works. able test ado

:‐ t & entry ti

orks will beement.

tioned for te

be carried o

manufactuhe same.

bending rad

al checks to

ce of the cry outage by

through con

ance test to

ed activities

cable cham

cables as pcialist.

orting works

ubstations,

end adapto

s filling of th

be checke

s related te

03

ials, consumny special fl

opters (if re

me will be r

e carried ou

ermination

out by DEW

urer’s fitting

dius to be m

be carried

imped feruDEWA‐TCD

nductor to b

o be carried

to be carrie

mber to be c

er the pha

s to be com

HV links to

or fixing to b

he cable ch

d and Gas

ested to be c

mables (SF6lange arran

equired) to

registered i

ut either in

works with

WA approved

g instructio

maintained a

out.

le to be meD staff.

be carried o

d out as per

ed out by D

carried out.

se configur

mpleted.

be installed

be carried o

amber to b

quality test

carried out

6 Gas, O‐rinngement re

be taken ov

n the log bo

the basem

h proper ver

d terminatio

n shall be a

and verified

easured and

out.

site require

DEWA appro

ration mark

d and absor

out.

e carried ou

ts (Dew po

24 hrs afte

ngs, Gasketsquired to b

ver from DE

ook at secu

ment or in G

rtical suppo

on manufac

available at

d trough ou

d recorded.

ements.

oved GIS spe

k on the G

rbent to be

ut.

oint, Gas pu

r completio

s absorbentbe available

EWA or Man

rity room.

GIS room as

orts.

cturer’s fitte

site and te

t terminatio

ecialist

IS chamber

replaced.

urity) & Lea

on of the ga

t, silicon gre at site pri

nufacturer.

s per the h

ers.

ermination t

on works.

r in presenc

akage test t

s filling.

ease, or to

eight

to be

ce of

to be

Page 6 of 57

Page 7: M. statment lines   cable instal & testing

TP

4.

Sa

Pr

P/TCD/QP‐06

. 132kV

afety Aspe Safety Tools First A Ensur Ensur Fire e QHSE Safety Neces Neces Specia Neces Prope

re require1. Appro2. Name3. Suffic4. The d

specif5. Fabric6. All the7. To be8. Existin

9. Do no

10. Final

11. Suppo

12. Spacin

13. Fire e

14. Bendi

15. Rubbe

6/CAB/MS ‐

V Cable Su

ects: y officer shabox talk wiAid box share sufficientre sufficientextinguisher checklist rey measures ssary work ssary protecal precautiossary safetyer housekee

ements & ove basemee as PTW liscient manpodesign and fication / DEcated Cablee cable supe communicng services

ot step or an

position of

ort for the c

ng between

exit & firefig

ing radius fo

er wrap aro

upportin

all be availaill be perforll be availabt drinking wt trained mar shall be prequirement & PPE for ppermits to bction to be on to be taky guard to beping to don

Installatioent drawingt & entry tiower, requirconstructioEWA practice supports aports and ccate with SOwill be prot

ny suppress

f the cable a

cable will be

n supports w

ghting equip

or the cable

ound the ca

04

ng works

able accordirmed beforeble at site water shall banpower shrovided in tht shall be copeoples to bbe obtainedgiven to theken for LHS be available ne daily bas

on Methog & bay confme will be rred materiaon of all cces. and cleats shcleats shall bOD before thtected prop

sed on the L

at the basem

e fixed in th

will be main

pment shou

e will be ma

ble shall ov

s

ing to criticae starting an

be provided hall be usedhe work areomplied. be checkedd. e existing cacables in thfor all the mses.

od: firmation siregistered ials & tools wcleats and s

hall be freebe galvanizehe starting perly to avo

LHS cable.

ment will be

he basemen

ntained as p

uld not be b

aintained as

verlap 25mm

al site condny activity.

during wor. ea.

by safety o

ables. he basemenmachinery.

gned checkn the log bowill be availsupport arr

from blisteed. the work if id any dam

e done man

nt floor usin

per DEWA s

locked.

s per the ca

m both side

ition / DEW

rk to preven

officer.

nt

ked list. ook at secuable at site rangement

ers, laminat

necessary. ages.

nually.

g uninstruc

pecification

ble manufa

s of the me

WA witness r

nt dehydrat

rity room. as per the shall be u

ions & othe

cted channe

n.

cturer’s GT

etal cleats.

requiremen

tion.

requiremenused as per

er defects.

els.

TP.

nt.

nt. r the

Page 7 of 57

Page 8: M. statment lines   cable instal & testing

TP

P/TCD/QP‐06

16. Cable

17. Each C

18. Suppocurre

19. All cleequal

20. Coppe

21. Aftersecur

6/CAB/MS ‐

e cleats shal

Cable shall

orting worknt.

eats, Cable size coppe

er stripes/b

r completioity room.

l be spaced

be support

k near base

support, str bar and to

bars shall be

n the job, w

04

d 1200 mm o

ed at a poin

ement entry

eel structuo be directly

e brazed / b

while leavin

on vertical /

nt not more

y shall avoi

re shall be y connected

bolted with

ng the subst

/ horizonta

e than 500 m

id any close

earthed witd to main e

main earth

tation time

l runs wher

mm from its

ed path wh

th 95sqmmarth point.

bars as per

out will be

re ever nece

s terminatio

hich may cr

m bare copp

r site requir

entered in

essary.

on.

reate circul

per conduct

rement.

the log bo

ating

tor or

ok at

Page 8 of 57

Page 9: M. statment lines   cable instal & testing

TP

5.

Sa

Ins

a)

P/TCD/QP‐06

. Link Bo

afety Aspe Safety Tools First A Ensur Ensur Fire e QHSE Safety Neces Neces Specia Neces Prope

stallation

) Link box 1. DEWA

2. Link b

3. The b

4. Bondi

5. A req

6. Main conne

7. The li

8. Appro

9. The lmaint

10. In sidoptio

6/CAB/MS ‐

ox Instal

ects: y officer shabox talk wiAid box share sufficientre sufficientextinguisher checklist rey measures ssary work ssary protecal precautiossary safetyer housekee

Method:

x with singl

A approval t

boxes shall b

bonding cab

ing cable te

quired size o

earth to tected direct

nk boxes bo

oved circuit

link box totenance.

de substation, a suitable

0

llation w

all be availaill be perforll be availabt drinking wt trained mar shall be prequirement & PPE for ppermits to bction to be on to be taky guard to beping to don

le core bon

to be availa

be installed

les size sha

ermination t

of Lug to be

the Link botly with mai

ody shall be

t identificati

o be fixed

on, Link boxe plat form

05

works

able accordirmed beforeble at site water shall banpower shrovided in tht shall be copeoples to bbe obtainedgiven to theken for LHS be available ne daily bas

nding cable

able at site f

by skilled t

ll be 300sqm

to be done

e crimped p

ox shall bein earth grid

e earthed w

ion label/fe

d in a suit

xes shall noto be insta

ing to criticae starting an

be provided hall be usedhe work areomplied. be checkedd. e existing cacables in thfor all the mses.

e

for Link box

technician.

mm & lengt

as per the p

roperly wit

e not less d.

with not less

errules & da

table heigh

ot be installed below t

al site condny activity.

during wor. ea.

by safety o

ables. he basemenmachinery.

x, bonding c

th as per sp

phase confi

h bonding c

than 300sq

s than 95sqm

nger board

ht & locati

lled over tthe link box

ition / DEW

rk to preven

officer.

nt

cable and ac

pecification

guration.

cable to avo

qmm yellow

mm yellow/

shall be pr

ion to faci

he cable roxes.

WA witness r

nt dehydrat

ccessories.

oid any loos

w/Green c

/Green cabl

rovided in th

ilitate easy

oute. Incase

requiremen

tion.

se connectio

able and t

le.

he link boxe

y access d

e no altern

nt.

on.

to be

es.

uring

native

Page 9 of 57

Page 10: M. statment lines   cable instal & testing

TP

b)

P/TCD/QP‐06

) Link box1. DEWA

2. Link b

3. Enclo

4. Link bas per

5. If the

6. If linkgrabbwiths

7. Link binclin

8. Link bopeni

9. Insidewith c

10. The c

11. The b

12. Bondi

13. Main conne

14. The lconne

15. Bondi

16. Appro

17. Stand

18. Link b

19. Maste

20. Link bappro

6/CAB/MS ‐

x with coax

A approval t

boxes shall b

sure base s

box enclosur DEWA sta

link box is a

box is in anble in whichtand in pos

box enclosuation not ac

box enclosuing & closin

e enclosure concrete en

hannels are

bonding cab

ing cable te

earth to tected direct

ink boxes ected direct

ing cable in

oved circuit

dard size of

box enclosu

er lock to be

box enclosuoved steel c

xial core b

to be availa

be installed

hall be plac

re & Concrendard.

away from

n unmade a sand cannoition.

res shall fixcceptable.

re door suitng.

having twonclosure by

e free from

les size sha

ermination t

the Link botly with mai

body shall tly with mai

ner & oute

t identificati

identificatio

re to be bac

e provided

re to be prorash barrie

05

onding cab

able at site f

by skilled t

ced near to

ete base sh

cable route

area minimuot washout

x properly &

table cleara

o link boxes nut‐bolt.

blister, lam

ll be 300sqm

to be done

ox shall bein earth me

be earthein earth me

r to be iden

ion label/fe

on plate & d

ckfilled with

to prevent

otected by sr shall be pr

ble (flush t

for Link box

technician.

the Joint ba

all not have

e special app

um 2 sq. medue to hea

& shall be pe

ance from fi

named as g

minations &

mm & lengt

as per the p

e not less esh.

ed with notesh.

ntified clear

errules & da

danger boa

h sands up t

any unauth

steel bollardrovided to p

type / Vert

x, bonding c

ay above th

e any damag

proval to be

eter surrounavy rain and

erpendicula

inish ground

group 1 & 2

other defec

th as per sp

phase confi

than 300sq

t less than

ly.

nger board

rd to be pro

to the mark

horized acce

ds & if it is sprotect aga

tical type)

cable and ac

he normal tr

ge or crack

e obtained f

nding area s winds as a

r with finish

d or surface

2 or circuit 1

cts.

pecification

guration.

qmm yellow

95sqmm

shall be pr

ovided on t

ked level as

ess.

situated beinst rude Ve

:

ccessories.

rough cover

and shall b

from conce

shall be com result link

h surface le

e level, doo

1 & 2 shall b

w/Green c

yellow/Gre

rovided in th

he link box

per DEWA

side the roaehicle move

r.

e well paint

rn parties.

mpacted witbox remain

evel, any

rs can easily

be rigidly fix

able and t

een cable t

he link boxe

enclosure.

requiremen

ad DM/RTAement.

ted

th n

y

xed

to be

to be

es.

nts.

A

Page 10 of 57

Page 11: M. statment lines   cable instal & testing

TP

M

1.

Pu

Eq

Sa

Te

P/TCD/QP‐0

Method s

. Sheath

urpose of To ensite a

quipment DC hig Disch Conne Hand Warn

afety Req All saf

Durinsite d

Barric

All the

Unwa

est Proced1. Cable

to pre

2. TED c

3. Open

4. Cable

5. Remo

6. Nail to

7. Earth

8. Inject

06/CAB/SAT

tatemen

h Integri

f the test: sure that thnd to avoid

t used for gh voltage karge / Earthection leadsTools. ing tape &

uirementsfety measu

g criticality uring testin

cade the cab

e power too

anted mater

dure: e drum shallevent the m

checklist cle

ing the dru

e drum to be

oval of grap

o be inserte

ing to be pr

t voltage gra

T ‐

nt for 132

ity Test B

he cables ar any ambig

the test: kit. h Rod. s.

Caution Boa

s: res should b

at site / DEng works.

ble drum an

ols and han

rials to be r

l be placed movement o

arance to b

m shall be i

e kept open

hite coating

ed up to lea

rovided to g

adually up t

01

2kV cabl

Before Ca

re free fromuity betwee

ard.

be checked

EWA witnes

nd provide w

d tools to b

emoved fro

in a leveledof the drum

be obtained

n presence

n and both e

g of outer p

ad sheath at

graphite coa

to 10KV, ke

le Testing

able layin

m defect & fen manufac

& confirme

ss engineers

warning tap

be properly

om the wor

d ground an.

and availab

of Manufa

ends of the

protection s

t test end G

ating area a

pt injection

g

ng (Drum

fault during cturer & cab

ed by safety

s instruction

pes.

insulated.

k location.

d suitable s

ble at site.

cture/DEW

cable to be

heath at bo

Graph remov

and the cab

for 60 sec

m test)

transportable contract

y officer.

n, safety off

stoppers sha

WA.

e taken out.

oth ends (>2

ved area.

le drum itse

and noted l

tion from fator.

ficer shall b

all be place

.

20 cm)

elf,

leakage cur

actory to th

e available

d on both s

rrent.

he

at

sides

Page 11 of 57

Page 12: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

9. Switc

10. Disch

11. Repea

12. All tes

est Diagra

cceptance

10kV

If dru

06/CAB/SAT

h off the po

arge the ca

at the test f

st results ar

am:

e criteria:

DC voltag

m test fai

T ‐

ower supply

ble by disch

for other ca

re recorded

e should w

iled the fa

01

y of the test

harge rod.

able drums.

d in test form

withstand fo

aulty drum

t kit and allo

mat.

or a time p

m shall be

ow self disc

period of 1

replaced

harge.

min witho

with new

out any bre

w one.

eakdown.

Page 12 of 57

Page 13: M. statment lines   cable instal & testing

TP

2.

Pu

Eq

Sa

Te

P/TCD/QP‐0

. Insula

urpose of To ch

To ch

To en

To un

quipment Insula Temp Disch Conne Hand Warn

afety Req All saf

Durinsite d

All the

Unwa

Safety

Barric

est Proced1. All po

shall b

2. Ensur

3. Conne

4. Befor

5. Switc

06/CAB/SAT

tion Resi

f the test: eck any dam

eck the insu

sure condu

nderstand th

t used for ation Testerperature & Harge / Earthection leadsTools. ing tape &

uirementsfety measu

g criticality uring testin

e power too

anted mater

y staff to be

cade the tes

dure: ower cables be complet

re that no o

ect negative

re injection

h on the ins

T ‐

istance T

mage occur

ulation inte

uctive parts

he nature o

the test: r (Megger). Humidity inh Rod. s.

Caution Boa

s: res should b

at site / DEng works.

ols and han

rials to be r

e available b

st area at bo

are in finaled.

ther party i

e terminal o

to ensure t

strument ap

02

Test Afte

rred during

grity before

are isolated

f fault for c

dicator.

ard.

be checked

EWA witnes

d tools to b

emoved fro

both testing

oth ends wi

position (T

is working n

of the test k

he far end i

pplied 1 KV

er Laying,

cable pullin

e and after

d from grou

able insulat

& confirme

ss engineers

be properly

om the wor

g & remote

ith safety w

Trefoil) with

near to our

kit to the te

is open and

DC for one

g, along w

ng.

any voltage

und.

tion during

ed by safety

s instruction

insulated.

k location.

end of test

warning tape

Cable tie fa

testing area

st terminal

isolated fro

minute and

with HV t

e injection.

fault locatin

y officer.

n, safety off

ing cable.

es & Safety

astened and

a.

& the posit

om earth.

d measured

tests.

ng.

ficer shall b

Sign boards

d FO Cable

tive to earth

d the Insulat

e available

s.

(If any) layi

h.

tion Value.

at

ng

Page 13 of 57

Page 14: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

6. Switc

7. Disch

8. Repea

9. All tes

est Diagra

cceptance

Insulavalueresistor mo

06/CAB/SAT

h off the po

arge the ca

at the proce

st results ar

am:

e criteria:

ation resiste shall nottance valueoisture con

T ‐

ower supply

ble with ea

ess for all th

re recorded

tance of Xt be less tes can be hntent of th

02

y and wait t

rth rod.

he other ph

d in test form

LPE shall bthan 100 higher or loe insulatio

ill the resid

ases.

mat.

be measureMΩ per 1ower, depeon (resistan

ual voltage

ed at 1 kV‐1000m at ending uponce decreas

gets self di

‐DC for 1 mambient ton such fases in temp

scharged.

minute andtemperatuctors as thperature o

d the measre. The ache temperaor moisture

ured ctual ature e).

Page 14 of 57

Page 15: M. statment lines   cable instal & testing

TP

3.

Pu

Eq

Sa

Te

P/TCD/QP‐0

. Sheath

urpose of To en

To de

quipment DC hig 1kV M Temp Disch Conne Hand Warn

afety Req All saf

Durinsite d

All the

Unwa

Safety

Barric

est Proced TE

Si

En

a) Sectio

1. Ch

2. Ea

06/CAB/SAT

h Integri

f the test: sure the joi

etermine the

t used for gh voltage kMEGGER. perature & Harge / Earthection leadsTools. ing tape &

uirementsfety measu

g criticality uring testin

e power too

anted mater

y staff to be

cade the tes

dure: ED checklist

gned Bay co

nsure that n

onal Phasin

hecking of t

ach phase s

T ‐

ity test &

inting of co

e healthine

the test: kit.

Humidity inh Rod. s.

Caution Boa

s: res should b

at site / DEng works.

ols and han

rials to be r

e available b

st area at bo

t clearance

onfirmation

no other pa

ng

the safety m

hall be test

03

& Section

rrect phase

ss of the sh

dicator.

ard.

be checked

EWA witnes

d tools to b

emoved fro

both testing

oth ends wi

to be obtai

n Checklist t

rty is worki

measures fo

ed one by o

nal Phasi

e cable to ot

heath of the

& confirme

ss engineers

be properly

om the wor

g & remote

ith safety w

ned and ava

to be availa

ng near to o

or both ends

one.

ing befor

ther cable s

e cable durin

ed by safety

s instruction

insulated.

k location.

end of test

warning tape

ailable at si

ble at site.

our testing

s.

re Jointin

section of sa

ng & after in

y officer.

n, safety off

ing cable.

es & Safety

te.

area.

ng

ame phase.

nstallation

ficer shall b

Sign boards

e available

s.

at

Page 15 of 57

Page 16: M. statment lines   cable instal & testing

TP

P/TCD/QP‐0

3. Cotw

4. In

5. Swth

6. Th

7. Wbyop

8. Pr

9. Ab

10. Th

b) Sectio

1. Re

2. Na

3. In

4. In

5. Sw

6. Di

7. Re

8. Re

9. Al

06/CAB/SAT

onnect negawo phases a

jection volt

witch on thehe far end.

he correct p

When meter y removing pen and 0Ω

rovide prop

bove proced

he test resu

onal Sheath

emoval of g

ail to be ins

sulation res

ject voltage

witch off the

ischarge the

epeat the te

epeat Insula

ll test result

T ‐

ative terminare open at

tage to be li

e MEGGER

phase shall i

reads 0Ω aand connec respective

per phase m

dure shall b

ults are reco

h test

graphite coa

serted up to

sistance tes

e gradually

e power su

e cable by d

est same fo

ation resista

ts are recor

03

nal of the tefar end.

imited to 50

apply the v

indicate 0Ω

t test end, tcting the grly as per th

markings at t

be repeated

orded in tes

ating of out

o lead sheat

st (1kV) to b

up to 5KV,

pply o the t

discharge ro

r other cab

ance test (1

rded in test

est kit to th

0‐150V in n

oltage now

Ω (Shorting c

this is the cound of thee connectio

test location

d for check t

t format.

er protectio

th at test en

be performe

kept injecti

test kit and

od.

les.

1kV) to be p

format.

e conducto

ormal situa

successive

condition) w

orrect phase phase at fon at far end

n & remote

the other p

on sheath a

nd Graph re

ed for all ca

on for 60 se

allow self d

performed f

r & the pos

ations.

ly grounded

with all othe

se. This can far end, nowd.

end.

hases.

t both ends

emoved are

bles.

ec and note

discharge.

or all cables

sitive to eart

d each phas

er phase op

be further w the meter

s (15‐20 cm

a.

ed leakage c

s.

th. The othe

se cable fro

pen.

cross checkr shall read

)

current.

er

m

ked

Page 16 of 57

Page 17: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

est Diagra

cceptance

Sectio

Ensurthe te

Sectio

The twitho

06/CAB/SAT

am:

e criteria:

onal Phasi

ring the teest to be c

onal Sheat

test shouldout any bre

T ‐

ing

sted phaseonsidered

th Test

not breakeakdown &

03

e is in shortas passed

kdown with& the leaka

t condition

hin a minutage current

n while oth

te at 5kv Dt in tolerab

her phases

DC (New cable limit.

are in ope

ble) for 1 m

n conditio

minute

n,

Page 17 of 57

Page 18: M. statment lines   cable instal & testing

TP

4.

Pu

Eq

Sa

Te

P/TCD/QP‐0

. 132kV

urpose of To ch

coaxia

quipment DC hig 1kV M Temp Disch Conne Hand Warn

afety Req All saf

Durinsite d

All the

Unwa

Safety

Barricexting

est Proced1. All joi

2. Coord

3. The in

4. The co

5. Insula

6. Inject

7. Switc

06/CAB/SAT

V cable Sh

f test: eck the inte

al bonding c

t used for gh voltage kMEGGER. perature & Harge / Earthection leadsTools. ing tape &

uirementsfety measu

g criticality uring testin

e power too

anted mater

y staff to be

cade the tesguishers sha

dure: nting works

dination wit

nstalled join

oaxial bond

ation resista

t voltage gra

h off the po

T ‐

hield Bre

egrity of the

cable.

the test: kit.

Humidity inh Rod. s.

Caution Boa

s: res should b

at site / DEng works.

ols and han

rials to be r

e available b

st area at boall be provid

s to be com

th other wo

nt shield sha

ding cable o

ance test (1

adually up t

ower supply

04

eak Test

e metallic sh

dicator.

ard

be checked

EWA witnes

d tools to b

emoved fro

both testing

oth ends wided

mpleted and

orking team

all be tested

of the one co

kV) to be pe

to 5KV, kept

y o the test

heath separ

& confirme

ss engineers

be properly

om the wor

g & remote

ith safety w

container t

to ensure n

d after the j

ore shall be

erformed fo

t injection f

kit and allo

rator (shield

ed by safety

s instruction

insulated.

k location.

end of test

warning tape

to be remov

no other pa

joint is com

e tested wit

or all cables

for 60 sec a

w self disch

d) of the joi

y officer.

n, safety off

ing cable.

es, Safety Si

ved.

arty working

mpleted.

h the other

s.

nd noted le

harge.

nt and the

ficer shall b

ign boards a

g near to th

r core Earth

eakage curre

connected

e available

and fire

e testing ar

ed.

ent.

at

rea.

Page 18 of 57

Page 19: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

8. Disch

9. Repea

10. Repea

11. All tes

est Diagra

cceptance

The twitho

06/CAB/SAT

arge the ca

at the test s

at Insulation

st results ar

am:

e criteria:

test shouldout any bre

T ‐

ble by disch

same for ot

n resistance

re recorded

not breakeakdown &

04

harge rod.

her cables.

e test (1kV)

d in test form

kdown with& the leaka

to be perfo

mat.

hin a minutage current

ormed for a

te at 5kv Dt in tolerab

ll cables.

DC (New cable limit.

ble) for 1 m

minute

Page 19 of 57

Page 20: M. statment lines   cable instal & testing

TP

5.

Pr

Eq

Sa

Te

P/TCD/QP‐0

. Sheath

ropose of To asc

quipment DC hig 1kV M Temp Disch Conne Hand Warn

afety Req All saf

Durinsite d

All the

Unwa

Safety

Barricexting

est Proced1. Ensure

2. Discon

3. Clean

4. Ensure

5. Check

6. Ensure

7. Insula

8. One egroun

9. Switch

06/CAB/SAT

h Voltag

f test: certain the

t used for gh voltage kMEGGER. perature & Harge / Earthection leadsTools. ing tape &

uirementsfety measu

g criticality uring testin

e power too

anted mater

y staff to be

cade the tesguishers sha

dure: e that the li

nnect all the

it properly

e there is n

k the rating

e the rating

ation resista

nd of the SVnd.

h on the HV

T ‐

e Limiter

withstand c

the test: kit.

Humidity inh Rod. s.

Caution Boa

s: res should b

at site / DEng works.

ols and han

rials to be r

e available b

st area at boall be provid

ink box inst

e SVL leads

& handle th

o other phy

of the SVL a

g of the SVL

ance test (1

VL to be co

VDC test kit.

05

r (SVL) In

capacity an

dicator.

ard

be checked

EWA witnes

d tools to b

emoved fro

both testing

oth ends wided

allation com

from the b

he housing

ysical dama

as per the D

as per DEW

kV) to be pe

nnected as

ntegrity T

d proper fu

& confirme

ss engineers

be properly

om the wor

g & remote

ith safety w

mpleted & c

onding link

part carefu

ge in the SV

DEWA requi

WA approva

erformed fo

injecting po

Test

unctioning o

ed by safety

s instruction

insulated.

k location.

end of test

warning tape

connections

s.

ully.

VL.

irement.

l

or all SVLs.

oint from th

of SVL.

y officer.

n, safety off

ing cable.

es, Safety Si

s made pro

he HVDC tes

ficer shall b

ign boards a

perly.

st kit and ot

e available

and fire

ther end to

at

Page 20 of 57

Page 21: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

10. Recor

11. Increa

12. Discha

13. Repea

14. The te

est diagra

cceptance

SVL tcond

06/CAB/SAT

d the Leaka

ase voltage

arge it until

at Insulation

est results a

am:

e Criteria:

o be in opeition after

T ‐

age current

until the cu

the voltage

n resistance

are recorde

:

en conditioachieving

05

at UC ‐2, U

ut off voltag

e comes do

e test (1kV)

d in test for

on when apthe above

C ‐1, and U

ge reached a

wn to zero

to be perfo

rmat.

pplying volmentione

C is applied

at 100 uA &

and make i

ormed for a

ltage up tod leakage c

d across two

& 1 mA and

t for others

ll cables.

o Uc voltagcurrents.

o points.

records the

s.

ge. SVL to r

e value.

egain its o

pen

Page 21 of 57

Page 22: M. statment lines   cable instal & testing

TP

6.

Pr

Eq

Sa

Te

P/TCD/QP‐0

. Joint B

ropose of To ma

quipment Earth Conne Hand Warn Cautio

afety Req All saf

Durinsite d

All the

Unwa

Safety

Barricexting

est Proced1. Ensure

2. Check

3. Ensure

4. Check

5. Ensure

6. Conne

7. Make

8. Switch

06/CAB/SAT

Bay Earth

f test: ake sure the

t used for Resistanceection leadsTools. ing tape. on Board.

uirementsfety measu

g criticality uring testin

e power too

anted mater

y staff to be

cade the tesguishers sha

dure: e the Comp

k the ground

e the groun

k the earthli

e no other p

ect all test c

sure to stri

h on the ins

T ‐

h Resista

e measured

the Test: Tester withs.

s: res should b

at site / DEng works.

ols and han

rials to be r

e available b

st area at boall be provid

pletion of al

d level is pro

nd level is eq

ng connect

party worki

cords as per

ke the auxi

strument an

06

ance Test

d value of th

h accessorie

be checked

EWA witnes

d tools to b

emoved fro

both testing

oth ends wided

l Earth grid

operly com

qual to the

tions are iso

ng near to t

r connection

liary earth r

nd record ea

t

he earth grid

es.

& confirme

ss engineers

be properly

om the wor

g & remote

ith safety w

and link bo

pacted.

link box en

olated in the

the testing

n diagram o

rods in requ

arth resista

d complies

ed by safety

s instruction

insulated.

k location.

end of test

warning tape

ox installatio

closure bas

e link box.

area.

of the instru

uired depth

nce value

with accept

y officer.

n, safety off

ing cable.

es, Safety Si

on works as

se.

ument.

in earth.

ted value.

ficer shall b

ign boards a

s per the DE

e available

and fire

EWA standa

at

ard.

Page 22 of 57

Page 23: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

9. Repea

10. The te

est diagra

cceptance

The Minsta

06/CAB/SAT

at the test fo

est results a

am:

e Criteria:

Maximum ollation guid

T ‐

or the othe

are recorded

:

of not mordeline).

06

r group also

d in test for

re than 4 o

o.

rmat.

ohm earth r

resistance

should be achieved ((As per the

e

Page 23 of 57

Page 24: M. statment lines   cable instal & testing

TP

7.

Pr

Eq

Sa

Te

P/TCD/QP‐0

. Link Bo

ropose of To ma

quipment Micro Conne Warni

afety Req All saf

Barric

est Proced1. Ensure

2. Fix the

3. Make

4. Coord

5. After s

6. The re

7. If the betwe

8. The te

Accep

The m20 µ Ω

06/CAB/SAT

ox Conta

f test: ake sure the

t used for Ohm Meteection leadsng tape & C

uirementsfety measu

cade the are

dure: e the Comp

e Links & SV

required tig

dination wit

setting the

esistance m

links are noeen the gap

est results a

ptance Cri

measured vΩ.

T ‐

act Resis

e measured

the Test: er (DLRO 10)s. Caution Boa

s: res should b

ea where th

pletion of al

VL (If applica

ghtness of a

h other wo

instrument

easuremen

ot fixed propps of two co

are recorded

iteria:

alue shoul

07

tance Te

d value of co

).

ard.

be checked

he cables to

l Link box in

able) as pe

all links in t

rking team

ts connectio

nts to be obt

perly, the montacts.

d in test for

d be less th

est

ontact resis

& confirme

o be tested w

nstallation w

er approved

he Link Box

to ensure n

on, the cont

tained for 7

measuremen

rmat.

han

tance comp

ed by safety

with warnin

works as pe

the schem

x.

no other tes

tact resistan

7 locations a

nt shall be h

plies with ac

y officer.

ng tapes.

er the DEWA

atic diagram

st on it.

nce shall be

as per the t

high due to

Test d

ccepted val

A standard.

m.

e measured.

est diagram

the potent

diagram:

ue.

.

m below.

ial drop

Page 24 of 57

Page 25: M. statment lines   cable instal & testing

TP

8.

Pr

Eq

Sa

Te

P/TCD/QP‐0

. 132 kV

ropose of To ma

quipment IR Tes Disch Conne Tools Warn

afety Req All saf

Durinsite d

All the

Unwa

Safety

Barric

est Proced1. Ensur

2. Ensuravaila

3. The G

4. Ensur

5. Both e

6. Sufficone.

7. Connephase

8. Inject

9. Switcfar en

06/CAB/SAT

V Cable P

f test: ake sure co

t used for ster (MEGGarge Rod ection leads

ing tape, Ca

uirementsfety measu

g criticality uring testin

e power too

anted mater

y staff to be

cade the tes

dure: re the comp

re the apprability wher

Group & Pha

re other par

ends of the

cient manpo

ect negatives are open

tion voltage

h on the Mnd.

T ‐

Phase ve

rrect phase

the test: ER)

s

aution Boar

s: res should b

at site / DEng works.

ols and han

rials to be r

e available b

st area at bo

pletion of ca

roved Bay cever requir

ase configur

rty working

e cable shall

ower to be

e terminal at far end.

e to be limit

MEGGER app

08

rification

es of cables

rd etc.

be checked

EWA witnes

d tools to b

emoved fro

both testing

oth ends wi

able installa

confirmatioed.

ration in the

near to the

be isolated

placed at b

of the test

ed to 50‐15

ply the volt

n Test (E

are docked

& confirme

ss engineers

be properly

om the wor

g & remote

ith safety w

ation and ba

n check list

e GIS to be

e testing are

d from the e

oth ends of

kit to the c

50V in norm

tage now su

End to En

in as per th

ed by safety

s instruction

insulated.

k location.

end of test

warning tape

ack filling of

t for the ci

physically c

ea.

earth.

f testing cab

conductor &

mal situation

uccessively

nd‐Throug

he GIS phas

y officer.

n, safety off

ing cable.

es and Safet

f cable rout

rcuit, Entry

checked.

ble. Each ph

& the positi

ns.

grounded e

gh Cond

se configura

ficer shall b

ty Sign boar

e as per DE

y Permits &

hase shall b

ve to earth

each phase

uctor)

ation.

e available

rds

WA standa

& GIS Super

be tested on

h. The other

e cable from

at

rd.

rvisor

ne by

r two

m the

Page 25 of 57

Page 26: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

10. The co

11. Whenremov0Ω re

12. Provid

13. Above

14. The te

est Diagra

cceptance

If thebe co

06/CAB/SAT

orrect phas

n meter reaving and cospectively a

de proper p

e procedure

est results a

am:

e criteria:

e phases aconsidered a

T ‐

se shall indic

ads 0Ω at teonnecting thas per the c

phase marki

e shall be re

are recorde

ccording toas pass.

08

cate 0Ω (Sh

est end, thihe ground oconnection a

ings at test

epeated for

d in test for

o the phase

horting cond

s is the corof the phasat far end.

location &

r check the o

rmat.

e marking (

dition) with

rrect phase.se at far end

remote end

other phase

(R, Y and B

all other ph

. This can bd, now the

d.

es.

B) at both e

hase open.

be further cmeter shal

end of cabl

ross checkel read open

es the test

ed by n and

t to

Page 26 of 57

Page 27: M. statment lines   cable instal & testing

TP

9.

Pr

Eq

Sa

Te

P/TCD/QP‐0

. 132 kV

ropose of To ma

quipment IR Tes Disch Conne Tools Warn

afety Req All saf

Durinsite d

All the

Unwa

Safety

Barric

est Proced1. Ensur

2. Ensur

3. Ensur

4. Ensur

5. Phasi

6. Both s

7. In theappro

8. Suffic

9. Connephase

10. Inject

11. Switcfar en

06/CAB/SAT

V Cable P

f test: ake sure the

t used for ster (MEGGarge Rod ection leads

ing tape, Ca

uirementsfety measu

g criticality uring testin

e power too

anted mater

y staff to be

cade the tes

dure: re the comp

re all Bondin

re other par

re the phase

ng to be do

solid earthi

e link box Soved bondin

cient manpo

ect negatives are open

tion voltage

h on the Mnd.

T ‐

Phase ve

e sheath Bo

the test: ER)

s

aution Boar

s: res should b

at site / DEng works.

ols and han

rials to be r

e available b

st area at bo

pletion of ca

ng cables (In

rty working

e sequence

one for each

ng links sha

SVL connectng scheme.

ower to be p

e terminal at far end.

e to be limit

MEGGER app

09

rification

onding Syste

rd etc.

be checked

EWA witnes

d tools to b

emoved fro

both testing

oth ends wi

able installa

nner & Out

near to the

the bondin

h Major sect

all be isolate

tions to be

placed at bo

of the test

ed to 50‐15

ply the volt

n Test (E

em introduc

& confirme

ss engineers

be properly

om the wor

g & remote

ith safety w

ation and ba

er core) Lab

e testing are

ng cable ent

tion (Betwe

ed from the

isolated an

oth ends of

kit to the c

50V in norm

tage now su

End to En

ced for the

ed by safety

s instruction

insulated.

k location.

end of test

warning tape

ack filling of

beling comp

ea.

try to the lin

een two soli

e earth.

nd bonding

f testing & e

conductor &

mal situation

uccessively

nd‐Throug

circuit is as

y officer.

n, safety off

ing cable.

es and Safet

f cable rout

pleted.

nk box to be

id bonding/

connection

each phase

& the positi

ns.

grounded e

gh Sheat

per require

ficer shall b

ty Sign boar

e as per DE

e maintaine

/Earthing po

ns to be ma

shall be tes

ve to earth

each phase

th)

ement.

e available

rds

WA standa

ed same (R‐Y

oints)

aintained a

sted one by

h. The other

e cable from

at

rd.

Y‐B).

s per

one.

r two

m the

Page 27 of 57

Page 28: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

12. The co

13. Whenremov0Ω re

14. Provid

15. Above

16. The te

est Diagra

cceptance

EnsurSchem

06/CAB/SAT

orrect phas

n meter reaving and cospectively a

de proper p

e procedure

est results a

am:

e criteria:

ring the comatic bond

T ‐

se shall indic

ads 0Ω at teonnecting thas per the c

phase marki

e shall be re

are recorde

ontinuity ofding system

09

cate 0Ω (Sh

est end, thihe ground oconnection a

ings at test

epeated for

d in test for

f metallic sm.

horting cond

s is the corof the phasat far end.

location &

r check the o

rmat.

sheath laye

dition) with

rrect phase.se at far end

remote end

other phase

er transpos

all other ph

. This can bd, now the

d.

es.

sition obta

hase open.

be further cmeter shal

ined as pe

ross checkel read open

r approved

ed by n and

d

Page 28 of 57

Page 29: M. statment lines   cable instal & testing

TP

10

Pr

Eq

Sa

Te

P/TCD/QP‐0

0. 132 kV

ropose of To de

quipment DC hig 1kV M Temp Disch Conne Hand Warn

afety Req All saf

Durinsite d

All the

Unwa

Safety

Barricexting

est Proced1. Ensur

2. Ensur

3. Ensur

4. Ensur

5. Both s

6. In theappro

7. Suffic

8. Ensur

06/CAB/SAT

V Cable S

f test: etermine the

t used for gh voltage kMEGGER. perature & Harge / Earthection leadsTools. ing tape &

uirementsfety measu

g criticality uring testin

e power too

anted mater

y staff to be

cade the tesguishers sha

dure: re the comp

re all Bondin

re other par

re the phase

solid earthi

e link box Soved bondin

cient manpo

re link box a

T ‐

Sheath In

e healthine

the test: kit.

Humidity inh Rod. s.

Caution Boa

s: res should b

at site / DEng works.

ols and han

rials to be r

e available b

st area at boall be provid

pletion of ca

ng cables (In

rty working

e sequence

ng links sha

SVL connectng scheme.

ower to be p

and cable su

10

ntegrity t

ss of the Ca

dicator.

ard

be checked

EWA witnes

d tools to b

emoved fro

both testing

oth ends wided

able installa

nner & Out

near to the

the bondin

all be isolate

tions to be

placed at bo

upports & c

test (End

able System

& confirme

ss engineers

be properly

om the wor

g & remote

ith safety w

ation and ba

er core) Lab

e testing are

ng cable ent

ed from the

isolated an

oth ends of

able cleats

d to End)

m after insta

ed by safety

s instruction

insulated.

k location.

end of test

warning tape

ack filling of

beling comp

ea.

try to the lin

e earth.

nd bonding

f testing & e

works are c

llation.

y officer.

n, safety off

ing cable.

es, Safety Si

f cable rout

pleted.

nk box to be

connection

each phase

completed i

ficer shall b

ign boards a

e as per DE

e maintaine

ns to be ma

shall be tes

inside S/S b

e available

and fire

WA standa

ed same (R‐Y

aintained a

sted one by

basement,

at

rd.

Y‐B).

s per

one.

Page 29 of 57

Page 30: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

9. Fire re

10. Ensur

11. Insula

12. Inject

13. Switc

14. Disch

15. Repea

16. Repea

17. All tes

est Diagra

cceptance

The tcable

06/CAB/SAT

etardant pa

re no other

ation resista

t voltage gra

h off the po

arge the ca

at the test s

at Insulation

st results ar

am

e criteria:

test shoulde) for 1 min

T ‐

aint & LHS c

party work

ance test (1

adually up t

ower supply

ble by disch

same for ot

n resistance

re recorded

not breaknute witho

10

cable install

ing near to

kV) to be pe

to 10KV, ke

y o the test

harge rod.

her cables.

e test (1kV)

d in test form

kdown withut any bre

ation shall b

the testing

erformed fo

pt injection

kit and allo

to be perfo

mat.

hin a minutakdown &

be complet

area

or all cables

for 60 sec

w self disch

ormed for a

te at 10kv the leakag

ed Inside S/

s.

and noted l

harge.

ll cables.

DC for Newge current

/S basemen

leakage cur

w cable (5kin tolerabl

nt,

rrent.

kV for old le limit.

Page 30 of 57

Page 31: M. statment lines   cable instal & testing

TP

11

Pr

Eq

Sa

Te

P/TCD/QP‐0

1. Condu

ropose of To en

quipment Micro Laser T Conne Warni

afety Req All saf

Durinsite d

All the

Unwa

Safety

Barric

est Proced1. Ensur

2. Ensurstand

3. Calcu

4. Ensur

5. Post s

6. Coordside (f

7. Conne

8. Meas

9. Take t

10. Repea

11. Meas

12. Derive

06/CAB/SAT

uctor Res

f test: sure the int

t used for Ohm MeteThermo meection leadsng tape & C

uirementsfety measu

g criticality uring testin

e power too

anted mater

y staff to be

cade the tes

dure: re the comp

re the Comard.

late the act

re no other

sufficient m

dination witfor Feeder)

ect one end

ure conduc

the reading

at with Y ph

ure resistan

e each phas

T ‐

sistance T

tegrity of cr

the test: er (DLRO 10)eter. s. Caution Boa

s: res should b

at site / DEng works.

ols and han

rials to be r

e available b

st area at bo

pletion of ca

pletion of

tual length o

party work

manpower w

th other wo, TRFR & SW

d of all 3 ‐ p

ctor temper

g by the inst

hase & B ph

nce values o

se resistanc

11

Test for 1

rimping / bo

).

ard.

be checked

EWA witnes

d tools to b

emoved fro

both testing

oth ends wi

able installa

all Cable Jo

of the circu

ing near to

with shorting

orking teamWGR side (fo

hase condu

rature at no

trument wit

ase. And th

of the short

ce value by

132kV Ca

olting carrie

& confirme

ss engineers

be properly

om the wor

g & remote

ith safety w

ation and ba

ointing & T

it from as la

the testing

g leads at re

m and makeor IDT).

uctors with a

ormal condit

th R phase &

hen with R p

ting cable /

calculation.

able Syst

ed out in the

ed by safety

s instruction

insulated.

k location.

end of test

warning tape

ack filling of

Termination

aid details.

area.

emote end.

e clear to ac

a thick cabl

tion (Ambie

& Y phase c

phase & B p

leads and s

.

tem

e joints & te

y officer.

n, safety off

ing cable.

es and Safet

f cable rout

n installatio

ccess the te

e / Copper

ent Tempera

connected a

phase.

subtract it fr

erminations

ficer shall b

ty Sign boar

e as per DE

n works as

est in condu

Bar.

ature)

as per the d

rom the me

s.

e available

rds

WA standa

s per the D

uctor in SW

iagram.

easured valu

at

rd.

DEWA

WGR's

ues.

Page 31 of 57

Page 32: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

13. Calcu

14. Abov

15. The te

est Diagra

cceptance

The meathan the

06/CAB/SAT

late the Res

ve procedur

est results a

am:

e criteria:

asured resis design res

T ‐

sistance va

re shall be r

are recorde

stance valusistance Fo

11

lue at 20OC

epeated for

d in test for

ue correcteor 630 mm

C by using th

r check the

rmat.

ed at 20°C 2 copper c

he formulae

other Grou

must be econductor 0

e; R20 =Rt/

up cables.

qual or gre0.0283 ohm

L [1+ 0.003

eater (limitm/Km.

93(T ‐ 20)]

ted to 6%)

Page 32 of 57

Page 33: M. statment lines   cable instal & testing

TP

12

Pu

Eq

Sa

P/TCD/QP‐0

2. Verific

urpose of Ensur

quipment Multi

AC sinharmo

Three

Digita

Prote

Electr

Diese

Conne

Disch

Requi

afety Req1. Appro

2. Prior

3. No pe

4. Prior the re

5. Durinequip

6. Cross in com

7. After next l

06/CAB/SAT

cation of

f test: re the bond

t used for meter (Vol

ngle phase ponic measu

e phase vari

al Clamp me

ctive glass,

rical isolated

l power gen

ecting leads

arge roads.

ired safety m

uirementsoved safety

to start the

ersonal shal

to the testequired safe

g measurepment

bonding vemmunicatio

measuring ocation.

T ‐

f Cross Bo

ing system

the test: tage, curre

power meteurement eve

able auto t

eter / AC Po

helmet, saf

d gloves.

nerator

s.

materials a

s: engineer s

e test Tool b

ll be permit

the testingety sign boa

ements of

erification ion with safe

the each j

12

onding T

is provided

nt and resis

er with flexentually.

ransformer

ower Meter

fety shoes.

nd sign boa

hould be av

box talk nee

tted to work

g perimeterards to be p

electrical

s conductedety staff pos

oint locatio

Test for C

as per the

stance…)

ible cables

r

ards

vailable at s

eds to be co

k in the vici

r must be iplaced accor

parameter

d in the joinsted on the

on need to

Cable circ

approved s

(voltage cu

ite full time

nducted.

nity of the c

solated andrding to the

rs need to

nts link boxinjection en

switch off

cuit Earth

schematic b

rrent, frequ

e during the

cable during

d coded wite requireme

o wear all

xes on the snd to drive

the auto tr

hing Sys

bonding diag

uency, and p

e test.

g test

th approprient.

the pers

site by the tthe auto tra

ransformer

tem

gram.

power, with

iate tags an

onal prote

testing engansformer.

to travel to

h

nd all

ective

ineer

o the

Page 33 of 57

Page 34: M. statment lines   cable instal & testing

TP

Te

P/TCD/QP‐0

est Proced

1. Prior bondi

2. Far engroun

3. All the

4. Prior link b

5. Switcrangelength

6. Go tolink b

7. After with i

8. Againsheatrequir

9. The sa

10. Switc

Note: Wrinje

11. Injectmeas

12. After meas

13. Actuagrounspecif

14. The msystem

06/CAB/SAT

dure:

to start theing and all t

nd bridge thnd.

e safety pre

to switch ooxes that m

h on the aue of 50 ‐100 h, conducto

the first linoxes with t

recording tnsulated gr

n switch on th current ared only on

ame measu

h off the po

rong connecection cont

tion currentured again

recording tured at eac

al conductond shall be fications.

measured vm design.

T ‐

e test all ththe links ins

he three ph

eparation to

n the auto‐may generat

uto ‐ transfoA in each p

or size, trans

nk box to rehe ac powe

the necessaround stick.

the auto trand voltage e location m

urements sh

ower supply

ction currentinuing long

t to be raiseat the same

the above vch cross bon

or current (measured,

values to be

12

he installatiside the link

ase conduc

o be done a

transformeted from the

ormer to fedphase condusformer rat

cord the mer meter.

ry values sw

ansformer ronce again minimum.)

hall be repe

y & wrong c

nt injectiong duration i

ed and sheae link box.

alues, normnding link bo

IC), induced, scaled up

e scaled to

ion works tk boxes are

ctors with b

s per the sa

er verify thee external s

d one groupuctors. (Theting etc.)

etallic scree

witch off th

raise the cuto cross ch

ated in all t

connection i

and measuit may caus

th currents

mal connectox.

d sheath cuand comp

the declar

to be comptheir norma

onding lead

afety guidel

metallic scsources.

p under teste achieved c

en currents

e test equip

rrent requieck the valu

the link box

is deliberat

urements nse to damag

s and sheath

ions are res

urrent (Ish)pared to th

red current

pleted as peal positions

d cables and

ines.

creens curre

t and adjustcurrent valu

and voltag

pment and

red range aues. (The re

es.

ely made at

eed to be tage the cable

h to ground

stored and

and induce acceptab

rating (52

er the appr.

d connected

ents and vol

t it to get a ue shall dep

es at the SV

discharge t

and measureepeated me

t the cross b

aken immee outer shea

voltages sh

currents an

ed sheath ble values a

6A) of the

roved schem

d to the loca

ltages at th

current in tpend on circ

VL points of

he conduct

e the metaleasurement

bonding bo

ediately ath.

hall be

nd voltages

voltage (Esas per the c

approved c

matic

al

e

the cuit

f the

ors

llic s

x.

are

h) to cable

cable

Page 34 of 57

Page 35: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

est Diagra

cceptance

With woulcurre

With correof 65

06/CAB/SAT

am:

e criteria:

correct lid reduce tent rating

correct esponding V.

T ‐

nk connecthe specifi

link connnominal cu

12

ctions, meed current

ections, murrent ratin

asured shet by 3% w

measured ng shall no

eath currehen scaled

sheath vot exceed a

ents shall d up to the

oltages wa maximum

not exceee correspo

when scalem sheath st

d a value onding nom

ed up to tanding vol

that minal

the ltage

Page 35 of 57

Page 36: M. statment lines   cable instal & testing

TP

13

Pu

Eq

Sa

Te

P/TCD/QP‐0

3. Verific

urpose of

Measelectr

quipment AC sin

harmo Three Prote Electr Diese Conne Disch Requi

afety Req Appro Prior No pe Prior

the re Durin

equip

est Proced

1. Prior bondi

2. Far engroun

3. All the4. Conne5. Switc

rangetransf

06/CAB/SAT

cation of

f test:

urement ofrical charact

t used for ngle phase ponic measue phase Varictive glass, rical isolatedl power genecting leadsarge roads.ired safety m

uirementsoved safety to start theersonal shalto the test tequired safeg measurempment

dure for P

to start theing and all tnd bridge tnd. e safety preect the Varih on the aue of 50‐100former ratin

T ‐

f positive

f series sequteristics of c

the test: power meteurement eveiable auto thelmet, safd gloves. nerator s. materials a

s: engineer s

e test Tool bll be permitthe testing ety sign boaments of ele

Positive Se

e test all ththe links insthe three p

eparation toiable auto tuto transfo0 A. (The acng etc.)

13

e and zer

uence impecables and t

er with flexentually. transformerfety shoes.

nd sign boa

hould be avbox talk neetted to workperimeter mards to be pectrical para

equence te

he installatiside the linkhase condu

o be done aransformerrmer to fedchieved cur

ro sequen

edance of 13to ensure e

ible cables

r

ards

vailable at seds to be cok in the vicimust be isoplaced accorameters ne

est:

ion works tk boxes are uctors with

s per the sar to the Sead the circuitrrent value

nce impe

32kV cable effectivenes

(voltage cu

ite full timenducted. nity of the colated and crding to theed to wear

to be comptheir normabonding le

afety guidelling End cont under tes shall depe

edance te

circuit/systs of ground

rrent, frequ

e during the

cable duringcoded with ae requiremeall the pers

pleted as peal positionsead cables a

ines. nductors. st and adjusend on circ

est

tem is to veding method

uency, and p

e test.

g test appropriateent. sonal protec

er the appr. and connec

st it to get cuit length,

rify the d.

power, with

e tags and a

ctive

roved schem

cted to the

a current inconductor

h

all

matic

local

n the size,

Page 36 of 57

Page 37: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

6. Recormeterstick /

7. Againnecesfor ea

8. Calcu

est Diagra

cceptance

Measperm

06/CAB/SAT

rd the valuer and then s/ discharge n switch onssary valuesach test diaglate the pos

am:

e criteria:

sured Positmissible valu

T ‐

es of voltagswitch off trode. n the autos again for egram. sitive seque

tive Sequeue of the c

13

ge, current, he test equ

o transformeach test di

ence by taki

nce Impedcable as pe

power, freuipment and

mer raise tagram. The

ing average

dance valuer Technica

equency andd discharge

the currente test measu

e value of th

e shall not l Data prov

d power facthe conduc

t required urement is

he recorded

exceed thavided by M

ctor values ctors with in

range andto be repea

d readings

an the maxManufactur

by using pnsulated gr

d measuresated three t

ximum rer

ower ound

s the times

Page 37 of 57

Page 38: M. statment lines   cable instal & testing

TP

Te

Te

A

P/TCD/QP‐0

est Proced1. Prior

bondi2. Far en

to the3. All the4. Switc

rangelength

5. Registtest e

6. Againneces

7. Calcu

est Diagra

cceptance

Measperm

06/CAB/SAT

dure for Zto start theing and all tnd and neae local groue safety preh on the aue of 50‐100h, conductoter the meaequipment an switch onssary valueslate the zer

am:

e criteria:

sured Zeromissible valu

T ‐

Zero Sequee test all ththe links insr end bridgnd. eparation touto – transf0 A in all thor size, transasures, voltand discharn the autos again. Thero sequence

Sequenceue of the c

13

ence Impehe installatiside the linkge the three

o be done aformer to fehree condusformer rattage, currenge the condo transform test measue by taking m

e Impedanccable as pe

edance Teion works tk boxes are e phase con

s per the saed the circuuctors. The ting etc. nt, power aductors withmer raise turement is tmean value

ce value shr Technica

st: to be comptheir normanductors wit

afety guideluit under teachieved c

and power h insulated the currentto be repeae of the reco

hall not excl Data prov

pleted as peal positionsth bonding

ines. st and adjucurrent valu

factor valuground stict required ted three tiorded readi

ceed than tvided by M

er the appr. lead cables

ust it to get ue shall de

es and theck. range andimes. ngs.

the maximManufactur

roved schem

s and conne

a current iepend on c

n switch of

d measures

um rer

matic

ected

n the ircuit

ff the

s the

Page 38 of 57

Page 39: M. statment lines   cable instal & testing

TP

14

Pu

Eq

Sa

T

P/TCD/QP‐0

4. High V

urpose of Deter

quipment Reson 5kV in Disch Conne Hand Warn

afety Req Safety Safety Take c

coord Ensur The te Provid Put w Keep Fire e

Test Proce1. TED c2. All th

comp3. Ensur4. All lin5. Far en

cable 6. For HVNote: ‐ th7. GIS sh

earth

06/CAB/SAT

Voltage A

f test: rmine the h

t / Accessonant frequensulation tearge / Earthection leadsTools ing tape &

uirementsy officer shay measures confirmatiodinate with re no other esting area de warning warning signsufficient sextinguisher

edure: clearance shhe necessapleted. re all reportk boxes shand HV cabledocking. V Injection he test arrahall be isolswitch and

T ‐

Alternate

ealthiness o

ories to beency High Voester hing rod s

Caution Boa

s: all be availa to be checon of site reother contrparty workto be comptape inside inside subsupervisor far (C02) shall

hall be availry pre com

ts and recorall be normae compartm

end GIS / Tngement foated and cd line isolato

14

e Curren

of cable ins

e used forolt AC test k

ard

able & safetked by safeadiness froractors befoing in the Gpletely barrie substationstation of ciar end and t be availab

able and TCmmissioning

rds availablealized & covment has be

Testing arranor differentonfirmed nor shall be p

t Test On

ulation afte

r the Test:kit

ty persons tety officer.m GIS cableore starting GIS room anicaded. n and injectiircuit of be testing endle at site.

CD checklistg tests on

e at testing vers shall been prepare

ngement tot makes varnot subject put in open

n 132kv F

er installatio

o be kept a

e box manuthe test. d basemen

ion end whetested during the

t to be clear132kV cab

location. e closed and for HVAC

o done as peries and detto cable Hcondition a

Feeder C

on before e

t all entran

facturers at

t.

ere the circ

test.

red. bles and in

d provide wtesting, inc

er the maketails are proV testing vat remote e

Cables

nergizing.

ce / exits.

t substation

cuit to be te

nstallation

with padlockcluding HV l

e of GIS /reqovided in thvoltage by knd S/s.

n and

sted.

works sha

k. ink fixing d

quirement. he below Chkeeping the

ll be

uring

hart e line

Page 39 of 57

Page 40: M. statment lines   cable instal & testing

TP

P/TCD/QP‐0

8. Check9. Keep 10. All sa

comm11. Carry 12. Test v

shall b13. When

for 1 14. PD me15. The v

frequ16. The co17. After

prope18. After 19. Proce20. After 21. The te

22. After cham

1. ABB ma6.1 At 6.2 Bo

con

6.3 CT app

6.4 VT 6.5 Ens

op6.6 Tes

Phph

……………19.1 Ot

iso

06/CAB/SAT

klist for HVAmin 1.25m afety pointsmunicate wiout the corvoltage shabe set to 50n resonancemin. easuremenvoltage shalency on tesonnected cthe test fi

er earth rodHVAC, PD medure 7 to 1completionest results a

completionber shall be

ake: ‐ HV tesapplying enth Line eandition at a(If voltage condition ashorting anplying substisolation issure Circuiten conditiost adapter aase selectioases shall b…………………ther phaseolator shall

T ‐

AC shall be fclearance os to be cheth remote ere insulationll be applie0kV in HVACe frequency

t shall carryll be raisedst format. ables shall binished allod. monitoring 18 shall be rn of PD meaare recorde

n of the HVe normalize

st can be do

nd, link shalrth switchepplying endis not inje

and respectnd earthingtation end. s must and Vt breaker is on at injectinand test leaon is depebe earthed a……………………s shall be be changed

14

followed. of test leadsecked befoend. n resistanceed from tesC kit. y matches, v

y out at 76k to 132kV f

be tested wow the self

shall be donepeated foasurement, d in test for

VAC test thd.

one one phas

ll be fixed. es shall bed substationcted for anive line eartg is necessa

VT isolator in open cong end S/s.ad shall be ends upon automatical…………………repeated bd.

s and grounore switchin

e test for east lead fixed

voltage sha

kV & 114kV.for perform

with 132kV ff‐dischargin

ne as per Dr each phasIR test shalrmat.

he test lead

se at a time o

e opened an. ny group, reth switch shary, because

shall be opondition and

fixed at comthe adaptolly. ……………………by without

nd the armang on the p

ach core befd at injectio

ll rise autom

. ming the HV

for one houng of the in

EWA Standse / Group. l be carried

d and adap

or G‐1 R pha

and line iso

espective lihall be kepte the CT is s

pened manud maintena

mmon placor phase se

…………………changing

ature part opower supp

fore & afteron end as m

matically up

VAC, and re

ur in one shonstrument

ard at 76kV d out.

ptor shall b

ase and G‐2 R

olators sha

ine isolator closed consubject to H

ually at injecnce earth s

e for both telection. If

……………………the adapto

of the test leply to the

r HVAC testmentioned.

p to 50kV a

ecord charg

ot. and finally

V and 114 kV

be removed

R phase can

ll be switc

r shall be kdition). HV cable tes

cting end. switch after

the cable cR phase s

…………………or/ only res

ead. testing set

t. Testing vo

nd shall be

ging current

discharge

V.

d and the c

be combine

ched to clo

kept in ope

sting at volt

r the breake

hamber groselected, ot

……………………spective gr

t and

oltage

kept

t and

with

cable

ed)

osed

ened

tage

er in

oup. ther

…….roup

Page 40 of 57

Page 41: M. statment lines   cable instal & testing

TPP/TCD/QP‐0

2. JAEPS /6.1 At 6.2 cor6.3 Tes

pre

6.4 Linop

6.5 CT sub

……………19.1 Oth19.2 Lin

con

3. Siemen6.1 G‐1

consha

6.2 Forflu

6.3 CT 6.4 VT 6.5 Ens

op6.6 Tes

GIS……………19.1 Fo

tois

19.2 Fo

06/CAB/SAT

/ Toshiba mapplying enrona ring shst adapter essure of SF(For Single link or rod ne earth swen conditioshorting anbstation en…………………her group sne earth swndition.

ns make: ‐HV1 Line eartndition at aall be in Opr G1 HV tese line in the(For Single through bashorting anisolation issure Circuiten conditiost adapter aS compartm…………………or G2 HV teo close condolator G1 toor G2 HV te

T ‐

make: ‐ HV tend, link shalhall be fixedand test leF6 in both scable injecavailable in

witches (G‐1on. nd earthingd. ……………………shall be repeitches (G2

V test can be

th switchesapplying endpened condst, all three e test bushicable injecre conductond earthings must and Vt breaker is on at injectinand test leaments confir……………………est, Line eardition at apo be kept inst, all three

14

est can be do

ll fixed for Jd over the toead shall beubstation.ction, othern the adapto1 shall be o

g is not nece

…………………eated by chshall be op

e done 3 pha

shall be od substatioition phases shang. ction, otheror in the tesg is necessaVT isolator in open cong end S/s.ad shall be rmed for no…………………rth switchespplying endn Open conde phases sha

one 3 phase

AEPS makeop of bushine fixed at G

r Phases in or). opened, G‐

essary, beca

……………………hanging the ened, G1 c

ases at a tim

opened andn. G2 line e

all be shorte

r phases shst bushing).ry, as CT is shall be opondition and

fixed at comormal pressu……………………s G2 shall bd substationdition. all be shorte

s at a time

. ng at HV injGr‐1. GIS c

G‐1 shall b

2 closed) a

ause the CT

…………………adaptor. losed) and

me.

d G‐1 line earth switch

ed with bar

hall be eart. subject to H

pened manud maintena

mmon placure of SF6 i…………………be opened an. G1 line e

ed with bar

jection sidecompartmen

be earthed

and line iso

T is not subj

……………………

line isolato

isolator shah shall be c

re conducto

hed manua

HV testing aually at injence earth s

e for both tn both subs……………………and line isoearth switch

e conducto

nts confirm

by manuall

olator (G‐1

ject to HV c

…………………

or (G1 &G2)

all be switcclosed and G

or covered w

ally by exte

at injection cting end. switch after

the cable cstation. …………………lator G2 shh shall be c

r in the test

med for nor

ly inserting

&G‐2) rem

cable testin

……………………

) remains o

ched to cloG2 line isola

with Alumin

rnal ground

S/S end.

r the breake

hamber gro

……………………all be switcclosed and

t bushing.

rmal

the

ains

ng at

…….

open

osed ator

num

ding

er in

oup.

…….ched line

Page 41 of 57

Page 42: M. statment lines   cable instal & testing

TPP/TCD/QP‐0

4. Mitsubi6.1 At 6.2 Lin

con6.3 CT

sub6.4 Tes

no………………19.1 O

5. AREVA 6.1 CT s

sub6.2 Tes

end6.3 The

be c……………19.1 Af

ch19.2 Te

apea

6. Tempor6.1 T6.2 H6.3 T

………………20.1 O

7. Out Doflue).

6.1 T6.2 C6.3 T

………………20.2 O

06/CAB/SAT

ishi make: Happlying enne earth swndition. shorting anbstation enst adapter armal pressu…………………ther Group

make: ‐ HVshorting anbstation endt adapter &d substatione earthing oconnected w…………………fter complehamber shaest adaptorpplying endarthed in GI

rary TerminTemporary tHVAC test kTest lead sh…………………Other Group

or Sealing E

Test lead shCarry out thTest leads sh…………………Other Group

T ‐

HV test can

nd, link shalwitches (G1

nd earthingd. and test leaure of SF6 in……………………s shall be re

V test can be

nd earthing d. & test lead sn, other phaof cable shawith GIS bo……………………etion of thell be normar and test ld /injecting IS cable cha

nation: HV tterminationkit shall be phall be fixed……………………ps shall be r

End: HV tes

all be laid fe core insuhall be conn……………………ps shall be r

14

be done 3 p

ll not be fixe1 & G2) sh

g is not nece

ad shall be n both subs…………………epeated by

done R&B p

is not nece

shall be fixeases G1 B anall be done ody. This ear………………… HVAC test alized. lead shall bend substa

amber.

test can be d

n shall be prplaced at te from the H…………………repeated (if

t for all6 ph

rom test selation resistnected with…………………repeated (if

hases at a ti

ed. all be clos

essary, beca

fixed at Gr‐tation.

……………………changing th

phases from

essary, beca

d at Gr‐1, Rnd G2 R & Ymanually brthing shall ……………………the test le

be fixed at ation, the o

done all 6 ph

repared at tmporary teHV kit to the……………………f any) by ch

ases at a tim

t to ODSE atance test fh outdoor se…………… ……f any) by ch

me by short

ed and line

ause the CT

‐1 any phas

…………………he adaptor

one group &

ause the CT

R, B and Gr‐Y shall be eay shorting tbe ensured…………………ad and ada

Gr‐2 R, B other phase

hases at a tim

the HV injecrmination.e Temp. term…………………anging the

me (Shorting

and shall befor each corealing end, …………………anging the

ting internall

e isolator (

T is not subj

ses. GIS com

……………………

& Y phase fro

T is not subj

2, Y phase carthed insidthe cable wd during cab……………………aptor shall b

and Gr1‐Y es G1 R, B

me (Shorting

ction end..

mination, p……………………temporary

g with 16sqm

connectedre before & providing A…………………test lead co

ly inside the

(G1 & G2)

ject to HV c

mpartments

…………………

om other gro

ject to HV c

cable chame GIS Cable

with bare coble test prep…………………be removed

phases caband G2, Y

g with 16sqm

providing Alu…………………test adapto

mm Cu Wire

with test safter HVAC

Aluminum fl…………………onnection.

e GIS chambe

remains o

cable testin

s confirmed

……………………

oup at a tim

cable testin

ber at applye Chamber.nductor anparation its……………………d and the ca

ble chambephase shal

mm Cu Wire)

uminum flu……………………or

with Alumin

et. C test. ue. …………………

er.

open

ng at

d for

….

me.

g at

ying

d to elf. …….able

er in l be

.

ue. ….

num

….

Page 42 of 57

Page 43: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

Remarks:

est Diagra

cceptance

The tnew cat a f

06/CAB/SAT

If cable len

am:

e Criteria:

test can becable, 106 frequency r

T ‐

ngth is mo

:

deemed pkV AC voltrange of 20

14

ore, HV Inje

passed, if ittage / phas0‐300Hz w

ection shal

t withstandse (U0 X 1.

without any

ll carry out

ds 132 kV A7 X 0.8) foy breakdow

t for only o

AC voltage r old cablewn during t

one phase

per phasee for a durahis period.

at a time.

e (U0 X 1.7)ation of 1 h.

) for hour

Page 43 of 57

Page 44: M. statment lines   cable instal & testing

TP

15

Pu

Eq

Sa

T

P/TCD/QP‐0

5. Partia

urpose of Deter

quipment Reson PDM Disch Conne Hand Warn

afety Req Safety Safety Take c

coord Ensur The te Provid Put w Keep Fire e

Test Proce1. All req2. Identi3. Moun4. Lay th5. Provid6. Switc7. Confir8. Creat9. Inform10. BG no

06/CAB/SAT

al Dischar

f test: rmine the h

t / Accessonant frequeKit arge / Earthection leadsTools ing tape &

uirementsy officer shay measures confirmatiodinate with re no other esting area de warning warning signsufficient sextinguisher

edure: quirementsify and confnt the UHF che UHF cablde and exteh on PD equrm the come substatiom the HV teoise level se

T ‐

rge Mea

ealthiness o

ories to beency High Vo

hing rod s

Caution Boa

s: all be availa to be checon of site reother contrparty workto be comptape inside inside subsupervisor far (C02) shall

s for HVAC tfirm the cabcoupler on tle and connernal grounduipment an

mmunicationn folder perest coordinaensitivity 76

15

suremen

of cable / Te

e used forolt AC test k

ard

able & safetked by safeadiness froractors befoing in the Gpletely barrie substationstation of ciar end and t be availab

test to be coble ( Feederthe stress cnect one endd before swnd Laptop ann between pr test and sator for the 6kV BHV, 10

nt Test O

ermination

r the Test:kit

ty persons tety officer.m GIS cableore starting GIS room anicaded. n and injectiircuit of be testing endle at site.

ompleted r and phasecone of the d of UHF cawitch on thend confirm processor uub folder foreadiness o

06kV BHV, 1

On 132kv

after instal

o be kept a

e box manuthe test. d basemen

ion end whetested during the

e) to be testcable termible to the ce portable kthe systemnit and laptor the PD mof PD measu06 AHV and

Feeder C

lation befo

t all entran

facturers at

t.

ere the circ

test.

ed ination for tcouple whicit. is working top is intacteasuremenurement. d 76 AHV.

Cables

re energizin

ce / exits.

t substation

cuit to be te

the individuch as per dra

properly t. nt voltage as

ng.

n and

sted.

ual. awing attac

s given belo

ched.

ow.

Page 44 of 57

Page 45: M. statment lines   cable instal & testing

TP

Te

A

P/TCD/QP‐0

11. In cascreate

12. Checkachiev

13. The a14. Perfo15. Confir16. In cas

to kno17. Proce18. The te

est Diagra

cceptance

Durin

06/CAB/SAT

se of any ed for the ink the backgve better sibove exercrm PD couprm the coupse of any abow the injecedure 8 to 1est report t

am:

e criteria:

ng testing a

T ‐

abnormalitnvestigationground noignal to noisise should npler sensitivpler sensitivbnormality oction on ext15 shall be ro be record

at 76kV & 1

15

ty observedn. ise level anse ratio. not affect sevity test by ivity for the observed thtinction volepeated foded in test f

114kV no P

d during PD

nd adjust t

ensitivity ofinjecting 20all cable to he PD can betage level fr other phaformat.

PD shall de

D measure

the thresho

f the PD cou0V with CAL be tested ae measuredor PD activise / Group

etected.

ment addit

old level an

upler 2B PD pulsat a record. d different vity. cables.

tional sub

nd add har

e injector.

voltage leve

folder mus

rdware filte

el (below 10

st be

er to

06kV)

Page 45 of 57